CHAPTER 3.
POWER SECTOR
ROADMAP
2023-2050
(Short-, Medium-, and Long-Term)

POWER DEVELOPMENT PLAN 2023-2050

100

=== pdp-2023-2050-ch3-page-101.pdf ===
CHAPTER III

Power Sector Roadmap 2023-2050
In this chapter, the DOE will present the new power sector roadmaps for generation,
transmission, distribution, supply, electricity market, off-grid development, and total
electrification. The updated roadmap is divided into three-term goals, the short-term,
medium-term, and long-term. These roadmaps are anchored on three main goals by
2050 namely:
•
•
•

Energy security, resiliency, affordability, and sustainability.
Transparent and fair playing field in the power industry; and
Electricity access for all.

By presenting these goals, the power sector roadmap sets a clear and comprehensive
trajectory towards a future characterized by energy security, fairness, and
accessibility for all. The integration of smart grid technologies and improvements to
the sector's database further align these roadmaps with the evolving needs and
challenges of the energy landscape.

Goal 1: Energy Security, Resiliency, Affordability and Sustainability

1.

Generation

Short Term
2023-2024
•

•

•
•

Smooth integration of new and
emerging power generation
technologies into the country’s
energy mix
Enhance policy on the
performance and operation of
generation facilities toward selfhealing grid system.
Policy support to incentivize
more investments in generation.
Development of omnibus
guidelines for the processing of
generating unit/s requirements
for commercial operation and
other purposes

Medium Term
2025-2028
•

•

Smooth integration of new and
emerging power generation
technologies into the country’s
energy mix
Policy on Virtual Power Plant /
Consolidation of Distributed
Energy Resources System

Long Term
2029-2050
•

•

Enhance and utilize non-fossilbased energy in power
generation in support of cleaner
energy transition and
decarbonization.
Increase power generation
flexibility

1. Smooth integration of new and emerging power generation technologies into the
country’s energy mix
Aligned with the nation’s commitment to transitioning to a cleaner and more
sustainable energy resources, the DOE is proactively exploring strategies to diversify
and integrate new and emerging power generation technologies in the energy
mix, anchored to enhancing the power supply security and reliability of the
country’s energy mix.

POWER DEVELOPMENT PLAN 2023-2050

101

=== pdp-2023-2050-ch3-page-102.pdf ===
In this PDP update, the DOE has taken proactive move by incorporating various
new emerging technologies (e.g., offshore wind, nuclear, energy storage system,
and liquefied natural gas) into the generation capacity expansion planning. The
goal is to offer valuable guidance to potential investors and financing institutions,
providing insights into productive investment opportunities within the country.
On the policy and regulatory side, the DOE will identify potential barriers, propose
incentives, and formulate supportive policies to promote the adoption and create
a conducive environment for these new emerging technologies. The DOE will assess
the reliability of these new technologies to ensure a consistent and stable power
supply consistent with its mandate under the RA No. 9136, EPIRA Section 3737.
Further, to develop backup systems and contingency plans to maintain energy
security in case of unexpected failures or disruptions.
2. Enhance policy on the performance and operation of generation facilities toward
self-healing grid system
As the country endeavors to achieve the targets of 35% and 50% RE share by 2030
and 2040, respectively, the reliability of the power system is expected to face
heightened vulnerability due to the intermittent nature of incoming renewable
sources. Given these anticipated challenges, it is essential that generation facilities
must be resilient, dependable, and adaptable to any abrupt changes in the power
network. The incorporation of energy storage systems, smart-grid technologies, and
distributed energy sources will play a crucial role in mitigating the impact of RE
sources, as it will provide buffer for abrupt changes in the power supply and
demand dynamics. Achieving interoperability is also one of the key focuses, as it
will enhance the overall flexibility and adaptability of the power system. The DOE
will formulate policies to foster adaptable and reliable power systems in the face
of an evolving energy landscape, as well as ensure that the generation sector will
seamlessly integrate with these advanced systems and components.
3. Policy support to incentivize more investments in the generation sector
Given the existing policy framework primarily centered on fiscal and non-fiscal
incentives, the DOE is committed to continually devise policies and programs that
will further incentivize investments in the generation sector. Some of these measures
are currently under discussion within the Department are:
a) Collaboration between the government and financial institutions,
facilitated by the DOE's IPO, will enable conversations aimed at improving
financial access for potential investments in the energy sector. Following a
recent roundtable discussion with lenders and financing institutions, the IPO
is set to initiate a sequence of sessions and engagements aimed at
supporting and conducting an information campaign about the
upcoming developments in the Philippine energy sector. This will include
exploring other approved equivalent requirements, such as auction
programs and WESM options, as viable alternatives to the intricate longterm power supply agreement requirements.

37 EPIRA Section 37 entitled, “Role of the Department of Energy”

POWER DEVELOPMENT PLAN 2023-2050

102

=== pdp-2023-2050-ch3-page-103.pdf ===
b) RE Projects Grid Connection – The DOE, in collaboration with the National
Transmission Corporation (TransCo) and a group of technical consultants38
initiated the formulation of a Smart and Green Grid Plan (SGGP) that seeks
to establish a comprehensive roadmap for transforming the country’s
existing electric grid into a smart, green, and sustainable transmission
system in support of the Philippine Energy Transition Program (PETP). The
SGGP aims to intricately design the Philippines' Transmission Network,
encompassing existing infrastructure and expansion plans to
accommodate incoming generation projects as outlined in the Clean
Energy Scenario goals of the country. The SGGP aims to seamlessly
integrate additional RE power projects that are expected to become
operational from 2024 to 2050.
4. Development of omnibus guidelines for the processing of generating unit/s
requirements for commercial operation and other purposes
The DOE is set to formulate an omnibus guideline, which will serve as a unified
framework consolidating all existing policies, application processes within the
EVOSS, and other pertinent permitting procedures. This consolidated guideline is
intended to streamline and harmonize the elements involved in obtaining
approvals and permits, ensuring a more efficient and coherent process for projects
leading up to their commercial operation.
5. Policy on Virtual Power Plant / Consolidation of Distributed Energy Resources System
Advancements in technology are enhancing energy efficiency, cutting costs, and
promoting environmental sustainability. As the power industry evolves, there is a
growing focus on incorporating innovative concepts like Virtual Power Plants (VPPs)
and Distributed Energy Resources (DERs).
DERs, as defined in ERC Resolution No. 17, Series of 202339, refers to power sources
connected to the Distribution System or electrical system of the End-Users, that
could be aggregated to meet a demand. These are decentralized networks of
small-scale energy equipment (solar, wind, or hydro), energy storage systems,
intelligent grid management technologies, and demand response mechanisms of
end-users, among others, are connected within a system network. VPP40, is defined
as an aggregator that bundles and optimizes the use of DERs. The purpose of VPP
is to operate various DERs, such as renewables and storage systems among others,
as a unified and optimized entity which allows them to collectively meet size
requirements for participating in wholesale energy markets.

38 Funded by the United States Agency for International Development (USAID) under the Energy Secure Philippines

(ESP) Project.
39 Entitled, “A Resolution Adopting the 2023 Revised Rules for the Issuance of Certificates of Compliance for
Generation Facilities” issued on 13 September 2023
40 Aggregators, Innovation Landscape Brief, International Renewable Energy Agency (IRENA)
Retrieved through: https://www.energy.gov/sites/default/files/2022-11/DOE-LPO-Poster-Series-05-VPP.pdf

POWER DEVELOPMENT PLAN 2023-2050

103

=== pdp-2023-2050-ch3-page-104.pdf ===
The DOE is currently looking into possible avenues to encourage the deployment
and adoption of these technologies through the creation of a policy framework
and introduction of incentive programs (e.g. market participation, interoperability
mechanisms, and grid-readiness to accept such technologies among others).
6. Enhance and utilize new technologies in power generation in support of cleaner
energy transition and decarbonization
The DOE is actively advancing cleaner energy transition and decarbonization by
embracing new technologies in power generation. This strategic initiative involves
introducing conducive policies, incentives, and development goals to purposefully
transform the country's power generation mix.
In the RE sector, the DOE has already introduced significant policies to boost the
entry of RE sources, including the Renewable Portfolio Standard (RPS), Renewable
Energy Market (REM), the Green Energy Option Program (GEOP), and conduct of
Green Energy Auction (GEA). A significant development in the RE industry is the
legal opinion issued by the Department of Justice (DOJ) on 29 September 2022,
regarding the maximum (100.0%) foreign equity participation in exploring,
developing, and utilizing solar, wind, hydro, and ocean or tidal energy resources.
This opinion is expected to be a game-changer, thereby reducing costs associated
with RE projects in the country.
Furthermore, the DOE considers nuclear technology as a viable, stable, and
emission-free energy option for the Philippines, given that it has been globally
recognized to provide diverse applications in the energy sector. In adherence to
the commitment to explore alternative energy resources to ensure supply security
as mandated by the EPIRA, the government actively engages in studying and
advancing the development of nuclear energy by implementing policies and
programs to support and promote the exploration of nuclear power development
as a significant component of the country's energy mix.
EO No. 116, Series of 202041, issued on 24 July 2020, mandates a study for adopting
a National Position on the Nuclear Energy Program (NEP) in accordance with
pertinent International Atomic Energy Agency (IAEA) guidelines, relevant laws,
rules, and regulations. Moreover, it establishes the Nuclear Energy Program InterAgency Committee (NEPIAC) which is tasked to formulate the national position on
NEP and come up with a national strategy and roadmap including measures to
address the challenges under the Milestones Approach of the International Atomic
Energy Agency (IAEA), consisting of 19 Nuclear Infrastructure Issues. NEPIAC
summarizes these infrastructure issues into four areas tagged as “The Four
Cornerstones Approach” comprising of National Policy, Legislative Framework,
Alignment with International Standards, and Public Awareness. Further advancing
the NEP, former President Rodrigo R. Duterte through EO No. 164, Series of 202242
approved the Philippines’ Nuclear Power Program on 28 February 2022. This
directive aims to utilize nuclear power to address the anticipated decline of coal41 Entitled, “Directing a Study for the Adoption of a National Position on Nuclear Energy Program, Constituting a Nuclear

Energy Program Inter-Agency Committee, and for Other Purposes.”
42 Entitled, “Adopting a National Position on a Nuclear Energy Program and for Other Purposes.”

