<!-- source: pdftotext -->
=== pdp-2023-2050-ch1-page-012.pdf ===
CHAPTER 1.
POWER SECTOR
HIGHLIGHTS,
2021-2022

POWER DEVELOPMENT PLAN 2023-2050

12

=== pdp-2023-2050-ch1-page-013.pdf ===
CHAPTER I

Power Sector Highlights 2021-2022
This chapter demonstrates how the electric power industry demonstrated how it
recovered from the pandemic, showcasing its resilience and performance following
the easing of COVID-19 restrictions. The industry was assessed in terms of power
statistics, implemented policies and programs, and key developments during the
years 2021-2022. Despite the nation’s recovery from the pandemic, the power sector
faced additional challenges in the form of natural disasters, including earthquakes
and strong typhoons posing significant threats to the country's power system. Despite
these formidable challenges, the power sector exhibited responsiveness by
reconstructing the affected power infrastructures. Throughout these efforts, the power
industry remained steadfastly committed to its mission and purpose, ensuring the
provision of reliable, affordable, and sustainable energy for the nation.

1. Electricity Demand and Supply
1.1 Peak Demand and Electricity Consumption
17,138

PEAK DEMAND, MEGAWATT (MW)

In 2021, the Philippines' total noncoincidental peak demand1 reached 16,036
MW, which slightly fell below the 2021 peak
demand forecast by 1.8% (297 MW).
Meanwhile, in 2022, the total noncoincidental peak demand was recorded
at 16,596 MW, which is 3.2% (542 MW) lower
than the projected peak demand forecast
(Figure 1). The 2021 actual peak demand
has surpassed the pre-pandemic actual
peak demand (2019) of 15,581 MW and the
pandemic actual peak demand (2020) of
15,282 MW. The increase in peak demand
was attributed to the recovery of crucial
economic sectors, with increased mobility
and the resumption of partial to full
normalization of economic activities.

16,036

16,333

16,596

2021

2022

Actual Peak Demand

Demand Forecast

Figure 1. Actual Peak Demand and Demand
Forecast (Year 2021 and 2022)

Meanwhile, Figure 2 shows that electricity sales and consumption across the
residential, commercial, and industrial sectors returned to pre-pandemic levels. The
residential sector has exhibited moderate growth from 34,292 GWh in 2020 to 35,324
GWh in 2022 owing to the continued adoption of hybrid work arrangement by various
government agencies and private companies, including classes still being held both
virtually and on-site. In 2022, the commercial and industrial sectors consumed 24,294
GWh and 28,844 GWh of electricity respectively, in which the industrial sector
1 DOE Annual Power Statistics 2003-2022

Retrieved through: https://www.doe.gov.ph/energy-statistics/philippine-power-statistics

POWER DEVELOPMENT PLAN 2023-2050

13

=== pdp-2023-2050-ch1-page-014.pdf ===
surpassed the pre-pandemic observed levels in 2019. The resurgence in electricity
consumption across these sectors serves as a clear indicator of the country's
economic rebound, showcasing resilience and adaptability in the wake of the
challenges posed by the pandemic.
120000

In Gigawatt-hours (GWh)

110000
100000

9994

90000

8929
2897

80000
70000

10693

9968

9742

9490
2871

8729
3695

8771
2658

28844

28194

25566

27623

25476

20727

21119

24294

30552

34292

34981

35324

2019

2020

2021

2022

60000
50000
40000
30000
20000
10000

0

Electricity Consumption per Year
Residential

Commercial

Industrial

Others

Own-Use

System Loss

Figure 2. 2019 to 2022 Electricity Consumption, in GWh

The surge in COVID-19 cases in 2020 and 2021 led to a notable rise in the electric
consumption category under “Others” sector. This increase was primarily contributed
by the utilization of public and government infrastructures and establishment,
repurposed as quarantine and isolation facilities to mitigate and control the spread of
the epidemic in the country. As the nationwide efforts focused on vaccine distribution
gained momentum in 2022 and all the while achieving herd immunity, the use of these
facilities was lesser, resulting in a 41% decline or 2,871 GWh consumption level by 2022.
The overall use of power increased by about 5.1%, or 5,401 GWh, between 2021 and
2022. This surge in power consumption was notably driven by the resumption of normal
operations across various sectors. Specifically, residential, industrial, and commercial
sectors had an upward trend, showcasing sustained growth as shown in Figure 3.
Residential
35,324 GWh
0.1% increase

Commercial
24,294 GWh
15.0% increase

Industrial
28,844 GWh
4.4% increase

Own-Use
9,490 GWh
26.2% increase

System Losses
10,693 GWh
7.3% increase

Others
2,871 GWh
41.4% decrease

2022 Total Electricity Consumption
111,516 GWh (5.1% increase)
Figure 3. 2022 Electricity Consumption per Sector in GWh, and 2021-2022 Growth Rate

POWER DEVELOPMENT PLAN 2023-2050

14

=== pdp-2023-2050-ch1-page-015.pdf ===
1.2 Installed Capacity and Gross Generation
The country’s total grid installed capacity2 increased by 5.1% (1,376 MW) from 26,882
MW in 2021 to 28,258 MW in 2022. Figure 4 visually represents the distribution of these
capacities in 2022 according to fuel or power plant types. The increase in the grid
installed capacity can be attributed to the commercial operations of 759 MW coal,
279 MW natural gas, and 350 MW RE, most of which comes from biomass and solar
farms.

Natural Gas
13%

Oil Based
14%

Geothermal, 7%

Renewable
Energy
29%

Hydro, 13%

Biomass, 2%

Coal
44%

Solar, 5%
Wind, 2%

Figure 4. 2022 Installed Capacity and Percent Shares

Coal, 44.0%
12,428 MW

Biomass, 2.2%
611 MW

Oil-Based, 13.6%
3,834 MW

Geothermal, 6.9%
1,952 MW

Renewable
Energy, 29.2%
8,264 MW

Natural Gas,
13.2%
3,732 MW

Energy Storage
System (ESS)

Solar, 5.4%
1,530 MW

Hydro, 13.3%
3,745 MW

Wind, 1.5%
427 MW

156 MW

Figure 5. 2022 Installed Capacity, in MW Capacity

The Philippines’ gross power generation increased by 5.1%, from 106,115 GWh in 2021
to 111,516 GWh in 2022, surpassing the pre-pandemic power generation in 2019.
2 DOE List of Existing Power Plants as of December 2022

