DEPARTMENT CIRCULAR NO. DC2015-07-0014

PRESCRIBING THE POLICY FOR MAINTAINING THE SHARE OF RENEWABLE
ENERGY (RE) RESOURCES IN THE COUNTRY'S INSTALLED CAPACITY
THROUGH THE WHOLISTIC IMPLEMENTATION OF THE PERTINENT
PROVISIONS OF REPUBLIC ACT NO. 9513 OR THE RE ACT ON FEED-IN TARIFF
(FIT) SYSTEM, PRIORITY AND MUST DISPATCH, AMONG OTHERS

[Note: Issued June 26, 2015. Establishes 30% RE capacity share policy and mandates FIT auction
rounds for installation targets after initial FiT slots are fully subscribed. The OCR table showing FIT
installation targets (Run-of-River Hydro, Wind, Solar) was garbled; solar was raised from 50 MW to
500 MW and wind from 200 MW to 400 MW per the whereas clauses.]

WHEREAS, Republic Act No. 7638 or the "Department of Energy (DOE) Act of 1992"
declares as a policy of State, among others, to ensure a continuous, adequate, and
economic supply of energy through the integrated and intensive exploration, production,
management, and development of the country's indigenous energy resources;

WHEREAS, Republic Act No. 9136 or the "Electric Power Industry Reform Act of 2001"
or the EPIRA declares the policy of the State to:

(a) Ensure the quality, reliability, security and affordability of the supply of electric power;
and

(b) Promote the utilization of indigenous and new and RE resources in power generation
in order to reduce dependence on imported energy;

WHEREAS, pursuant to Section 37 of the EPIRA, the DOE is mandated to supervise the
restructuring of the electric power industry as well as, among other things, to:

(a) Formulate policies for the planning and implementation of a comprehensive program for
the efficient supply and economical use of energy consistent with the approved national
economic plan and with the policies on environmental protection and conservation and
maintenance of ecological balance, and provide a mechanism for the integration,
rationalization, and coordination of the various energy programs of the Government;

(b) Develop policies and procedures and, as appropriate, promote a system of energy
development incentives to enable and encourage electric power industry participants to
provide adequate capacity to meet demand including, among others, reserve requirements;
and

(c) Formulate such rules and regulations as may be necessary to implement and attain the
objectives of the EPIRA.

WHEREAS, Republic Act No. 9513, or the "Renewable Energy Act of 2008" (RE Act)
declares the following as the policy of the State to:

(a) Accelerate the exploration and development of RE resources to achieve energy
self-reliance, through the adoption of sustainable energy development strategies to reduce
the country's dependence on fossil fuels and thereby minimize the country's exposure to
price fluctuations in the international markets, the effects of which spiral down to almost all
sectors of the economy;

(b) Increase the utilization of renewable energy by institutionalizing the development of
national and local capabilities in the use of RE systems, and promoting its efficient and
cost-effective commercial application by providing fiscal and non-fiscal incentives;

(c) Encourage the development and utilization of RE resources as tools to effectively
prevent or reduce harmful emissions and thereby balance the goals of economic growth and
development with the protection of health and the environment; and

(d) Establish the necessary infrastructure and mechanism to carry out the mandates
specified in the Act and other existing laws.

WHEREAS, on 25 May 2009, the DOE issued DC2009-05-0008 entitled the "Rules and
Regulations Implementing Republic Act No. 9513 (RE IRR)" which provided the general
rules, regulations and guidelines for the development of RE resources in the country;

WHEREAS, the DOE issued DC2009-07-0011 entitled "Guidelines Governing a Transparent
and Competitive System for Awarding RE Service Contracts" on 12 July 2009 in support of
the awarding of RE service contracts;

WHEREAS, on 12 July 2010, pursuant to Section 7 of the RE Act and Section 5 of the
RE-IRR, the Energy Regulatory Commission (ERC) issued Resolution No. 16, Series of
2010 entitled "Resolution Adopting the FIT Rules;"

WHEREAS, on 14 June 2011, the DOE published the National RE Plan (NREP) providing
for the target to increase the share of RE resources share in installed capacity from 5,438
MW in 2010 to 15,304 MW by 2030;

WHEREAS, on 30 June 2011, after public consultation and review of the recommendation
of the National RE Board (NREB), the DOE endorsed to the ERC the initial installation
targets for FIT-eligible RE resources;

WHEREAS, the DOE through DC2011-07-0007 dated 05 July 2011 directed the full
cooperation of the National Grid Corporation of the Philippines (NGCP) for the integration
of RE resources into the country's transmission development plan;