POWER DEVELOPMENT PLAN 2023-2050

104

=== pdp-2023-2050-ch3-page-105.pdf ===
fired power plants with the existing coal moratorium advisory along with coal
repurposing based on the directive on Energy Transition towards cleaner energy in
the future. The government, under this order, is empowered to adopt and
implement a national position for the NEP, ensure peaceful nuclear technology use,
assess, and develop NEPs, engage with stakeholders, and make recommendations
on the viability of nuclear power installations in the country.
Lastly, considering the Philippines’ abundant ocean and water resources, the DOE
is continuously exploring and conducting further research on the ocean thermal
conversion potentials. Concurrently, the DOE is delving into the study of hydrogenbased technologies, exploring avenues such as co-firing and mechanisms linked to
renewable energy.
7. Increase power generation flexibility
The DOE had already identified the need to import Liquefied Natural Gas (LNG)
in the future due to the depleting supply of indigenous natural gas in the country
from the existing Malampaya gas facility. Natural gas has less carbon dioxide
emission compared to coal and fuel oil. Increasing flexibility in power generation
enables the system to synchronously adapt and adjust to dynamic conditions at
any given time, resulting in optimized electricity demand and supply flow.
Power generation from natural gas is greatly pushed to provide the baseload,
intermediate, or mid-merit supply requirement of the country, as well as
replacement to coal and fuel oil in the future. Mid-merit gas power plants are
load-following plants that can easily adjust their power production with the
fluctuations in electricity demand.
As of 31 December 2022, a total of 3,500 MW committed installed capacity from
natural gas is expected to be operational from 2022 to 2025. The DOE closely
monitors the development of these projects, along with the 9,090 MW indicative
natural gas capacity, which is still under the pre-development stage. These
natural gas power plants, along with the existing ones should be fueled by the
seven (7) proposed LNG terminal facilities that are expected to be completed
from 2023 to 2026, to wit:
Table 53. List of LNG Terminal Facilities in the Philippines
Proponent

Project

FGEN LNG
Corporation

Interim Floating
Storage and
Regasification
Unit (FSRU)

Linseed Field
Corporation

Floating
Storage Unit
(FSU) and
Onshore
Regasification
and 60,000

LNG
Storage
Capacity43

Location

5.26 MTPA

Batangas
City,
Batangas

3 MTPA

Batangas
City,
Batangas

Estimated COD

Anchor Market

September 2023
(LNG Terminal)

Existing gas-fired power
plants

August-Sept 2023
(LNG Delivery)

Proposed Fgen facilities
extension

April 2023 (FSU
and onshore
regasification

1,200 MW Ilijan Power
Plant
Batangas Combined
Cycle Power Project

43 1 metric tonnes per annum (MTPA) is roughly equivalent to 1000 MW as per Oil Industry Management Bureau

POWER DEVELOPMENT PLAN 2023-2050

105

=== pdp-2023-2050-ch3-page-106.pdf ===
Proponent

Project

LNG
Storage

Location

Capacity43

cbm buffer
LNG storage
tank
Energy World
Gas
Operations
Philippines
Inc.

LNG Storage
and
Regasification
Terminal

Estimated COD

Anchor Market

April 2023 (LNG
delivery)44

3 MTPA

Luzon LNG
Terminal Inc.

FSRU LNG
Terminal

4.4 MTPA

Vires Energy
Corporation

FSRU Terminal

3 MTPA

Pagbilao,
Quezon
Batangas
bay within
the
municipal
waters of
Mabini and
San
Pascual,
and city
water of
Batangas
Batangas
City,
Batangas

December 2023
(Unit 1 GT)45

Self-owned Gas-fired
power plant (under
construction)

EGCO Group46
December 2025
3rd party access mode47

April 2026

Proposed 500 MW
Floating Power Plant
AC Energy proposed
gas-fired power projects
in Mariveles and Subic

Shell Energy
Philippines, Inc.

Samat LNG
Corporation

FSRU Terminal

Small-scale
LNG terminal

3 MTPA

14,400 m3

Batangas
City,
Batangas

Mariveles,
Bataan

September 2025

May 2025

JG Summit for 81 MW
existing power plant
and 30-40 MW
expansion
BCE 1,100 MW Proposed
Power Plant
Ingrid Power Holding’s
40 MW conversion from
diesel to natural gas
Manufacture industries
within 300-km radius of
the terminal

Pursuing greater flexibility also allows the integration of variable RE (VRE) like solar
and wind technologies. Flexible power plants like natural gas can reduce their
electricity generation output (quicker than baseload power plants with longer
ramp-up and down periods) when solar and wind production are at their highest.
This flexibility of power generation facilities allows the reduction of VRE curtailment
and maximizes its operating capacity during its economic life.

44 Update as of July 2023
45 Update from DOE site inspection in November 2022
46 Small-scale LNG break bulk
47 Transparent and non-discriminatory open access model

POWER DEVELOPMENT PLAN 2023-2050

106

=== pdp-2023-2050-ch3-page-107.pdf ===
Goal 1: Energy Security, Resiliency, Affordability and Sustainability

2. Transmission and System Operation
Short Term
2023-2024
•
•

•
•

•
•

Assess the performance of the
transmission system operator.
Review and develop policy on
the reliability requirements of
the grid, including system
protection.
Enhance the Transmission
Development Planning
Establish a coordination system
to ensure the timely completion
of transmission projects.
Develop supplementary policies
for Ancillary Services
Interconnect the Luzon, Visayas,
and Mindanao grids.

Medium Term
2025-2028
• Policy development on Smart
Grid and Green Plan
• Interconnections of BatangasMindoro; Quezon-Marinduque;
Catanduanes-Camarines Sur;
Palawan-Mindoro.

Long Term
2029-2050
•
•
•

Interconnect off-grid islands to
the main grid.
Encourage looping of Luzon
Grid and Visayas Sub-grids
Assessment of the Renewal of
the Concessionaire Agreement

1. Assess the performance of the transmission system operator
The DOE promulgated Department Order No. DO2023-06-001848, that will establish
a comprehensive and sustainable mechanism to confirm and validate the level of
compliance of the Transmission Network Provider and SO. It provided policies, rules,
and guidelines on how to conduct the assessment.
2. Enhance policy on the performance and operation of transmission system toward
self-healing grid system
The self-healing grid is a smarter network that employs sensor, control, and
communication technologies to enable real-time troubleshooting of unanticipated
situations. With the said premises, the DOE issued the national policy framework for
the smart grid and roadmap for distribution utilities through Department Circular
No. DC2020-02-000349. Under this Circular, the DOE adopted several criteria for
transitioning the entire generation, transmission and distribution power system into
a smart grid by 2040.
3. Review and develop policy on the reliability requirements of the grid, including
system protection

48 Entitled, “Creating the Performance Assessment and Audit Team for the Operations of the Transmission Network

Provider and System Operator (PAAT-TNPSO) and Providing for Its Responsibilities”
49 Entitled, "Providing a National Smart Grid Policy Framework for the Philippine Electric Power Industry and Roadmap
for Distribution Utilities"

POWER DEVELOPMENT PLAN 2023-2050

107

=== pdp-2023-2050-ch3-page-108.pdf ===
This pertains to projects that will ensure the reliability and protection of the Grid as
prescribed in the Philippine Grid Code (PGC). In support of these projects, the DOE
is continuously assessing ways and possible policy issuances in resolving the
pending cases and permit applications involving these transmission projects, as
these are critical in ensuring power reliability and protection.
4. Enhance the Transmission Development Planning (TDP)
In compliance with the EPIRA and its IRR, public consultations with electric power
industry participants, namely generation companies, DUs, and end-users, were
conducted to create and implement an enhanced and responsive 2022-2040 TDP.
Though, TransCo was not involved in the TDP formulation, review, and evaluation
as the grid owner in accordance with DOE Department Order No. DO2017-04000450, TransCo commented that generally the projects in the TDP will aid the
development of the grid and will help address the requirements for
interconnections, generation entry, load growth, system reliability, operation and
maintenance, and system operation.
5. Establish a coordination system to ensure the timely completion of transmission
projects
Utilizing new transmission lines, increasing substation capacity, and upgrading
transmission facilities are critical to effectively transfer electricity from new and
existing plants to end customers. To ensure that transmission projects are
completed on schedule, the DOE will continue to monitor the NGCP's monthly
submission of the Transmission Projects Status Report. To reduce delays, the DOE
continues to provide support to the NGCP through its endorsement to intervene
and cooperate with other government agencies, as needed, to address concerns
with right-of-way and permits, which create delays in transmission project
completion.
6. Develop supplementary policies for Ancillary Services
On 4 October 2021, the DOE issued the Department Circular No. DC2021-10-0031,
the AS Competitive Selection Process (AS-CSP) Policy, which mandates the NGCP
to procure the required AS level through CSP. This policy was promulgated by the
DOE to ensure transparency, competitiveness, and wide dissemination of bid
opportunities to ensure the participation of all eligible generation companies to
meet required levels of AS through Ancillary Services Procurement Agreements
(ASPA). For an update, out of the thirty-eight (38) bidders issued with Notice of
Award as a result of the 1st AS-CSP, only the Ancillary Services Procurement
Agreements (ASPA) for the thirty-six (36) bidders were executed and filed due to
non-acceptance of the award of two winning bidder.