Retrieved through: https://www.doe.gov.ph/list-existing-power-plants

POWER DEVELOPMENT PLAN 2023-2050

15

=== pdp-2023-2050-ch1-page-016.pdf ===
Natural gas power generation declined by 2.2% in 2021 and further by 6.2% in 2022.
The decrease was due to the cessation of gas supply deliveries from the Malampaya
Gas Field leading to higher dispatch of newly commercially operating coal plants and
the preferential dispatch of renewable energies, replacing natural gas. Further, oilbased plants’ share in power generation expanded from 1.5% to 2.3% (55.8% increase)
to compensate for the needed power to meet the demand during peak periods.
In terms of share, coal-fired power plants continued to dominate the mix at 59.6%,
which is 1.1% higher than its share in 2021. This is followed by RE (22.1%), natural gas
(16.0%), and oil-based (2.3%) gross generation as depicted in Figure 6.
120,000

111,516 GWh

106,115 GWh

3.7%
9.0%

3.9%
8.7%

100,000

9.3%

Gross Generation, GWh

9.4%
80,000

16.0%

18.0%

2.3%

1.5%

60,000
40,000

59.6%

58.5%
20,000
2021

Coal
Hydro

Oil-Based
Biomass

2022

Year

Natural Gas
Solar

Geothermal
Wind

Figure 6. 2021 and 2022 Gross Power Generation per Technology, in GWh
Note:
1. In 2021, the gross generation share for Biomass was at 1.4%, Solar at 1.4%, and Wind at 1.2%.

2. In 2022, the gross generation share for Biomass was at 1.2%, Solar at 1.6%, and Wind at 0.9%.
The performance of the electric power industry
improved substantially in 2021 and 2022, underscoring a
robust and dynamic recovery of the national economy.
The DOE was instrumental in this resurgence, successfully
addressing the increasing electricity demand by
facilitating the commissioning of an additional 1,376
MW installed capacity in the country’s energy mix.
Crucially, this substantial increase was made possible
through collaborative efforts within the power sector,
showcasing the coordinated endeavors of industry
participants to fortify the nation's energy mix.

For more information about the 2021 and 2022 Power
Statistics, please scan the QR code. Alternate link:
https://www.doe.gov.ph/energy-statistics/philippinepower-statistics

POWER DEVELOPMENT PLAN 2023-2050

16

=== pdp-2023-2050-ch1-page-017.pdf ===
1.3 Issued Endorsement for Power Generation Plants and Projects under
the EVOSS System
Since the passage of the Republic Act (RA) No. 11234 or the “Energy Virtual One-Stop
Shop (EVOSS) Act” on 08 March 2019, the DOE has migrated its processing of
endorsements to the Energy Regulatory Commission (ERC), the National Grid
Corporation of the Philippines (NGCP), National Commission for Indigenous People
(NCIP) and other entities issuing permits and licenses for the operation of power
generation plants and projects to a more efficient online system called EVOSS. As
such, the DOE, processed applications and issued a total of 831 endorsements to
concerned entities from August 2020 to December 2022 with details as follows:
Table 1. DOE Issued Endorsement for Power Generation, 2020-2022

Year Covered

Number of Issued Endorsements
SIS

NCIP

ERC

BOI

DAR

2020 (Aug to Dec)

12

5

17

1

-

2021 (Jan to Dec)

101

9

280

5

-

2022 (Jan to Dec)

109

20

266

4

2

TOTAL

222

34

563

10

2

Source: DOE – Investments Promotion Office

1.4 Coal Moratorium Updates
The DOE issued an Advisory on the Moratorium of Endorsements for Greenfield CoalFired Power Projects in Line with Improving the Sustainability of the Philippines’ Electric
Power Industry3 on 22 December 2020. This aligns with the country’s efforts to
accelerate the entry of renewable energy sources in the energy mix, promote new
technologies, increase system flexibility, and adhere to higher environmental
standards. In the said advisory, the DOE will no longer process applications for
endorsements of new coal-fired power generation projects
However, the moratorium does not affect existing and operational coal-fired power
generation facilities as well as any new coal-fired power project considered as (a)
committed coal-fired power projects; (b) existing power plant complexes which
already have firm expansion plans and existing land site provisions; and (c) indicative
power projects with significant progress, such as signed and notarized land acquisition
of land or lease agreements and approved permits or resolutions from local
government units (city/municipality, province) and Regional Development Council
where the power plants are located.

3 Coal Moratorium Advisory

Retrieved through: https://www.doe.gov.ph/announcements/advisory-moratorium-endorsements-greenfield-coalfired-power-projects-line-improving

POWER DEVELOPMENT PLAN 2023-2050

17

=== pdp-2023-2050-ch1-page-018.pdf ===
Table 2 lists the plants that have been issued with the necessary permits or are actively
reporting to the DOE on the project’s construction progress during the two-year period
following the implementation of the coal moratorium. Moreover, there are still
approximately 11,000 megawatts of coal-fired power projects that has been issued
with the Clearance to Undertake System Impact Study by the DOE and may still signify
their intention to proceed with the construction of their project. The confirmation of
the project’s non-coverage to the Coal Moratorium Advisory will be updated by the
DOE in the next PDP updates.
Table 2. Coal Power Projects Prior to Issuance of the Coal Moratorium (Grid-Connected)

Project Name
Mariveles Coal-Fired Power Plant
Phase I - Unit 1
Mariveles Coal-Fired Power Plant
Phase I - Unit 2
Mariveles Coal-Fired Power Plant
Phase I - Unit 3
Mariveles Coal-Fired Power Plant
Phase I - Unit 4

MW
Capacity
150.000
150.000
150.000
150.000

Masinloc Power Plant - Unit 4

350.000

Masinloc Power Plant - Unit 5

350.000

Mariveles Coal-Fired Power Plant
Phase II - Unit 5
Mariveles Coal-Fired Power Plant
Phase II - Unit 6
Natural Gas-Fired Combined
Cycle Gas Turbine Power Plant
Project Phase 1 - Unit 1 (formerly
AOE Coal-Fired Power Plant Unit 1)
Natural Gas-Fired Combined
Cycle Gas Turbine Power Plant
Project Phase 1 - Unit 2 (formerly
AOE Coal-Fired Power Plant Unit 2)
Palm Concepcion Coal-Fired
Power Plant Unit II
Misamis Oriental 2 x 135 MW
Circulating Fluidized Bed Coal
Fired Thermal Power Plant
RPEI Coal-fired Power Plant
SRPGC Coal-Fired Power
Plant Project
SRPGC Coal-Fired Power
Plant Project
H & WB PCB Supercritical CoalFired Power Plant - Unit 1
H & WB PCB Supercritical CoalFired Power Plant - Unit 2
Therma Visayas, Inc. Coal - Fired
Power Plant Expansion Project
San Ramon Power, Inc. Coal-Fired
Power Station
2x500 MW KEPCO Pangasinan
Coal-Fired Power Plant
SMC Circulating Fluidized Bed
Coal-Fired Power Plant

300.000
300.000

Owner
Mariveles Power
Generation Corporation
Mariveles Power
Generation Corporation
Mariveles Power
Generation Corporation
Mariveles Power
Generation Corporation
Masinloc Power Partners
Co, Ltd.
Masinloc Power Partners
Co, Ltd.
Mariveles Power
Generation Corporation
Mariveles Power
Generation Corporation

600.000

Atimonan One
Energy Inc. / Meralco
Powergen Corp.