WHEREAS, the DOE issued DC2013-05-0009 dated 28 May 2013 entitled "Guidelines for
the Selection Process of RE Projects under the FIT System and the Award of Certificate for
FIT Eligibility," instituting the first-come-first-served basis for the DOE Certificate of
Endorsement (COE) for FIT Eligibility;

WHEREAS, the DOE issued DC2015-03-0001 on 20 March 2015 entitled "Promulgating
the Framework for the Implementation of Must Dispatch and Priority Dispatch of RE
Resources in the Wholesale Electricity Spot Market (WESM);"

WHEREAS, the development and optimal use of the country's RE resources is an integral
part of the DOE's Energy Reform Agenda, with RE resources being vital to addressing the
challenges of climate change, energy security, sustainability and the broader access to
energy;

WHEREAS, the country's RE resource assessment shows vast amounts of RE sources that
are yet to be developed on top of the more than 10,600 MW potential capacity already
covered by registered RE projects with existing RE service/operating contracts that are
currently being implemented as of 31 March 2015;

WHEREAS, to date the DOE has endorsed an increase of the FIT installation targets for
solar from 50 MW to 500 MW and wind from 200 to 400 MW in light of the developments
in the demand-supply situation;

WHEREAS, based on the 2014 DOE Power Statistics, 25.64 percent (25.64%) of the
country's total power generation are sourced from RE facilities, or equivalent to installed
generating capacity of about 32.87 percent (32.87%) of the country's total installed
capacity; and

WHEREAS, there is a need for the DOE to issue a policy that ensures and maintains the
share of RE in the country's installed capacity, thus ensuring energy sustainability, security
and independence.

NOW, THEREFORE, for and in consideration of the foregoing premises and pursuant to its
mandate under the DOE Act, EPIRA and the RE Act and its implementing rules and
regulations, the DOE declares the following:

---

Section 1. Title. This Circular shall be known as the "Guidelines for the Policy of
Maintaining the Share of RE in the Country."

Section 2. Policy Statement. To maintain the share of RE in power generation, the DOE
hereby adopts a policy of maintaining at least **thirty percent (30%)** share of RE in the
country's total power generation capacity through the wholistic implementation of the FIT
System and other pertinent provisions under the RE Act and RE IRR.

Section 3. Responsibility for Forecasting and Replacement Power. To balance the
impact of RE in the grid, the RE Developer of FIT-eligible resources shall be responsible
for the nomination and the dispatch of generated power from its generation facilities:
Provided, That for deviations outside the prescribed range set per FIT-eligible technology,
the RE Developer shall be responsible for procuring the replacement power.

Section 4. FIT Auction. To ensure the attainment of Section 2 of this Circular, the DOE
will use the FIT installation targets. Upon the **full subscription** of the existing FIT
installation targets, the succeeding rounds for the installation targets for FIT-eligible
resources shall be made through an **auction system** to be adopted by the DOE.

In the determination of the installation targets for each FIT-eligible resource, the DOE
shall be guided by, among other things, the impact or taking into account distribution and
grid security (interconnection, location and technical), cost and other considerations:
Provided, That the auction for the installation targets for FIT-eligible resources may only
be made upon the issuance of the implementation of the Must-Dispatch Implementing
Rules and Regulations.

Section 5. Compliance with the Renewable Portfolio Standard (RPS). Upon the
issuance of the Renewable Portfolio Standard (RPS) Rules under Section 6 of the RE Act,
compliance with the provisions herewith shall likewise be deemed compliance with the RPS.

Section 6. Information, Education and Communication (IEC) Activities to
Stakeholders. Pursuant to Rule 10, Section 31 of the RE IRR, the DOE shall implement an
intensive and massive IEC activities that are designed to increase public awareness and
appreciation of the Guidelines and the RE industry as a whole.

Section 7. Separability Clause. If for any reason, any section or provision of this Circular
is declared unconstitutional or invalid, such parts that are not affected shall remain in full
force and effect.

Section 8. Repealing Clause. Any department circular or issuance, contrary to or
inconsistent with this Circular is hereby repealed, modified or amended accordingly.

Section 9. Effectivity. This Circular shall take effect fifteen (15) days after publication in
two (2) newspapers of general circulation and shall remain in effect until otherwise revoked.

Issued at Energy Center, Rizal Drive, Bonifacio Global City, Taguig City.

June 26, 2015

Secretary