50

Entitled “Designating TransCo as Grid Owner to Participate in the Preparation, Review, and Evaluation of the
Transmission Development Plan (TDP)”

POWER DEVELOPMENT PLAN 2023-2050

108

=== pdp-2023-2050-ch3-page-109.pdf ===
7. Interconnect the Luzon, Visayas, and Mindanao grids
Having an interconnected grid system is one of the visions for the Philippines’
electric power industry. Currently, Luzon and Visayas are already interconnected,
while the integration of Mindanao is ongoing through the Mindanao-Visayas
Interconnection Project, which is targeted to be completed by January 2024. To
enable greater power supply import and export between the Luzon and Visayas
grid, the Luzon–Visayas High Voltage Direct Current Bipolar Operation project is also
proposed. Through an interconnected power network, the country can optimize its
indigenous energy resources, such as natural gas in Luzon, geothermal in Visayas,
and hydro in Mindanao.
8. Policy development on Smart Green and Grid Plan (SGGP)
The DOE is currently formulating the Smart and Green Grid Plan (SGGP) that aims
to address major challenges confronting the electric power industry, like grid
congestions, as it aspires to move its power system to be smart and capable of
incorporating an increasing amount of variable renewable energy in the
generating mix. The SGGP's goal is to provide a set of projects for grid upgrades, as
well as high-priority modernization projects that will ensure that the energy
transmission plan of the DOE will be achieved.
9. Interconnections of Batangas-Mindoro; Quezon-Marinduque; CatanduanesCamarines Sur; Palawan-Mindoro
For the Batangas-Mindoro interconnection project, the linking of the Mindoro with
the main Luzon Grid was envisioned to provide the island access to bulk generation
sources in the main grid while at the same time providing the means to export
possible excess power once the generation potentials, including RE-based plants,
within the island have been developed.
With the envisioned interconnection of Mindoro Island to the Luzon Grid, the
province of Palawan will be the next big island to be interconnected in terms of
land area and energy demand. By connecting the existing Palawan grid to the
Luzon grid via Mindoro Island, the province's present energy mix, which is primarily
oil-based, is expected to depart from traditional sources in the coming years. This is
owing to the anticipated introduction of renewable energy power plants, for which
Palawan has a strong potential.
On the other hand, the proposed Quezon-Marinduque Interconnection Project
involves interconnecting the island of Marinduque to the Luzon Grid through a
submarine cable from General Luna, Quezon to Sta. Cruz, Marinduque. It aims to
address the expected long-term development in the island province of
Marinduque.
Lastly, the Camarines Sur–Catanduanes Interconnection Project aims to link the
Catanduanes Island to the Luzon Grid and provide Catanduanes access to more
reliable and competitive generation sources.

POWER DEVELOPMENT PLAN 2023-2050

109

=== pdp-2023-2050-ch3-page-110.pdf ===
10. Interconnect off-grid islands to the main grid
A significant number of islands and far-flung areas in the country remain isolated
from the main grid. These are classified as off-grid areas, which are the majority
being operated and managed by the NPC-SPUG. In line to build one Philippine grid
system, the DOE promulgated Department Circular No. DC2019-01-00151. This policy
includes the assessment of economic feasibility and timeline for the eventual
interconnection of off-grid areas into the main grid. It also requires the NGCP to
prepare a report or an annual program for the interconnection of off-grid areas
into the main grid to be integrated into the TDP.
11. Encourage looping of Luzon Grid and Visayas Sub-grids
The DOE envisioned the power system to have an extension and looping
configuration in the three main island Grid of the country, providing an alternate
transmission corridor to far-flung and radially connected areas for much more
reliable power supply.
12. Assessment of the Renewal of the Concessionaire Agreement
Part of the objective of the DO2023-06-0018 is to have the other state-run firms like
TransCo to have their respective participation in the audit undertaking which shall
be centered on the performance of the transmission network provider and system
operator in keeping with the provisions of its 25-year concession agreement with
the government when it comes to the operation of the country’s transmission
facilities.

Goal 1: Energy Security, Resiliency, Affordability and Sustainability

3. Distribution
Short Term
2023-2024
•
•
•

•

•

Enhance digitalization of
Distribution Development Plans
Ensure timely completion of
Distribution Development Plans
Enhance the existing
Competitive Selection Process
Policy
Conduct policy review on the
regulation and performance of
Distribution Utilities
Review and develop climateproof standards for distribution
utility infrastructure.

Medium Term
2025-2028
•
•

Develop policy to incentivize
distributed energy resources and
prosumer
Supplement existing policy
toward smart grid systems and
interoperability

Long Term
2029-2050
•

•
•

Transition to Smart Grid to
improve the reliability of
distribution facilities
Increase utilization of RE
resources for power generation
Encourage consumers to utilize
RE for non-power productive
application

51 Entitled, “Prescribing the Omnibus Guidelines on Enhancing Off-Grid Power Development and Operation”

POWER DEVELOPMENT PLAN 2023-2050

110

=== pdp-2023-2050-ch3-page-111.pdf ===
1. Enhance digitalization of Distribution Development Plans
The DDP must be responsive to the developments in the electric power industry,
thus the need to digitalize and optimize the current DDP Forms through the
implementation of digital tools and platforms for efficient management and
monitoring. This includes the updating of the existing DDP Forms and the creation
of a database information system. The current DDP Forms shall be updated to
integrate the new policies, laws, rules, and regulations into a single, uniform,
detailed, and comprehensive DDP format. Likewise, a DOE DDP Information System
shall be developed to serve as a database system of the contents of the DDP. This
will be used internally by the DOE for easy processing of the information contained
in the DDP, and externally by providing easy access to stakeholders of the DDP
information to be accessible via the DOE website.
2. Ensure timely completion of Distribution Development Plans
Pursuant to Rule 7, Section 4(p) of the EPIRA-IRR and Department Circular No.
DC2004-02-00252, the DUs shall prepare and submit to the DOE an annual DDP not
later than the 15th of March every year. In the case of ECs, it shall be submitted
through the NEA for review and consolidation. Thereafter, the NEA shall submit to
the DOE the National Electric Cooperatives Distribution Development Plan
(NECDDP) not later than the 15th of March every year.
To assist the DUs in the preparation of a comprehensive DDP and ensure that the
submissions are in accordance with the timelines set forth under the EPIRA, the DUs
shall submit their initial DDP every 25th of January of each year for the DOE and
NEA’s review pursuant to Section 5.2 of DC2021-03-000353. By March 15, the DUs
shall submit their final DDP reflecting the changes based on the comments and
recommendations of the DOE and NEA.
With the implementation of the said timelines, the DUs are expected to prepare
and submit a comprehensive DDP on or before March 15. The NEA shall also be
able to consolidate the NECDDP prior to its endorsement to the DOE by March 15.
To further strengthen the timely submission of DDP, the DUs are mandated to upload
their latest and duly accepted Power Supply Procurement Plan in the DOE CSP Ebased Portal on or before June 30 as provided under Section 4.2 of DC2023-060021.
Considering that the plan is crucial in achieving a reliable power supply, the DOE
and NEA require the timely preparation and submission of DDP by the DUs. The DOE
is also working to further streamline the planning procedures and processes to
ensure that the DUs will be able to comply with the timeline in the execution of CSP
and project implementation. As part of streamlining the planning procedures and
52 Entitled, “Prescribing the Guidelines for The Formulation of a Five-Year Distribution Development Plan Pursuant to

Section 2 Of Department of Energy Circular No. 2003-12-011, Entitled “Enjoining All Distribution Utilities to Supply
Adequate, Affordable, Quality and Reliable Electricity”
53 Entitled, “Prescribing the Policy and Guidelines for the Formulation of the Distribution Utilities Distribution Development
Plan Integrating the Relevant Laws, Policy Issuances, Rules and Regulations”