600.000

Atimonan One
Energy Inc. / Meralco
Powergen Corp.

135.000
270.000
600.000
350.000
350.000
350.000
350.000
150.000
120.000
1000.000
600.000

Palm Concepcion
Power Corp.
FDC Misamis Power
Corporation
(Formerly: FDC Utilities Inc.)
Redondo Peninsula
Energy, Inc.
St. Raphael Power
Generation Corporation
St. Raphael Power
Generation Corporation
H & WB Asia Pacific
(PTE LTD) Corporation
H & WB Asia Pacific
(PTE LTD) Corporation
Therma Visayas, Inc.
San Ramon Power, Inc.
(SRPI)
KEPCO Philippines
Corporation
SMC Global Power
Holdings Corp.

Power Project Status
Committed Project
Committed Project
Committed Project
Committed Project
Committed Project
Committed Project
Committed Project
Committed Project
Committed Project –
Changed Technology
(With application to
revert to coal)
Committed Project –
Changed Technology
(With application to
revert to coal)
Committed Project
Committed Project
Committed Project
but delisted
Indicative Project
Indicative Project
Indicative Project
Indicative Project
Indicative Project
Indicative Project
Indicative Project
Indicative Project

POWER DEVELOPMENT PLAN 2023-2050

18

=== pdp-2023-2050-ch1-page-019.pdf ===
MW
Capacity

Project Name
SMC Circulating Fluidized Bed
Coal-Fired Power Plant
SMC Loboc Malabuyoc Coal-Fired
Power Plant Project
SMC Global Negros Coal-Fired
Power Plant Project
SMC Global PowerCoal-Fired
Power Plant

600.000
300.000
300.000

Owner

Power Project Status

SMC Global Power
Holdings Corp.
SMC Global Power
Holdings Corp.
SMC Global Power
Holdings Corp.

Indicative Project
Indicative Project
Indicative Project

328.000

SMC Global Power

Indicative Project

Sarangani Energy Corporation
Coal-fired Power Plant Phase 3

105.000

Sarangani Energy
Corporation

With pending
application for noncoverage

Grand Total

9,008 MW

1.5 Grid Operating and Maintenance Program (GOMP) Implementation
On 06 February 2020, the DOE promulgated Department Circular No. DC2020-0200044 which aims to:
(a) Ensure energy security of the country at all times;
(b) Enhance transparency, fairness, and accountability in the operation of
generation and transmission system and distribution facilities in the country;
(c) Promote open competition among electric power industry participants;
(d) Attainment of the objectives of the Electric Power Industry Reform Act (EPIRA)
to ensure the quality, reliability, security, and affordability of the supply of
electric power in the country; and
(e) Foster reliable operation and efficient conduct of planned maintenance of
power plants.
Since its implementation in 2020, the National Grid Corporation of the Philippines
(NGCP) has been submitting for the DOE’s approval its proposed three-year schedule
for planned and maintenance outages of grid and system operations-monitored
power generation facilities, developed in consultation with the generating
companies. The submission also includes information on the maintenance schedule
for each power plant and its associated units, along with the overall weekly reserve
profile per year per grid, which are being submitted to the DOE every 3rd quarter of
the year. Additionally, it contains the NGCP’s three-year maintenance program of
transmission facilities, aligned with the planned outages of the power generation
facilities.
Table 3. GOMP Implementation, 2020 to 2022
Particulars

Date of Submission to DOE

GOMP 2021-2023

09 December 2020

4 Entitled, “Providing Guidelines of the Planned Outage Schedules of Power Plants and Transmission Facilities and the

Public Posting of the Grid Operating and Maintenance Program”

POWER DEVELOPMENT PLAN 2023-2050

19

=== pdp-2023-2050-ch1-page-020.pdf ===
Particulars

Date of Submission to DOE

GOMP 2022-2024

26 October 2021

GOMP 2023-2025

25 October 2022

1.6 Formulation of the Decommissioning and Mothballing Policy
Pursuant to Section 2.85 of the DOE Department Circular No. DC2010-03-0003, the DOE
aims to finalize and complete the Generating Plant or Unit Decommissioning and
Mothballing Policy by end of 2022. To gather feedback and recommendations, the
DOE has actively engaged in Focus Group Discussions (FGDs) with relevant
government agencies, offices, key energy stakeholders and industry players. The
Electric Power Industry Management Bureau has successfully completed a total of
eight (8) FGDs and three (3) public consultations (PubCon) during this period, as
shown in Table 4.
Table 4. Decommissioning and Mothballing Policy FGD and Public Consultation
FGD and PubCon Dates

13 July 2022

18 July 2022
11 August 2022
16 August 2022

05 September 2022

22 November 2022
24 November 2022
28 November 2022

Agencies Involved
Energy Regulatory Commission
Philippine Electricity Market Corporation
Independent Electricity Market Operator of the Philippines
National Grid Corporation of the Philippines
National Power Corporation
National Transmission Corporation
Philippine Independent Power Producers Association
Power Sector Assets and Liabilities Management
Department of Environment and Natural Resources
Board of Investments
RE Associations
a) PHILHYDRO Association, Inc.
b) National Geothermal Association of the Philippines
c) Wind Energy Developers Association of the Philippines
d) Biomass Renewable Energy Alliance
e) Philippine Solar and Storage Energy Alliance
f) Confederation of Solar Power Developers of the Philippines
Visayas Leg - Public Consultation
Bai Hotel Cebu, Mandaue City, Cebu
Mindanao Leg – Public Consultation
Apo View Hotel, Davao City
Luzon Leg – Public Consultation
The Marquis Events Place, BGC, Taguig City

The draft policy aims to help generation companies understand the definitions and
processes involved in the decommissioning and mothballing. It also seeks to provide
clear guidelines for applicants, enhance the DOE’s ability to plan and monitor the
power supply profile in coordination with System Operator, ensure that the generation

5 Section 2.8 of DOE DC No. DC2010-03-0003 provides that Generating Companies shall seek prior clearance from the

DOE regarding any plans for deactivation or mothballing of existing generating units or facilities critical to the reliable
operation of the Grid

POWER DEVELOPMENT PLAN 2023-2050

20

=== pdp-2023-2050-ch1-page-021.pdf ===
companies comply with the requirements set by relevant agencies, and clarify the
roles and responsibilities of each agency involved.