POWER DEVELOPMENT PLAN 2023-2050

111

=== pdp-2023-2050-ch3-page-112.pdf ===
processes, DOE has to include discussions with ERC in fast-tracking CAPEX approval
from the submitted DDPs for the immediate implementation of plans and programs
of the DU.
3. Enhance the existing Competitive Selection Process Policy
On 30 June 2023, the DOE issued Department Circular No. DC2023-06-0021, which
was published in The Daily Tribune and Business World on 04 July 2023, and took
effect on 18 July 2023. The said DC amended the previous policies on the CSP
which aimed to streamline the conduct of CSP and the responsibilities of the DOE,
ERC, and NEA under the EPIRA that is adaptable and flexible to the needs of the
DUs to ensure efficient, timely, and transparent procurement of power supply to the
captive market. The issuance of this policy will also pave the way for the
enhancement of the existing CSP E-based Portal.
4. Conduct policy review on the regulation and performance of Distribution Utilities
This is a continuous assessment of the DOE to harmonize the policy and regulatory
framework applied to and adopted by DUs. The objectives of this activity are as
follows:
a) Evaluate the quality of service provided by DUs in their respective franchise
areas based on set performance standards.
b) Review existing laws, Department Circulars, ERC Resolutions, and other
issuances related to DUs’ regulatory framework and rate-making
methodology.
c) Seek key energy agencies’ evaluation of the current regulations applied to
private DUs and ECs.
d) Recommend solutions to improve the quality of service provided to all
electricity consumers, where both private DUs and ECs conform to the
same operational performance standards.
5. Review and develop climate-proof standards for Distribution Utility infrastructures
The DUs shall ensure a resilient energy infrastructure through the adoption of energy
resiliency in their plans and programs to mitigate the potential adverse effects of
disasters on the distribution system in accordance with Department Circular No.
DC2018-01-000154. To further support the implementation of the policy, it aims to
strengthen the distribution system and improve the resilience against naturally
induced hazards through the following:
a) Review of the existing distribution construction standards generally
adapted by the DUs;
b) Evaluation of the performance of the distribution system built using the
present standards during the occurrences of naturally induced hazards;
and

54 Entitled, “Adoption of Energy Resiliency in the Planning and Programming of the Energy Sector to Mitigate

Potential Impacts of Disasters”

POWER DEVELOPMENT PLAN 2023-2050

112

=== pdp-2023-2050-ch3-page-113.pdf ===
c) Upgrade the present standards to improve the DU’s performance during
the occurrence of natural hazards or force majeure events.
6. Develop policy to incentivize distributed energy resources and prosumer
On 19 October 2022, the ERC issued Resolution No. 11, Series of 202255 which aims
to encourage the development and utilization of DERs with the following
objectives:
a) Provide the guidelines, requirements, and standards for the
interconnection of DER to address engineering, power quality and
reliability, and safety concerns;
b) Provide for applicable requirements in securing a COC consistent with
existing ERC issuances and any amendment/s thereto;
c) Establish pricing methodologies for DER; and
d) Promote efficient and cost-effective energy planning and monitoring using
the data gathered.
The DOE plans to develop a policy to encourage the development of DER and
incentivize the prosumers (e.g., tax credits), like the privileges and benefits of other
RE technologies.
7. Supplement existing policy toward smart grid systems and interoperability
The National Smart Grid Policy Framework and Roadmap for DUs was established
in 2020 through DC2020-02-0003. Due to challenges in the acquisition and
implementation of smart grid facilities, the majority of the DUs are still at Level 0
and/or 1 based on their Smart Distribution Utility Roadmap (SDUR).
The DOE shall review the status of the implementation of the smart grid policy and
the SDUR of the DUs to identify the challenges and necessary government
assistance to fully implement the policy. A supplemental policy may be issued to
improve and support the full implementation of the smart grid program.
8. Transition to Smart Grid to improve the reliability of distribution facilities
In the long term, the DOE envisioned the full transition to a smart grid and aim to
have a reliable, flexible, resilient, and secure automated distribution system
integrated with decentralized energy sources. The modernized distribution system
is expected to promote consumer empowerment and to influence consumer
behavior towards efficient utilization of energy.
9. Increase utilization of RE resources for power generation
In support of the objective of having clean energy, the DUs are encouraged to
contract their power supply requirements to RE power suppliers. Likewise, the DUs
are also encouraged to develop RE greenfield power projects to provide
additional generation capacity. This is in addition to the DUs compliance with the
RPS requirements and other RE-related policy issuances.

55 Entitled, “A Resolution Adopting the Rules Governing Distributed Energy Resources (DER)”

POWER DEVELOPMENT PLAN 2023-2050

113

=== pdp-2023-2050-ch3-page-114.pdf ===
10. Encourage consumers to utilize RE for non-power productive application
The consumers are encouraged to utilize the non-power applications of RE
technologies such as drying, heating, and cooling which will have a beneficial
contribution in boosting the economy. To further encourage the consumers, the
DOE is looking into developing policy issuances and support mechanisms to
provide incentives to consumers utilizing RE for non-power productive applications.

Goal 2: Transparent and Fair Playing Field in the Power Industry

4. Supply
Short Term
2023-2024
•
•
•

•

Implement RCOA in Mindanao
Implement Retail Aggregation in
Luzon, Visayas, and Mindanao
Comprehensive Review of the
Retail Rules (switching and
disconnection)
Amendments to WESM and
Retail Rules and Manuals
regarding Implementation of the
Electric Retail Aggregation
Program

Medium Term
2025-2028
•
•
•

Adopt lower thresholds for RCOA
in Luzon, Visayas, and Mindanao
Continuing review of retail rules
and manuals
Develop policy for enhanced
and digitized customer switching
procedure

Long Term
2029-2050
•

•
•

Further lowering of the RCOA
threshold up to the household
level
Continuing review of retail rules
and manuals
Implement digitized customer
switching procedure

1. Implement RCOA in Mindanao
Upon implementation of the commercial operation of WESM in Mindanao, the DOE
initiated to review the policies for the RCOA, Retail Aggregation, and GEOP in the
region. A TWG was formed together with the ERC, Independent Electricity Market
Operator of the Philippines (IEMOP), and Philippine Electricity Market Corporation
(PEMC) to conduct a thorough review and harmonization of the relevant rules and
policies, along with the conduct of public consultations and forums on the
proposed department circular for the commencement of RCOA and GEOP in
Mindanao. These activities will be done to gather valuable insights specific to
Mindanao, which has peculiar industry characteristics different from Luzon and
Visayas, where the existing RCOA policies are based and derived. Pursuant to ERC
Resolution No. 12 Series of 202056, separate rules and procedures will be developed
and implemented by the ERC for the RCOA in Mindanao. Further, all entities and
persons who intend to supply electricity in the retail market shall secure a license or
authorization from the ERC. The target declaration of the commercial operation of
RCOA, and GEOP in Mindanao will be on 26 December 2023.

56 Entitled, “A Resolution Prescribing the Timeline for the Implementation of Retail Competition and Open Access”

POWER DEVELOPMENT PLAN 2023-2050

114

=== pdp-2023-2050-ch3-page-115.pdf ===
2. Implement Retail Aggregation in Luzon, Visayas, and Mindanao
The Rules for the Electric Retail Aggregation Program took effect on June 24, 2022,
during the ERC’s Pilot Implementation of Retail Aggregation in UP Diliman Campus
through the signing of the Memorandum of Understanding between the University
of the Philippines and Meralco.
As mandated by the EPIRA, the ERC shall establish a competitive framework in the
electricity markets through the issuance of rules and regulations necessary to
govern the Competitive Retail Electricity Market (CREM). Among the ERC’s role is
to promulgate rules and regulations that shall ensure a level playing field for all
market participants, the prevention of anti-competitive behavior, as well as the
registration and qualifications of the suppliers and customers in the electricity
markets, therefore the Retail Aggregation Program was piloted by the ERC. Upon
implementation of the RCOA and GEOP in Mindanao, Retail Aggregation will
likewise be implemented.
3. Comprehensive Review of the Retail Rules (switching and disconnection)
To address the challenges of switching to a Retail Electricity Supplier (RES) raised by
Contestable Customers, the ERC has issued Resolution No. 01, Series of 202357
amending Section I, Article II of the ERC Rules supplementing the switching and
billing process and adopting a disconnection policy for the contestable customers.
This Resolution provides the following:
a) Not allowing Eligible End-users to switch to a RES, shall it have an
outstanding balance with its Network Service Provider, in case of an initial
switch.
b) Allowing a Contestable Customer, already being serviced by a RES to
switch or to be supplied by a new RES or Supplier of Last Resort (SOLR)
notwithstanding the existence of an outstanding balance.
4. Amendments to WESM and Retail Rules and Manuals regarding Implementation of
the Electric Retail Aggregation Program
The WESM and Retail Rules and Manuals shall be harmonized with all the policy
issuances of the DOE and the ERC relating to the implementation of the Electricity
Retail Aggregation Program. Hence, the concerned stakeholder may propose
amendments to the WESM and Retail Rules and Manuals to the Rules Change
Committee (RCC) for review and approval of the PEM Board. The proposals will
then be endorsed to the DOE for review and final approval.
5. Adopt lower thresholds for RCOA in Luzon, Visayas, and Mindanao
Complementing the study currently being undertaken by PEMC and ERC, the DOE
will examine the impacts of lowering the threshold of the RCOA, which is envisioned
to reach the household level. The proposed DOE study shall:
57 Entitled, “Amendment to the ERC Rules Supplementing the Switching and Billing Process and Adopting a

Disconnection Policy for the Contestable Customers”

POWER DEVELOPMENT PLAN 2023-2050

115

=== pdp-2023-2050-ch3-page-116.pdf ===
a) Assess the readiness of the retail market and suppliers for greater RCOA
participation;
b) Evaluate and harmonize existing local guidelines and resolutions in support
of RCOA;
c) Analyze the economic and technical impact of lowering the RCOA
threshold on RES and local RES operated by private entities and DUs; and
d) Compare the current and future RCOA policy and regulatory frameworks
with other jurisdictions having similar market designs.
6. Continuing review of retail rules and manuals
The WESM and Retail Rules and Manuals shall be harmonized and updated
regularly to be up to date with all the policy issuances of the DOE and the ERC.
Hence, the concerned stakeholder may propose amendments to the WESM and
Retail Rules and Manuals to the Rules Change Committee (RCC) for review and
approval of the PEM Board. The proposals will then be endorsed to the DOE for
review and final approval.
7. Develop policy for enhanced and digitized customer switching procedure
The IEMOP as the Central Registration Body shall develop the enhanced process
and digitalized procedures for the effective and efficient implementation of
switching of Contestable Customers.
8. Implement digitized customer switching procedure
The IEMOP as the Central Registration Body shall develop the enhanced process
and digitalized procedures for the effective and efficient implementation of
switching of Contestable Customers.

POWER DEVELOPMENT PLAN 2023-2050

116

=== pdp-2023-2050-ch3-page-117.pdf ===
Goal 2: Transparent and Fair Playing Field in the Power Industry

5. Electricity Market
Short Term
2023-2024
•
•
•

Full commercial operation of
the WESM in Mindanao
Commercial operation of the
Initial Reserve Market (Phase 1)
Policy support to Renewable
Portfolio Standard compliance
Study Electricity Derivatives
Market (Contracts for
Differences)

Medium Term
2025-2028
•
•

•
•

Implement the Enhanced
Reserve Market (Phase 2)
Implement Electricity Derivatives
Market (Contracts for
Differences)
Continuous improvement of
Market design and rules
Study market design to allow
higher RE penetration and EV
Demand Response

Long Term
2029-2050
•

•

Continuous improvement and
enhancement of the design
and rules of the electricity
market
Enhance market design to
facilitate integration of RE and
EVs in the electricity market

1. Full commercial operation of the WESM in Mindanao
On 23 December 2022, the DOE promulgated Department Circular No. DC2022-12003958 providing for the commercial operations date of the WESM in Mindanao
starting 26 January 2023.
To support the Trading Participants (TP) in their transition to the WESM operation, the
said Circular provides that all the TPs with pending requirements are deemed
registered in the Market, provided that full compliance shall be observed not later
than 25 April 2023. In addition, compliance to Prudential Requirements (PR), Realtime Monitoring Requirements (RTM), and Dispatch Conformance Standards (DCS)
were also given relaxation for three (3) months.
However, based on the report submitted by the Market Operator (MO) to the DOE,
as of 20 April 2023, some TPs are still yet to complete their WESM Registration. Thus,
on 26 April 2023, the DOE issued an Advisory Extending the Relaxation of Submission
of Registration Requirements in the WESM until 25 June 2023.
Meanwhile, another Advisory was issued on 11 May 2023 for the declaration of the
implementation of a Single Settlement for the Luzon, Visayas, and Mindanao
Regions in the Wholesale Electricity Spot Market (WESM) starting on the May 2023
billing period, due to the energization and actual energy flow in the MindanaoVisayas Interconnection. The integration of the Mindanao grid in the WESM is a
significant leap toward achieving the country’s goal of having “one grid, one
market” despite being 17 years overdue. DOE initially launched the WESM in Luzon
in 2006 and in Visayas in 2010.

58 Entitled, “Declaring the Commercial Operation of the Wholesale Electricity Spot Market (WESM) in the Mindanao

Grid”

POWER DEVELOPMENT PLAN 2023-2050

117

=== pdp-2023-2050-ch3-page-118.pdf ===
2. Commercial operation of the Initial Reserve Market (Phase 1)
One of the key features of the WESM is the co-optimization of energy and reserves
through the Reserve Market. In the Reserve Market, both energy and reserve offers
are incorporated in the Market Dispatch Optimization Model of the WESM’s Market
Management System to determine optimal schedules and prices to simultaneously
satisfy the energy and reserve requirements of the grid at any given interval while
considering constraints such as cost and transmission limits, among others.
As earlier mentioned, the DOE promulgated Department Circular No. DC2021-03000959 which defined the general framework for the operation of the Reserve
Market. Its salient features are as follows:
a) Co-optimization of energy and reserves, protocols for the submission of
offers, and determination and implementation of dispatch schedules;
b) Operational cap, locational reserve sharing, and scarcity hierarchy for
reserves;
c) Tradeable AS categories and their minimum technical specifications and
required levels;
d) Criteria for the readiness of market systems and corresponding
responsibilities of the power industry participants, and
e) Appropriate pricing, billing, settlement procedures, mitigating measures,
and cost recovery mechanisms to ensure consumer protection.
The Circular, likewise, provided the supplemental policies relative to AS, particularly
on the accreditation of third-party AS testing entities and the conduct of CSP for
the procurement of AS contracts of the SO. The Reserve Market is targeted to be
implemented following the enhancements to WESM Design and operations and is
subject to the readiness assessment of the WESM’s Governance Arm and the DOE.
Through a DOE Advisory issued on 26 June 2023, the Reserve Market Trial Operation
Program (TOP) was commenced by the IEMOP. The successful conduct of the
Reserve Market TOP is one of the prerequisites for the commercial operations of the
Reserve Market, which is targeted to be launched by the end of 2023. The DOE will
likewise promulgate a Department Circular declaring the commercial operations
of the Reserve Market once all the market participants, interfaces, and systems are
ready for full operations.
3. Policy support to Renewable Portfolio Standard compliance
The RE Market involving the trading of Renewable Energy Certificates (RECs) will
support the compliance of electric power industry participants to the Renewable
Portfolio Standards (RPS). The regular updating of the RE Market Rules and Market
Manuals will be continuously sought to cater to the diverse needs and growth of
the RE Market and ensure that the market will remain relevant and responsive to
the needs of the sector.

59 Entitled, “Adopting A General Framework Governing the Operationalization of the Reserve Market in the

Wholesale Electricity Spot Market and Providing further Policies to Supplement DC2019-12-0018”

POWER DEVELOPMENT PLAN 2023-2050

118

=== pdp-2023-2050-ch3-page-119.pdf ===
4. Study Electricity Derivatives Market (Contracts for Differences)
The IEMOP, as coordinated with the DOE, has an ongoing study regarding the
Electricity Derivatives Market, particularly Contracts for Difference, which can be
incorporated and integrated into the Philippine WESM. The Electricity Derivatives
Market can provide different benefits to the power sector such as price hedging
from volatile WESM prices, minimized pricing risks, increased private sector
competition and participation, and incentivized delivery of the least-cost
electricity. The proposed Electricity Derivatives Market will involve IEMOP as the
Electricity Derivatives Market Operator subject to compliance with the Securities
and Exchange Commission’s Securities and Regulation Code and its implementing
rules and regulations. The implementation of the Electricity Derivatives Market will
provide another venue for the market participants in sourcing their supply
requirements.
5. Implement the Enhanced Reserve Market (Phase 2)
After Phase 1 of the Reserve Market, Phase 2 shall be implemented incorporating
the classification of reserves in the Philippine Grid Code 2016 and the
corresponding technical specifications and testing guidelines. Phase 2 shall
integrate all the enhancements of the Reserve Market and the amendments to the
WESM Rules and Market Manuals pertaining to its operations and compliance,
among others.
6. Implement Electricity Derivatives Market (Contracts for Differences)
Higher RE penetration in the electricity market shall require more Ancillary Services
in the power industry to balance the intermittent nature of variable RE. Market
design enhancements particularly on the different products that can be offered in
the Reserve Market and demand side participation will be very beneficial and
essential in addressing the challenges imposed by the growth of RE in the
Philippines. Studying the said enhancements will be grounded on existing policies
and laws related to improving the electricity markets to accommodate the
integration of higher RE penetration while ensuring the reliability, stability, and
security of the electric power supply.
7. Continuous improvement and enhancement of the design and rules of the
electricity market
Policy developments will be continuously pursued considering the latest updates
and innovations in the electric power industry particularly for electricity markets.
Amendments and enhancements of the design and rules of the electricity markets
shall be implemented with the end in view of ensuring the competitiveness,
efficiency, reliability, and transparency of the market while striving for the delivery
of the least-cost electricity to consumers. The integration of various market
mechanisms shall entail steady updating of rules and manuals to keep abreast with
the latest innovations in the power industry and meet the needs of the participants.