2. Transmission and System Operation
2.1 Existing Transmission Facilities
In December 2022, the total substation capacity being managed by the National Grid
Corporation of the Philippines (NGCP) reached 48,801 MVA with a total transmission
line length of to 21,027 circuit-km (ckt-km), as summarized in Table 5. Luzon has the
largest substation capacity, followed by Mindanao and Visayas. Mindanao’s total
transmission line length is more significant than the Visayas due to the grid’s larger
geographical size.
Table 5. Existing Transmission Facilities, 2021-2022

Grid

Substation Capacity (MVA)

Transmission Line Length (ckt-km)

2021

2022

2021

2022

Luzon

29,955

35,641.00

9,617.42

9,631.90

Visayas

5,287.50

5,848.50

5,297.99

5,393.49

Mindanao

6,091

7,311.00

5,864.14

6,001.60

Total

41,333.50

48,800.50

20,779.55

21,027.00

Source: Transmission Development Plan (TDP) 2023-2040 Consultation Report

To ensure that the voltages across the transmission network are compliant with the
prescribed levels in the Philippine Grid Code (PGC), capacitor banks and shunt
reactors have been installed in appropriate locations in Luzon, Visayas, and
Mindanao. As of December 2022, the total Capacitor Banks and Shunt Reactors
installed were recorded at 5,787 MVAR.

2.2 Transmission Projects
The NGCP completed 31 transmission projects or portions of a project from January
2021 to December 2022 based on the December 2022 Transmission Project Status
Report, which is classified into three types, namely substation capacity upgrading,
transmission line (TL) extension, and voltage improvement. These projects are
expected to support the increasing electricity demand, accommodate the
upcoming power generation capacities, and enhance the system reliability.
Table 6. Completed Transmission Projects, 2021-2022
Grid

Project Name

Energization

Luzon

Luzon Voltage Improvement Project 3

30 August 2021

Luzon

Luzon PCB Replacement

31 Jan 2021

Luzon

Luzon Voltage Improvement Project 6

01 May 2021

Luzon

North Luzon S/S Upgrading Project

12 December 2021

POWER DEVELOPMENT PLAN 2023-2050

21

=== pdp-2023-2050-ch1-page-022.pdf ===
Grid

Project Name

Energization

Luzon

Calamba 230kV S/S

17 May 2021

Luzon

Luzon Voltage Improvement Project 4

30 May 2021

Luzon

Tower Resiliency of Bicol Transmission Facilities

05 October 2021

Luzon

Balsik (Hermosa) - San Jose 500 kV TL

19 December 2022

Luzon

Mariveles – Balsik (Hermosa) 500kV TL

09 April 2022

Luzon

San Jose – Angat 115kV TL Upgrading

20 May 2022

Luzon

Luzon Voltage Improvement Project 3

13 October 2022

Luzon

Pagbilao 500kV S/S Project

26 October 2022

Luzon

South Luzon S/S Upgrading Project 2

14 December 2022

Luzon

Clark – Mabiga 69kV TL Project

10 October 2022

Luzon

South Luzon S/S Upgrading Project

07 November 2022

Luzon

Ambuklao – Binga 230kV TL Project

17 July 2022

Visayas

Sta. Rita-Quinapondan 69kV TL Project

04 July 2021

Visayas

Permanent Restoration for the Panitan-Nabas 138kV TL
affected by Typhoon Ursula (14 Towers)

06 October 2021

Visayas

Cebu – Negros Panay 230kV Backbone, Stage 3

24 December 2022

Visayas

Panitan – Nabas Line 2 Stringing Project

28 April 2022

Visayas

Tagbilaran 69kV S/S Project

06 November 2022

Visayas

Mindanao-Visayas Interconnection Project

10 December 2022

Visayas

Cebu-Negros-Panay 230kV Backbone, Stage 2

15 December 2022

Mindanao

Zamboanga Peninsula Voltage Improvement

23 April 2022

Mindanao

Mindanao S/S Upgrading Project

22 November 2021

Mindanao

Mindanao S/S Upgrading Project

04 June 2022

Mindanao

Kauswagan-Lala 230kV TL Project

23 February 2022

Mindanao

Polanco – Oroquieta 138kV TL Project

11 April 2022

Mindanao

Eastern Mindanao Voltage Improvement Project

21 August 2022

Mindanao

Mindanao-Visayas Interconnection Project

09 December 2022

Mindanao

Agus 2 Switchyard Upgrading/Rehabilitation

11 September 2022

Source: NGCP’s Transmission Project Status Report as of December 2022

2.3 Ancillary Services – Competitive Selection Process
Following the promulgation of Department Circular No. DC2021-10-00316 on 04
October 2021, the DOE is continuously monitoring the implementation of the
Competitive Selection Process (CSP) of the System Operator (SO). Out of the 38
bidders issued with Notice of Award from the result of the CSP, only the Ancillary
6 Entitled “Prescribing the Policy for the Transparent and Efficient Procurement of Ancillary Services by the System

Operator”

POWER DEVELOPMENT PLAN 2023-2050

22

=== pdp-2023-2050-ch1-page-023.pdf ===
Services Procurement Agreements (ASPA) for the 36 bidders were executed and filed
with the ERC due to non-acceptance of the award of two winning bidders.

2.4 Issued Endorsement for Transmission Projects under the EVOSS System
From January 2021 to December 2022, the DOE has issued 57 Certificate of
Endorsement to Energy Regulatory Commission for the Point-to-Point (P2P) Limited
Transmission Facilities. In November 2022, this process was integrated into the EVOSS
system, resulting to two (2) endorsements being issued online as listed in Table 7.
Table 7. DOE Issued Endorsement for Transmission Projects, 2021-2022
2021

2022

November 2022 –
EVOSS System

37

18

2

2.5 Direct Connection Updates
With the promulgation of RA No. 110327 and RA No. 112348, the process “Approval of
Application for Direct Connection to the Grid” adopted the Quality Management
System and conformed with the requirements of the ISO 9001:2015 to continually
improve the process by ensuring that all strategic efforts are geared towards the
established quality policy and objectives.