POWER DEVELOPMENT PLAN 2023-2050

119

=== pdp-2023-2050-ch3-page-120.pdf ===
Goal 3: Electricity Access for All

6. Off-Grid Development
Short Term
2023-2024
•

•

•

•

Monitor and assess the
implementation of the Omnibus
Policy, Small Grid SO Policy
Implement graduation and
rationalization of UC-ME subsidy
Policy
Review and develop policy on the
modernization of off-grid power
systems and operation
Increase utilization of RE resources
for power generation and
hybridization
Encourage consumers to utilize RE
for non-power productive
application

Medium Term
2025-2028
•

•
•

•

Interconnections of BatangasMindoro; Quezon-Marinduque;
Catanduanes-Camarines Sur;
Palawan-Mindoro
Study intraconnection of off-grid
islands
Enhance graduation and
rationalization of UC-ME Subsidy
system
Continuous modernization of offgrid power system and operation

Long Term
2029-2050
•

Implement viable
intraconnection of off-grid
island

1. Monitor and assess the implementation of the Omnibus Policy, Small Grid SO Policy
In accordance with the provisions set forth in the Department Circular No. DC201901-0001 (Omnibus Policy), the 2024-2028 Missionary Electrification Development
Plan (MEDP) shall be issued to provide major updates from the 2021-2025 MEDP and
to present new policies, strategies, and governance reforms for off-grid power
development and missionary electrification.
Further, the DOE shall evaluate the DC2019-01-0001 for a potential supplemental
policy relative to off-grid power development and monitoring to further enhance
data management and analytics and formulate proactive policies, plans, and
programs.
As mentioned in Chapter 1, the DOE issued the Department Circular No. DC202111-003960 or the Small Grid SO Policy to formulate grid interconnection
development plans and programs for the off-grid areas and prepare the
Distribution Utilities and Generation Companies for the assumption of TransCo as
Small Grid SO and the eventual interconnection of the small island grids into the
Grid.
Subsequently, the DOE shall monitor the implementation of the plans and programs
of the TransCo as the Small Grid SO of specific off-grid areas including its role in
capacitating the Distribution Utilities in formulating its island interconnection
development plan which shall form part of its Distribution Development Plan.

60 Entitled, “titled “Mandating the National Transmission Corporation (TransCo) as Small Grid System Operator (SO) in

Specific Off-grid Areas'' or Small Grid SO Policy

POWER DEVELOPMENT PLAN 2023-2050

120

=== pdp-2023-2050-ch3-page-121.pdf ===
2. Implement graduation and rationalization of UC-ME subsidy Policy
The rationalization of the Universal charge for missionary electrification (UC-ME)
subsidy aims to maximize cost recovery of the electricity service through a more
innovative tariff mechanism based on the capacity to pay by the end-users to be
supported by corresponding improvement in the electricity services.
The main strategy for the subsidy rationalization framework shall be the
development of the capacity of each DU with an off-grid area to formulate a
holistic and integrated UC-ME Subsidy Rationalization Plan that outlines the various
measures that will be employed by the DU and the local power stakeholders to
rationalize the utilization of UC-ME subsidy within its franchise area.
The UC-ME Subsidy Rationalization Plan shall form part of the DDP and the Power
Supply Procurement Plan (PSPP) to be submitted to the DOE in time with the annual
submission of DDP and PSPP. The major strategies to graduate from and rationalize
the UC-ME subsidy are as follows:
a) The interconnection of the off-grid islands into the grid, and in the case of
MGSPs, the interconnection of unserved and underserved areas into the
distribution lines of the DUs without adverse impact to the overall
distribution system. Upon interconnection, the provision of UCME ceases.
b) On the supply side in off-grid areas, the main strategy is the entry of
reasonable-cost RE and advanced generation technologies to replace or
hybridize with the existing diesel and bunker power systems. This can be
done through least-cost generation planning. For small applications, the
promotion of RE-based hybrid microgrids is important. Capacity building of
off-grid DUs in conducting CSP for their new requirements must also be
undertaken.
c) On the demand and consumer side, there is a need to rationalize the
current level of SAGR. UC-ME subsidy must prioritize low-income consumers
in off-grid areas. Overall UC-ME subsidy to consumers must also be reduced
which is commensurate to the current and foreseen economic progress in
these areas.
d) The energy efficiency programs and activities at the customer level shall
be implemented to mitigate the impacts of the current high cost of
generation in off-grid areas and the application of UC-ME subsidy
rationalization to the electricity consumers in off-grid areas.
3. Review and develop policy on the modernization of off-grid power systems and
operation.
The DOE shall develop a policy to supplement the provisions set forth in Rule 8 of
the Omnibus Policy for the promotion of reliability and efficiency for off-grid power
systems including modernization. The goal of this policy shall transform the existing
configuration of off-grid power systems into a system that can accommodate new
and emerging technologies towards enhancing quality, reliability, and resiliency.
Moreover, the policy shall encourage the distribution utilities to invest in new
technologies and devices that will improve the operation and management of the

POWER DEVELOPMENT PLAN 2023-2050

121

=== pdp-2023-2050-ch3-page-122.pdf ===
distribution systems in off-grid areas, such as SCADA, modern telemetry and
communication system, and other similar devices and equipment.
4. Increase utilization of RE resources for power generation and hybridization
To achieve greater utilization of renewable energy resources, the DOE has issued
the Department Circular No. DC2023-05-001461 to require Mandated Participants
to source or procure and subsequently maintain a certain percentage of their
generation from eligible RE resources, consistent with the optimal supply mix per
off-grid area.
5. Encourage consumers to utilize RE for non-power productive application
The DOE shall study and develop policy on the utilization of renewable energy (RE)
for non-power productive applications, particularly in off-grid areas. RE sources
offer a viable and sustainable alternative for non-power productive applications
such as heating, cooling, and transportation which often rely on fossil fuels. Further,
RE for non-power applications can achieve a level of energy independence for
consumers which benefits economically and increases resiliency.
6. Interconnections of Batangas-Mindoro;
Camarines Sur; Palawan-Mindoro

Quezon-Marinduque;

Catanduanes-

The DOE, in coordination with the TransCo and its concessionaire or successor-ininterest, shall monitor the implementation of various major interconnection projects
such as the Batangas-Mindoro Interconnection Project (BMIP), QuezonMarinduque Interconnection Project (QMIP), and Catanduanes-Camarines Sur
Interconnection Project (CCIP) which will provide access for the above-mentioned
large island grids to generation sources in the main grid.
7. Study intraconnection of off-grid islands
The archipelagic nature of the country presents a unique challenge in ensuring
reliable and sustainable energy access for off-grid islands. The DOE shall continue
to monitor the implementation of interconnection and intraconnection projects for
off-grids islands in coordination with TransCo. Further, TransCo shall continue to
conduct a comprehensive study to explore and implement intraconnection
solutions for off-grid islands to achieve energy connectivity for economic
development, social well-being, and environmental sustainability.
8. Enhance graduation and rationalization of UC-ME Subsidy system
The DOE shall continue to improve the implementation of the provisions set forth in
the UC-ME policy to ensure the sustainability and effectiveness of the subsidy
system. In addition, the DOE shall develop an enhancement of the UC-ME subsidy
system which aims to streamline the process and programs, promote efficiency,
and foster equitable access to electricity among the off-grid and missionary areas.
Further,
61 Entitled, ““Promulgating the Revised Rules and Guidelines Governing the Operationalization of the Renewable

Portfolio Standards for Off-Grid Areas Pursuant to Section 12 of the Renewable Energy Act of 2008”

POWER DEVELOPMENT PLAN 2023-2050

122

=== pdp-2023-2050-ch3-page-123.pdf ===
9. Continuous modernization of off-grid power system and operation
The evolving needs of communities and industries in the off-grid and missionary
areas shall involve the continuous modernization of off-grid power systems and
operation to ensure reliable, resilient, and sustainable energy access. This
modernization shall involve the alignment of technological advancements in
accordance with the standards and policies including the community needs and
environmental sustainability for lasting positive impact.
10. Implement viable intraconnection of off-grid island
The DOE shall review the existing policies and programs for the implementation of
viable intraconnection of off-grid islands. Intraconnection of off-grid islands will
enable such areas to ensure reliable and efficient energy access, fostering
economic development, and minimizing environmental impacts.

Goal 3: Electricity Access for All

7. Total Electrification
Short Term
2023-2024
•
•

•

•

Publish the National Total
Electrification Roadmap (NTER)
Conduct Pilot Microgrid System
Service Provider – Competitive
Selection Process (MGSP-CSP)
Issue supplemental policies on
the operationalization of
Microgrid Systems Act
Achieve household
electrification target rate for
2023 and 2024 based on
2020 Census
Develop an improved electricity
access statistics and monitoring
system

Medium Term
2025-2028
•

•

•

Achieve household
electrification target rate for
2025-2027 and 100% household
electrification target by 2028
Full implementation of RA 11646
(Implementation of NTER and
Conduct of MGSP-CSP)
Continuous improvement of
electricity statistics and
monitoring system

Long Term
2029-2050
•
•

Ensure electricity access to all
household in the country
Continuous Improvement and
Enhancements of Policies,
designs, and strategies to ensure
electricity access for all
households in the country

1. Publish the National Total Electrification Roadmap (NTER)
The NTER aims to meet the total electrification services at 100% by 2028, consistent
with the declared policy of the State to ensure and accelerate the total
electrification of the country as provided in Sec. 2(a) of the EPIRA of 2001. EPIRA
also mandates the DUs to provide universal service in their franchise areas including
unviable areas at a reasonable time.
Consistent with its mandates, the DOE serves as the oversight agency for policy,
planning, and implementation of this NTER. The NTER rationalizes all electrification
initiatives, interventions, and strategies toward sustainable energy development,

POWER DEVELOPMENT PLAN 2023-2050

123

=== pdp-2023-2050-ch3-page-124.pdf ===
improvement of the quality of life of every Filipino as well as reliable, and secure
electricity services at reasonable rates in unserved and underserved areas while
promoting private sector participation for electrification efforts, and prioritizing lowcost, indigenous, renewable, and environment-friendly sources of energy. The
different electrification programs and activities shall be implemented in
cooperation with NEA, NPC, all 149 DUs, the partner LGUs, and other Program
partners, among others.
The NTER covers the entire Philippines, including both grid and off-grid areas. The
roadmap targets all households in the country, particularly those in unserved and
underserved areas, which include remote communities, island communities,
indigenous communities, mountainous regions, and geographically isolated areas.
The roadmap will utilize a range of technologies and solutions to achieve universal
access to electricity, including microgrids, household electrification connections,
distribution line extensions, and solar home systems. The implementation of the
roadmap will involve the collaboration and coordination of different stakeholders,
including the DOE, NEA, NPC, DUs including, ECs, Private Investor-Owned Utilities
(PIOUs), LGUs, private sector companies, and the communities themselves. Each
stakeholder will have specific roles and responsibilities, such as providing technical
assistance, funding, and project management. The roadmap will also prioritize the
participation and empowerment of local communities and indigenous peoples in
the planning and implementation of electrification projects, in line with the
principles of social inclusion and participatory governance.
2. Conduct Initial Microgrid System Provider – Competitive Selection Process (MGSPCSP)
Pursuant to the provisions of RA No. 11646, the DOE will conduct a transparent CSP
such as but not limited to auction, unsolicited proposal, and Swiss Challenge to
determine a prospective MGSP. The awarded MSGP shall provide for an integrated
power generation and distribution to the areas declared as unserved and
underserved under the DOE’s NTER. The first batch of MSGP–CSP will happen by the
4th quarter of 2023. The invitation to bid to cover all unserved and underserved
areas in the Philippines will be in batches. The batches will serve as prioritization
based on the viability of the areas for microgrid systems, number of households to
be served and total demand as projected by the concerned DUs which will
undergo evaluation in coordination with the concerned DUs, NPC, and NEA.
3. Issue supplemental policies on the operationalization of Microgrid Systems Act and
Total Electrification Support Programs
a) Supplemental Policy on the LTER Development Guidelines
Pursuant to RA No. 11646, under Section 15, the DU shall integrate the LTER
in its DDP. Accordingly, the DOE shall issue a supplemental policy on the
LTER Development to guide the DUs in their LTER preparation harmonized
with their DDP. This will institutionalize the submission of the LTER and provide
further the roles of the DOE, NEA, NPC and the DUs for the implementation
of projects to attain total electrification. Further, this LTER will replace the
barangay and household electrification provision of the DDP.

POWER DEVELOPMENT PLAN 2023-2050

124

=== pdp-2023-2050-ch3-page-125.pdf ===
b) Supplemental Policy to DC2018-08-0021 (ER 1-94 Allocation and Digitized
Financial and Reportorial Compliance Monitoring)
On Chapter 1, the ER1-94 Funds were mentioned and utilized for COVID119 response projects pursuant to Department Circular No. DC2020-04-0008.
Now that the state of public health emergency has been lifted, the ER1-94
resumed its implementation to its intended purpose as such, the EF will be
utilized for electrification projects identified under Section 10.3 of DC 201808-0021. Accordingly, on the NTER Framework, the EF has been identified
as one of the funding sources for the achievement of total electrification.
To further efficiently and effectively utilize the EF, the DOE shall issue a
supplemental guideline to have an equitable allocation to the DU hosting
a power plant and serving the host communities and other DUs within the
host province and region.
c) Revised Policy for the implementation of the Total Electrification Project to
include other Instrumentalities
The DOE commenced the implementation of LFP-TEP in 2021, following the
issuance of the TEP Policy 1–Policy Guidelines on the Implementation of LFPTEP to support the government thrust of achieving the total electrification
of the country. The previously allocated LFP-TEP approved various projects
and implemented by NEA and NPC. To intensify the effective and timely
implementation of the LFP-TEP to support the DUs in achieving the
Government goal of 100% Household electrification by 2028, the DOE
encourages the active involvement of other qualified project
implementers including the Higher Educational Institutions (HEIs), Nongovernmental Organizations (NGOs), qualified Distribution Utilities. Thus, this
policy will be issued to prescribe the implementing guidelines to ensure
efficient, sustainable, and appropriate electrification strategies to address
the needs of remaining unserved and underserved households/areas.
4. Develop an improved electricity access statistics and monitoring system
To provide a clearer picture of the country’s electrification situation, the DOE is keen
on developing comprehensive electricity access statistics and monitoring systems.
As an initial step in this undertaking, the DOE recently launched a Microgrid System
and Photovoltaic Mainstreaming (PVM) dashboard which contains the microgrid
systems and PVM dashboard database, relevant statistics, and a comprehensive
listing of the existing microgrid and PVM installations.
a) Visual Mapping Platform - Philippine Space Agency
The DOE also aims to develop the platform that can assist in the validation
of target NTER unserved households and areas with the use of Satellite
Imagery and service offered by the Philippine Space Agency. In particular,
real-time images of profile of areas offered for MGSP CSP will assist in the
due diligence activity of the proponent, and for the case of the DOE will
also assist in monitoring developments in the communities served by MGSP
and by off-grid solutions implemented by the DOE and its attached
agencies and by the Dus themselves.

POWER DEVELOPMENT PLAN 2023-2050

125

=== pdp-2023-2050-ch3-page-126.pdf ===
b) Crowdsourcing Application for Household Electrification Targeting (Phases
1-2)
Further, the DOE aims to develop a Crowd-Sourcing Platform that enables
voluntary reporting of unenergized households, its location for the DOE to
address and program based on appropriate and available electrification
solutions. In this way, there will be another tool that can assist the DOE, NEA,
NPC and DU and other qualified third-party implementers of electrification
projects of identifying areas and households who do not have access to
electricity and implementing appropriate and sustainable solutions and
provide electricity access.
5. Achieve household electrification target for 2023-2028 and 100% household
electrification target by 2028
The DOE, through the TESC, aims to achieve 100% household electrification of the
country using the total number of households from the PSA-POPCEN 2015 as the
baseline. As earlier mentioned, the country’s electrification rate as of December
2022 stood at 96.17%, with the remaining 3.83% or 879,232 unserved households. To
electrify these areas, the TESC will implement the following:
a) Program-matching criteria and roll-out scheme to identify the appropriate
electrification strategies for each unelectrified and unserved area and
household;
b) Customized electrification solutions considering the viability and
geographical set-up of the area (contiguous, island, isolated, etc.); and
c) Specific policies and programs separate for household, grid, and off-grid
electrification.
Pursuant to RA11646, each DU must submit their respective LTER to include all
unserved and underserved households and areas indicating but not limited to the
appropriate electrification solution, required funding sources, and target of
implementation/completion year. In the medium- to long- term, the DOE’s thrust
for 100% household electrification based on the latest PSA-POPCEN data will
remain. The DOE shall continually improve its existing electrification strategies, utilize
advanced and emerging technologies, and adopt innovative solutions, among
others, to achieve this goal.
Further, once the updated NTER is finalized, the Department will be releasing the
revised projected household electrification targets based on the 2020 Census of
Population. Moreover, the adoption of a new computation for electricity access
rate will be discussed with the TESC to account all forms and initiatives for
electrification of unserved households. Anchored by the strategies stipulated under
the NTER, the energy sector’s goal is to meet its annual household electrification
targets in the short-term period.

POWER DEVELOPMENT PLAN 2023-2050

126

=== pdp-2023-2050-ch3-page-127.pdf ===
6. Full implementation of RA 11646 (Implementation of NTER and Conduct of MGSPCSP)
In the medium- to long-term, the DOE’s goal is to accelerate the total electrification
of the unserved and underserved areas of the country. The DOE with continuous
collaboration with NEA and NPC, will ensure the full and effective implementation
of RA 11646. As such, the DOE intends to conduct successful CSPs for prospective
MGSPs in a transparent and timely manner. Furthermore, the DOE will make way to
smoothen the processes that will ensure the private sector participation in off-grid
electrification through the enhancement of the processes and developing
competitive and suitable terms of reference to promote more competitive
selection among MGSPs.
7. Continuous improvement of electricity statistics and monitoring system
In addition to the launching and enhancement of the Microgrid and PVM
dashboard, a comprehensive database of electricity statistics and monitoring
systems is targeted to be developed in the medium-term. The database can be a
critical tool in identifying effective electrification strategies that can serve as the
basis for policy formulation.
8. Ensure electricity access to all households in the country
As the population steadily increases, so does the total number of households. Given
this reality, the Department will be firm in its total electrification agenda, and this
will be pursued and guided with the latest available information on the census as
a reference in implementing policies and programs.
9. Continuous Improvement and Enhancements of Policies, designs, and strategies to
ensure electricity access for all households in the country
To keep abreast with the ever-changing electrification landscape, the
improvement of policies and strategies is one of the critical deliverables of the DOE
in the long-term. This practice guarantees that the programs to be implemented
are pragmatic and aligned with current trends and developments thereby
facilitating expansion of access to reliable electricity services.