3. Distribution
3.1 Number of Customers
The distribution utilities (DUs) registered a total of 20.3 million captive customer
connections in 2020. About 92% of them are residential customers, while the remaining
are commercial, industrial, and others (other customer categories composed of
government, streetlights, irrigation, etc.,) as summarized in Table 8.
Table 8. 2020 Captive Customer Connections, in million
Grid

Residential

Commercial

Industrial

Others

Total per Grid

Luzon

12.27

0.84

0.02

0.16

13.29

Visayas

3.55

0.18

0.01

0.08

3.82

Mindanao

2.90

0.21

0.02

0.07

3.19

Total per Sector

18.72

1.23

0.05

0.31

20.31

Source: 2021-2030 Distribution Development Plan (DDP)
Note: Totals may not add up due to rounding

7 Entitled, “Ease of Doing Business and Efficient Government Service Delivery Act of 2018”
8 Entitled, “Energy Virtual One-Stop Shop Act” or “EVOSS Act”

POWER DEVELOPMENT PLAN 2023-2050

23

=== pdp-2023-2050-ch1-page-024.pdf ===
In 2021, 22.6 million captive customer connections were recorded by the DUs with an
11% annual growth rate from the 2020 level. Majority of the customers are residential,
comprising 92% of the total number of customers, as shown in Table 9.
Table 9. 2021 Captive Customer Connections, in million
Grid

Residential

Commercial

Industrial

Others

Total per Grid

Luzon

13.17

0.90

0.02

0.17

14.25

Visayas

3.87

0.19

0.01

0.09

4.15

Mindanao

3.85

0.25

0.02

0.10

4.21

Total per Sector

20.88

1.33

0.05

0.35

22.62

Source: 2022-2031 DDP (Note: Totals may not add up due to rounding)

3.2 Capital Expenditures
The DUs have implemented various capital expenditure projects, which include
electrification, network, and non-network projects, among others. As of 2020, the DUs
have completed a total of 2,736 ckt-km of sub-transmission facilities, 67,515 ckt-km of
distribution facilities, and 20,461 MVA of substation capacities as shown in Table 10.
These projects were necessary to ensure that the load growth and development in
the franchise area of the DU will be supported by a reliable and efficient distribution
system.
Table 10. 2020 Capital Expenditures Projects

Grid

Sub-transmission
Facilities (ckt-km)

Distribution Facilities
(ckt-km)

Substation
Capacity (MVA)

Luzon

2,456

48,943

19,819

Visayas

236

16,923

429

Mindanao

44

1,649

213

Total

2,736

67,515

20,461

Source: 2021-2030 DDP (Note: Totals may not add-up due to rounding)

In 2021, a total of 2,660 ckt-km of sub-transmission facilities, 48,509 ckt-km of distribution
facilities, and 21,340 MVA of substation capacities (Table 11) were implemented by
the DUs and added to their existing distribution assets.
Table 11. 2021 Capital Expenditures Projects
Grid

Sub-transmission
Facilities (CKT-KM)

Distribution Facilities
(CKT-KM)

Substation
Capacity (MVA)

Luzon

2,398

36,253

20,995

Visayas

216

11,826

189

Mindanao

46

430

156

POWER DEVELOPMENT PLAN 2023-2050

24

=== pdp-2023-2050-ch1-page-025.pdf ===
Grid

Sub-transmission
Facilities (CKT-KM)

Distribution Facilities
(CKT-KM)

Substation
Capacity (MVA)

Total

2,660

48,509

21,340

Source: 2022-2031 DDP (Note: Totals may not add-up due to rounding)

3.3 Distribution Utilities – Competitive Selection Process
To streamline the conduct of CSP and the responsibilities of the DOE, Energy
Regulatory Commission (ERC), and National Electrification Administration (NEA) under
the Republic Act (RA) No. 9136 or the Electric Power Industry Reform Act (EPIRA), the
DOE issued Department Circular No. DC2023-06-00219 on 30 June 2023, which took
effect on 18 July 2023 after publication at The Daily Tribune and Business World on 04
July 2023. Pursuant to the said policy, the conduct of CSP shall be in accordance with
the guidelines of the ERC and the NEA, in the case of Electric Cooperatives (ECs).

4. Supply
4.1 Retail Competition and Open Access Updates
Retail competition and open access (RCOA) participants have grown significantly
since its establishment in 2013. Initially, the threshold was set at a monthly average
peak demand of one (1) MW but later adjusted to 750 kW and 500 kW moving towards
the EPIRA vision of customer choice. Despite the increasing number of contestable
customers, there is still a notable number of qualified end-users under the captive
market who haven’t switched yet to RCOA especially in the 500 kW to 749 kW
threshold.
Table 12. Captive vs. Contestable Customer Statistics
Prospective Endusers under
Captive

Registered
Contestable
Customers

December 2022

December 2022

291

1,222

231

426

649

275

Sub-Total

1,171

1,923

RES

-

38

Local RES

-

15

Sub-Total

-

53

Retail Market Participants

Average Peak
Demand ≥ 1MW
Contestable
Customers

Suppliers

750kW ≥ Average
Peak Demand >
1MW
500kW ≥ Average
Peak Demand > 749
kW

9 Entitled, “Prescribing the Policy for the Mandatory Conduct of the Competitive Selection Process by the Distribution

Utilities for the Procurement of Power Supply for Their Captive Market”

POWER DEVELOPMENT PLAN 2023-2050

25

=== pdp-2023-2050-ch1-page-026.pdf ===
Supplier of Last Resort

-

25

Retail Metering Services Provider

-

63

Grand Total

-

2,073

On 29 July 2019, the DOE promulgated Department Circular No. DC2019-07-001110,
which amended some provisions of DC2013-07-0013 and DC2018-01-0002 to clarify
voluntary participation in the RCOA, designate the Independent Market Operator
(IMO) as the central registration body and reduce barriers to entry for qualified
contestable customers. To further promote competition and develop the retail
market, the ERC adopted ERC Resolution No. 12, Series of 202011, which expanded
RCOA participation to end-users with at least 500kW average monthly peak demand.
Meanwhile, studies on the implementation of retail aggregation are being
coordinated with the IMO to allow aggregation of lower threshold consumers
contiguously situated for them also to exercise customer choice. Currently, the pilot
implementation of the Retail Aggregation has commenced last 24 June 2022, in
partnership with the ERC, Manila Electric Company (MERALCO), and UP Diliman,
pending the implementation in UP Diliman while addressing their issues on the CSP.

4.2 Net Metering
Net-Metering refers to a system, not exceeding 100kW, appropriate for distributed
generation, in which a distribution grid user has a two-way connection to the grid and
is only charged for his net electricity consumption and is credited for any overall
contribution to the electricity grid. This allows an end-user to be a prosumer (both a
consumer and energy producer), but not a net power generator. As of December
2022, a total of 7,583 qualified end-users covering 65 DUs, were registered in the
program, with a total rated capacity of 63.2MWp.

4.3 Green Energy Option Program
The supply sector became broader and more competitive with the promulgation of
the Green Energy Option Program (GEOP). On 18 July 2018, the DOE issued
Department Circular No. DC2018-07-001912. However, it was only after the issuance of
the ERC Resolution No. 8, series of 2021 or the “Rules for the GEOP” in August 2021 that
the program became fully operational.
The GEOP is a non-regulated voluntary policy mechanism that allows electricity endusers with 100kW and above demand to source their electricity supply from RE sources
through RE Suppliers. As of December 2022, the DOE has issued 18 GEOP Operating

10 Entitled, “Amending Various Issuances on the Implementation of the Retail Competition and Open Access

(RCOA)”
11 Entitled, “A Resolution Prescribing the Timeline for the Implementation of Retail Competition and Open Access”
12 Entitled, “Promulgating the Rules and Guidelines Governing the establishment of the Green Energy Option
Program Pursuant to the Renewable Energy Act of 2008”

POWER DEVELOPMENT PLAN 2023-2050

26

=== pdp-2023-2050-ch1-page-027.pdf ===
Permits to RE Suppliers through Department Circular No. DC2020-04-000913. A total of
199 customers in Luzon and Visayas have already switched to the GEOP, which is
equivalent to 60.99MW non-coincidental peak demand.