POWER DEVELOPMENT PLAN 2023-2050

127

=== pdp-2023-2050-ch3-page-128.pdf ===
8.

Overarching Policies and Program
Goal 1: Energy Security, Resiliency, Affordability and Sustainability

Goal 2: Transparent and Fair Playing Field in the Power Industry
Goal 3: Electricity Access for All
Short Term
2023-2024
•

•

Implementation of automated
submission of reportorial
requirements
Establish an integrated power
sector database

Medium to Long Term
2029-2050
•
•
•
•

Fast-track the approval process for power facilities and infrastructure
Implement the smart grid policy and roadmap
Continuous evaluation and implementation of necessary amendments in
the EPIRA
Continuous improvement of power development planning and
policymaking

1. Implementation of automated submission of reportorial requirements
On 14 March 2023, the DOE promulgated Department Circular No. DC2023-03000562 which provides the distribution utilities with guidelines in filling up the
templates for their reportorial requirements. On 12 April 2023, the DOE promulgated
Department Circular No. DC2023-04-000663 with the objective to provide RES and
Local RES with guidelines in filling up templates for their reportorial requirements. As
of 30 June 2023, 116 DUs and 18 RES have successfully uploaded their reports
covering the billing periods of January 2023 to May 2023.
On 05 July 2023, the DOE started the enhancement of the DOE’s Electric Power
Industry Database Management System (DEPDMS) to add new and improved
existing features that will make the end-user experience better. The enhancement
of the DEPDMS is not only limited to the comments and suggestions of the end-users
during the various rollouts but also covers features that will help the DOE to monitor
and generate reports, formulate policy, gather information, and interact with the
end-users faster and easier. Also, it will prepare the system for future reportorial
requirements of the DOE to easily create and configure on how to collect
information from stakeholders.
Through online submission of data, the DOE envisions providing an efficient way
of report submissions from the power industry participants at the same time
expecting an increase on the level of compliance from the stakeholders and
reducing costs in the submission.

62 Entitled, “Providing Supplemental Policy for the Systematic Management of the DOE Reportorial Requirements for

the Electric Power Industry Participants – Distribution Utilities”
63 Entitled “Providing Supplemental Policy for the Systematic Management of the DOE Reportorial Requirements for
the Electric Power Industry Participants – Retail Electricity Suppliers”.

POWER DEVELOPMENT PLAN 2023-2050

128

=== pdp-2023-2050-ch3-page-129.pdf ===
2. Establish an integrated power sector database
As mandated under EPIRA, the DOE is required for the timely and complete
provision of information that can be achieved through a single unified database
or system that covers all the power industry sub-sectors. Undertaking this initiative
will involve all the concerned power sector stakeholders from generation up to
distribution.
To date, the DEPDMS warehouses market data and grid information. This is in
collaboration with both MO and SO. Similarly, DEPDMS also receives and processes
reportorial requirements from various electric power industry participants i.e.,
Generation Companies, DUs, RES, and QTP in a safe, secure, timely, and efficient
manner. The integrated database will enable the DOE to generate periodic reports
containing valuable insights and conclusive information that will support the
decisions of the national government for the power sector.
3. Fast-track the approval process for power facilities and infrastructure
The DOE will continue to encourage the entry and utilization of needed power
facilities and infrastructure by streamlining and fast-tracking approval and
permitting processes of government services through the EVOSS System. EVOSS64 is
an online system that allows for the coordinated submission and synchronous
processing of all required data and information, providing a single decision-making
portal for actions on applications for permits and certifications of a proponent for
new power generation, transmission, and distribution projects. As of December
2022, the EPIMB currently has seven active processes under the EVOSS for the
following applications:
a) Clearance to Undertake SIS Endorsement to NGCP
b) Certificate of Endorsement to ERC
c) Certificate of Endorsement to Board of Investments
d) Certificate of Endorsement to NCIP for Generation Projects
e) Certificate of Endorsement to NCIP for Transmission Projects
f) Certificate of Endorsement to PNP
g) Application of Clearance for Direct Connection to the Grid
Additional processes were also added to the EVOSS system, which were reviewed
and developed by the EPIMB and the Investment Promotion Office from 2021 and
were rolled out in the EVOSS portal on the first half of 2023:
a) Certificate of Endorsement Point-to-Point Limited Transmission Facilities
b) Letter of Endorsement to the Department of Agrarian Reform for Land Use
Conversion
c) SIS Exemption for Power Projects under 20 MW for Luzon and 5MW for
Visayas and Mindanao
d) Certificate of Endorsement to ERC for Microgrid Systems Provider

64

EVOSS https://www.evoss.ph/Home/DisplayFaq/6

POWER DEVELOPMENT PLAN 2023-2050

129

=== pdp-2023-2050-ch3-page-130.pdf ===
4. Implement the smart grid policy and roadmap
The National Smart Grid Policy Framework and Roadmap for DUs was established
in 2020 through Department Circular No. DC2020-02-000365 shall be fully
implemented during the entire planning horizon. Smart grid uses advanced
technologies modernizing and enhancing the efficiency of electrical grid
infrastructure, ensuring power supply security and flexibility, and promoting
consumer empowerment, among others. To realize this vision, a huge number of
investments in the whole power supply chain is needed, along with strong
regulatory support to implement smart grid projects.
Since the promulgation of the above-cited policy, the DOE has continuously issued
policies and programs that are supportive of the smart grid vision, such as the
following: (a) Green Energy Auction Program; (c) National Framework for Energy
Storage Systems; and (d) Competitive Selection Process among others. Shown in
the illustration below the current update of SDUR as of December 2022:
Table 54. SDUR Submission of DUs as of December 2022

Networks
% Share
Customer
Service

28
28%

Partially
Level 1
51
52%

45

% Share

45%

Level 0

16
16%

Partially
Level 2
1
1%

32

15

4

1

1

1

99

32%

15%

4%

1%

1%

1%

100%

Level 1

1
1%

Partially
Level 3
1
1%

Requires
Resubmission
1
1%

99
100%

Level 2

Total

5. Continuous evaluation and implementation of necessary amendments in the EPIRA
Pursuant to EPIRA law, the DOE continues to perform its mandated function for the
supervision, assessment, and monitoring of the EPIRA Implementation among others
in complying with submissions of reportorial requirements which not only provide
significant accomplishments and developments undertaken by the attached
agencies as mandated but also to recognize the continuing challenges in the
EPIRA implementation thus possible formulation of amendment in the Act may be
done. The DOE has consolidated and reviewed the proposals being received from
various industry stakeholders for the amendment of the EPIRA which seeks to widen
the sources of energy, encourage investors in the power industry, empower the
DOE, Energy Regulatory Commission, and other government-mandated agencies,
and entities in the power sector, modernize the distribution sector, streamline and
fast track processes on critical energy infrastructures that will ultimately increase the
supply of energy, render efficient and optimal utilization and allocation of power,
and lower electricity prices in the Philippines, among others.

65 Entitled, “Providing a National Smart Grid Policy Framework for the Philippine Electric Power Industry and Roadmap

for Distribution Utilities”

POWER DEVELOPMENT PLAN 2023-2050

130

=== pdp-2023-2050-ch3-page-131.pdf ===
6. Continuous improvement of power development planning and policymaking
The DOE is committed to the continual improvement of the assessment and
enhancement process of the country’s power development planning, which will
seamlessly integrate emerging technologies, existing policies and programs, and
adaptation to prevailing energy trends. By responding precisely to the dynamic
shifts in the global energy landscape and incorporating this into the modeling
simulation, the DOE works to provide the least-cost generation capacity expansion
planning for the country. Conversely, policymaking necessitates a dynamic and
responsive approach to keep in pace with the evolving energy trends. Periodic
assessment of existing policies, identifying gaps, and addressing inefficiencies,
among others, will be the future threading path of the DOE. These approaches may
include, but are not limited to, Generation Adequacy per grid by assessing the Lossof-Load Expectation (LOLE) or Loss-of-Probability (LOLP), considering assessment
including per-island power situation of Visayas grid, development of criteria for
retiring power generation facilities based on their performance and operation in
the power system, and updating the reliability indices for generating plant in the
guidelines prepared by ERC in the Resolution No. 10, series of 202066. These
improvements will be supported by the needed manpower, capacity building, and
resources to the Department in order to achieve these goals. These endeavors and
strategies are expected to transform the country’s power development planning
into a dynamic and adaptive process.

66 ERC Resolution No. 10, series 2020: A Resolution Adopting the Interim Reliability Performance Indices and

Equivalent Outage Days Per Year of Generating Units

POWER DEVELOPMENT PLAN 2023-2050

131