5. Electricity Market
5.1 Wholesale Electricity Spot Market (WESM) Mindanao
The establishment of WESM Mindanao serves as a mechanism for efficiently
scheduling, dispatching, and settling energy transactions in the Mindanao Grid. Under
the WESM regime, the DOE aims to rectify all grid arrangements, particularly those that
do not comply with existing applicable rules and regulations.
In DC2022-12-0039, the DOE declared the launch of commercial operation of WESM
Mindanao on 26 January 2023. WESM in Mindanao will be vital in facilitating the
import-export of energy through the MVIP. Through the implementation of WESM and
the connection of Visayas and Mindanao, the reliability and security of electric power
supply, not only in the Mindanao but also in Visayas and Luzon, will be realized.

5.2 Reserve Market
The Reserve Market provides a new avenue for the procurement of reserves to
augment the current procurement of Ancillary Services (AS) via CSP to satisfy the
required AS levels and ensure a sustainable, reliable, affordable, and secure energy
supply in the country through the co-optimization of energy and reserves in the WESM
and Reserve Market. The full commercial operations of the Reserve Market will
encourage more investments in the energy sector to satisfy the growing energy
demand and ensure the reliability and stability of the Grid.
The DOE intends to release a Department Circular in the third quarter of 2023, to
officially announce the commercial operations of the Reserve Market. The goal is to
initiate full commercial operations by December 2023, at which point transactions will
become financially binding and the complete co-optimization of energy and reserves
will be achieved.

5.3 Preferential Dispatch for Renewable Energy
Through the DOE Department Circular No. DC2022-10-003114 issued on 05 October
2022, all intermittent and Feed-in-Tariff (FIT) eligible RE generating units, including wind,
solar, run-of-river hydro, and ocean are given preference in the WESM dispatch
schedule to ensure its maximum output injection to the grid. Biomass, geothermal, and
impounding hydro have the option to enjoy preferential dispatch, taking into
consideration the contractual obligations with their respective customers.

13 Entitled, “Guidelines Governing the Issuance of Operating Permits to Renewable Energy Suppliers under the Green

Energy Option Program”
14 Entitled, “Declaring All Renewable Energy Resources as Preferential Dispatch Generating Units in the Wholesale
Electricity Spot Market Amending for this Purpose Department Circular No. DC2015-03-0001”

POWER DEVELOPMENT PLAN 2023-2050

27

=== pdp-2023-2050-ch1-page-028.pdf ===
6. Missionary Electrification
6.1 Demand and Supply Statistics

Figure 7. 2022 Off-Grid Demand and Supply Statistics

In 2022, the off-grid areas had a total demand of 332 MW, with Luzon having the
highest share of 79% since it includes the very large island grids of Mindoro,
Marinduque, Palawan, Catanduanes, and Masbate, while Visayas and Mindanao
having 8% and 13% share respectively as shown in Figure 7.

Figure 8. 2022 Off-Grid Total Demand as of 31 December 2022

As of December 2022, the total supply in off-grid areas in terms of the rated and
dependable capacity is 674 MW and 548 MW, respectively, which is dominated by
the New Power Providers (NPPs) as shown in Figure 8.

POWER DEVELOPMENT PLAN 2023-2050

28

=== pdp-2023-2050-ch1-page-029.pdf ===
6.2 Off-Grid Transmission and Substation Systems
6.2.1 Existing Transmission and Substation Systems
Table 13 shows the summary of existing transmission system facilities of the
National Power Corporation (NPC) in five (5) areas of Luzon namely Mindoro,
Palawan, Catanduanes, Masbate, and Marinduque as of December 2022.
Table 13. 2022 Existing 69kV Transmission and Substation Systems in Off-Grid Areas

Area/Island

Transmission Line
Length (ckt-km)

Substation
Capacity (MVA)

Mindoro

449.03

95

Palawan

359.30

60

Catanduanes

99.67

20

Masbate

149.21

20

Marinduque

58.51

20

Total

1,115.72

215

Source: NPC’s Missionary Electrification Plan (MEP) 2023-2027

6.2.2 Off-Grid Transmission and Substation System Projects
Table 14 shows the summary and status of NPC’s transmission system projects as
of December 2022 in five (5) off-grid areas.
Table 14. List of On-Going Transmission System Projects in the Off-Grid Areas
Target Year
of Completion

Status

1. Construction of Roxas – Taytay 69kV TL (36.6
ckt-kms.) (Schedule 1)

2022

100% Completed

2. Construction of Roxas – Taytay 69kV TL (34.7
ckt-kms.) (Schedule 2)

2022

100% Completed

3. Upgrading of Roxas Substation from 5 MVA
to 10 MVA Capacity

2023

On-going procurement

1. Construction of San Miguel – Viga 69kV TL
(23.0 ckt-kms.)

2022

80.08% Completed

2. Construction of 5 MVA New Viga
Substation

2023

45.31% Completed

Project Name
•

•

•

Palawan

Catanduanes

Masbate

POWER DEVELOPMENT PLAN 2023-2050

29

=== pdp-2023-2050-ch1-page-030.pdf ===
Project Name

Target Year
of Completion

Status

1. Construction of Tap – Uson 69kV TL (1.2 cktkm)

2023

On-going procurement

2. Upgrading of Mobo Substation from 10
MVA to 20 MVA Capacity

2022

100% Completed

1. Construction of Mogpog – Buenavista 69kV
TL (32.0 ckt-km)

2023

On-going procurement

2. Construction of 20 MVA New Mogpong
Substation

2022

100% Completed

2026

Tendering

•

•

Marinduque

Sulu

Construction of Jolo Tie Line (5.0 ckt-km)
Source: NPC’s MEP 2023-2027

6.3 Missionary Electrification Development Plan (MEDP) Publication
The DOE has published the 2021-2025 Missionary Electrification Development Plan
(2021 MEDP) dated 17 February 2023 on the DOE Website. The 2021 MEDP provides
major updates to the 2016-2020 MEDP to introduce new policies, strategies, and
governance reforms for off-grid power development and missionary electrification in
accordance with Department Circular No. DC2019-01-000115. The main objectives of
the 2021 MEDP are to support the following strategic goals of the Government as
shown in Figure 9.

Figure 9. MEDP Objectives

15 Entitled, “Prescribing the Omnibus Guidelines on Enhancing Off-Grid Power Development and Operation”

POWER DEVELOPMENT PLAN 2023-2050

30

=== pdp-2023-2050-ch1-page-031.pdf ===
7. Total Electrification
Access to electricity is regarded as a transformative tool that leads to the
improvement of the quality of life of people. The government, mindful of the impact
that electricity access brings, is guided with the goal of attaining 100.0% electrification
in the country by 2028. The attainment of the total electrification goal entails the
continuous implementation of electrification programs that are overseen by the Total
Electrification Steering Committee (TESC) composed of the DOE, NEA, and NPC and
complemented by the National Total Electrification Roadmap (NTER) which is the
consolidated Local Total Electrification Roadmap (LTER) of the DUs.
The provision of electricity is an obligation to be carried out by DUs and this must be
supplied in the least cost manner subject to the collection of retail rates approved by
the ERC. The DUs are also responsible for providing service to unviable areas and in
cases wherein there is no viable solution, these areas may be transferred to another
DU (if there is any available). A Microgrid Service Provider (MGSP), pursuant to RA No.
1164616 or the “Microgrid Systems Act”, comes in if DUs are unable to serve remote
and unviable areas. The DOE is responsible for declaring these remote and unviable
areas open for private-sector participation. The NPC may enter if neither a DU nor an
MGSP can provide electricity service.

7.1 Total Household Electrification by 2028
To achieve the goal of 100.0% Household electrification by 2028, the National Total
Electrification Framework (NTEF), as shown in Figure 10 below, has been thoughtfully
designed to overcome past challenges and ensure the success of electrification plans
and programs. This comprehensive framework encompasses key factors, such as
electrification strategies, funding sources, and project implementers.

Figure 10. National Total Electrification Framework

16

Entitled, “An Act Promoting the Use of Microgrid Systems to Accelerate the Total Electrification of Unserved and
Underserved Areas Nationwide” or “Microgrid Systems Act”

POWER DEVELOPMENT PLAN 2023-2050

31

=== pdp-2023-2050-ch1-page-032.pdf ===
7.1.1. 2022 Household Electrification Status
Electrification at the household (HH) level stood at 96.2% in 2022 based on the 2015
PSA census, an increase of 0.74 percentage points from the 2021 level of 95.4%.
The rise in electrification level indicates that 25.91 million households out of the
potential 22.98 million are now with electricity service.
30,000,000

96.2%

95.4%

90.00%

80.00%
70.00%

No. of
Households

20,000,000

60.00%
50.00%

15,000,000

40.00%
30.00%

10,000,000

% Electrification

25,000,000

100.00%

20.00%
10.00%

5,000,000

2021

2022

Unserved HH

1,055,722

879,232

Served HH

25,016,841

25,914,019

95.41%

96.17%

% Electrification

0.00%

Figure 11. Household Electrification Status, 2021 – 2022

Luzon recorded the highest electrification level at 98.9% with 16.1 million energized
households. Visayas closely followed with an electrification level of 97.6%
equivalent to 4.83 million energized households, while Mindanao remains to have
the highest number of unserved households at 625,687 equating to an
electrification level of only 88.1%.
Table 15. Household Electrification Status, 2022 (Per Island Group)
Potential HHs
(2015 PSA)

Served HHs (4th
Quarter 2022)

Unserved HHs,
per DU per
Province

% HH
Electrification

Luzon

13,318,261

16,092,459

176,479

98.9

Visayas

4,401,698

4,834,595

105,110

97.6

Mindanao

5,265,012

4,987,091

625,687

88.1

Grand Total

22,984,97

25,914,073

879,232

96.2

Major Island
Group

In terms of electrification level aggregated by DUs, ECs stand at 94.2%
electrification level accounting for 14,311,409 households. For the private sector,
MERALCO already has achieved 100.0% electrification in its franchise area
equivalent to 6.4 million households. Electrification remains a challenge for the
unviable areas served by the MGSP (formerly Qualified Third-Party or QTP) with an
electrification level of 62.6% or 23,696 households.

POWER DEVELOPMENT PLAN 2023-2050

32

=== pdp-2023-2050-ch1-page-033.pdf ===
Table 16. Household Electrification Status, 2022 (Per DUs)
Potential HHs
(2015 PSA)

Served HHs (4th
Quarter 2022)

Unserved HHs,
per DU per
Province

% HH
Electrification

14,311,409

15,420,243

829,287

94.2

EC-QTP/NPC-SPUG

23,696

15,194

8,873

62.6

MERALCO

6,478,982

8,207,684

0

100.0

Other DUs

2,170,884

2,270,952

41,072

98.1

Grand Total

22,984,971

25,914,073

879,232

96.2

DUs
ECs

7.1.2. Addressing Barriers to Program Implementation
a) Policy Guidelines for the Implementation of the DOE-Locally Funded Projects
– Total Electrification Project
The DOE issued two (2) policies on the implementation of the Locally Funded
Projects – Total Electrification Project (LFP-TEP). The DOE issuance of TEP 1 –
Policy Guidelines on the implementation of LFP-TEP which provides allocation
to NEA and NPC and the DUs to implement the application of electrification
strategies for un-energized households in both grid and off-grid areas. The
other policy is TEP 2 – which provided the policy guidelines for the provision of
portable solar home systems to energize conflict-affected and vulnerable
areas by the DOE in partnership with the concerned ECs. Another policy on
the implementation of TEP will be issued for the participation of other qualified
implementers such as State Universities and Colleges, and private groups,
aside from NEA and NPC. This will address the issues of absorptive capacity
to implement the projects and fund liquidation.
On 05 October 2022, the NEA and NPC submitted to the DOE their updated
Work and Financial Plans for TEP fiscal year (FY) 2022 Funds. The submission
was in consideration of the new timeline and project costing for their
respective prioritized electrification projects. In addition, NPC has submitted
the details of the PhP195 million allocated budget for the implementation of
electrification projects in Missionary Areas.
Lastly, Executive Order (EO) No. 156, Series of 202117 Composite Team has
approved the final list of projects to be funded under the TEP FY2022, including
the electrification project of NPC for Missionary Areas. The corresponding
Notices of Award to NEA and NPC were issued on 20 December 2022 and the
Memorandum of Agreement for the approved project was signed, notarized,
and issued on the same day.

17 Executive Order No. 156, Series of 2021 entitled “Instituting Measures to Ensure Consistent and Reliable Electricity

Service in Inadequately Served Areas, Improve Performance of Ineffective Distribution Utilities, and Achieve Total
Electrification of the Country”

POWER DEVELOPMENT PLAN 2023-2050

33

=== pdp-2023-2050-ch1-page-034.pdf ===
b) Institutionalization of Total Electrification Steering Committee
On 12 December 2021, the former President Rodrigo R. Duterte signed EO 156,
s. 202118, which directs DOE to carry out the following: a) identify inadequately
served areas; b) mandate the DUs to submit a comprehensive electrification
master plan (CEMP) and modify or reject such if not in accordance with the
total electrification objective; c) take appropriate steps to ensure
electrification of inadequately served areas; d) formulate mechanism for the
LGUs and communities to determine if they are inadequately served; e)
determine and identify all underperforming and ineffective DUs; f) conduct
performance review of DUs and agencies involved in total electrification; and
g) promulgate rules and regulations for the entry and integration of
microgrids, distributed energy resources (DERs), and other alternative service
providers.
To accelerate and fully realize the implementation of the EO 156, s. 2021, the
DOE issued the Department Order No. DO2022-02-000219 which created the
Composite Team as the lead responsible for the overall implementation of the
EO under direct supervision and guidance of the DOE and established a
Technical Working Group (TWG) that will provide technical support and
assistance in the planning and operation of the Composite Team.
On 21 January 2022, RA No. 11646 was issued by President Duterte while the
IRR was released on 24 May 2022 as Department Circular No. DC2022-05001720. The DOE recognizes the need to organize a new steering committee
dedicated to supervising and providing directions in the implementation of
various plans and programs for the provision of electricity access to
communities that are identified as unserved and underserved by the DUs and
other responsible entities.
On 21 December 2022, the DOE issued Department Order No. DO2022-12001621 TESC which supervises and provides direction in the formulation of NTER.
The NTER shall be the consolidation of the LTER of DUs nationwide which
includes areas declared as unserved and underserved areas, in accordance
with RA No. 11646 and its implementing rules and regulations. The Steering
Committee shall also monitor and conduct periodic reviews of the
implementation of the NTER and direct adjustments as necessary, to consider,
among others, demographic changes, new approaches to electrification,
and identification of alternative support to expand energy access. Provide
timely resolution to policy gaps and implementation issues affecting the
achievement of the total electrification target.

18 Ibid
19 Entitled, “Implementing Framework of Executive Order No. 156 s. 2021”
20 Entitled, “Rules and Regulations to Implement Republic Act No. 11646”
21 Entitled, “Creating the Total Electrification Steering Committee to Accelerate the National Total Electrification”

POWER DEVELOPMENT PLAN 2023-2050

34

=== pdp-2023-2050-ch1-page-035.pdf ===
c) Republic Act (RA) No. 11646
The enactment of the Microgrid Systems Act (MGSA) on 21 January 2022
serves to complement the government’s continuing efforts towards total
electrification. MGSA was enacted to pursue sustainable rural development
and poverty reduction, promote private sector participation, provide a
competitive environment and level playing field for different kinds of energy
sources with a preference for low-cost, indigenous, and renewable, and
ultimately to accelerate total electrification and ensure the provision of
quality, reliable, secure, and affordable supply of electrification of
underserved and unserved areas. In compliance with the MGSA, the DOE
promulgated and published Department Circular No. DC2022-05-0017 or
MGSA-IRR which took effect on 25 June 2022, 15 calendar days following its
publication on 09 June 2022.
Under the said Act, those qualified to apply as an MGSP are entities, including
private corporations, local government units (LGUs), cooperatives, nongovernment organizations, generation companies and their subsidiaries, and
DUs and their subsidiaries who are capable and willing to comply with the
technical, financial, and other requirements through CSP.
d) National Total Electrification Roadmap (NTER)
The passage of RA No. 9136 or the EPIRA provides the policy of the state to
ensure and accelerate the total electrification of the country. With the fastchanging economic and demographic landscape, the DOE, being mandated
to ensure that this objective is attained, has initiated various programs such as
the Accelerated Barangay Electrification Program and the Expanded Rural
Electrification Program, that led to an estimated 100.0% barangay
electrification in 2008.
While substantial progress has been made in electrifying barangays, household
electrification remains a challenge, prompting not only the DOE but other
government instrumentalities as well to formulate programs to support 100.0%
electrification. The challenges include ensuring 24/7 electricity services to all
areas in the country up to the remote barangays and islands. Meanwhile, the
framework must consider that demand for connection services in areas with
access to the grid will continue to increase alongside population and
household growth.
Total electrification of the country remains a priority amid population and
economic expansion. The Philippine Energy Plan (PEP) 2023-2040 emphasized
the goal of achieving total electrification in the country, particularly in bringing
electricity services to consumers in off-grid or missionary areas, to which the
involvement of the private sector is imperative.
Recognizing the importance of proper planning in total electrification, RA No.
11646 mandated the DOE to prepare and publish annually on its website the
NTER, upon consultation with public and private stakeholders. The NTER is a
comprehensive national strategic plan including a work plan to accelerate

POWER DEVELOPMENT PLAN 2023-2050

35

=== pdp-2023-2050-ch1-page-036.pdf ===
total electrification in the country considering the various LTERs and the DDPs
which shall be incorporated in the PEP.

7.2 Grid and Off-Grid Electrification
7.2.1. Grid
a) Nationwide Intensification of Household Electrification (NIHE)
The program reported a total of 274,035 energized households in 2022 out of
the 344,090 households with approved house wiring and kilowatt-hour (kWh)
meter subsidy. The restrictions imposed by community quarantine because of
COVID-19 affected and halted installation activities for the identified
beneficiaries. As a move to ensure project completion, the DOE drafted for
approval an Advisory to provide guidance to concerned DUs implementing
the program regarding their concerns on fund releases and inspection upon
completion.
b) Sitio Electrification Program (SEP)
The SEP covers the energization of sitios, which are territorial enclaves within a
barangay that is distant from the barangay center and composed of at least
30 – 40 households. As of December 2022, NEA was able to energize 951 sitios
out of the 1,085 DBM-approved sitios to be energized under the 2022 General
Appropriation Act (GAA) with an estimated project cost of Php1.27 billion.
c) Barangay Line Enhancement Program (BLEP)
The BLEP pertains to the connection to the grid of barangays previously
energized through small generating sets, solar home systems (SHS), and microhydro. The program also covers the improvement of tapping points and/or
installation of underground / submarine cables. For the period 2022 to 2026,
166 barangays are being targeted by the program with a proposed budget
of PhP2.4 billion (to be proposed in the GAA from 2022 to 2026 and subject to
the subsidy of the national government).

7.2.2 Off-Grid
a) DOE- PV Mainstreaming (PVM)
Solar PV Mainstreaming Program is the DOE’s program to address unenergized highly dispersed, remote HHs who are far from the distribution lines
of the ECs. It is financed by both the DOE’s LFP and the European Union
through the Access to Sustainable Energy Program (ASEP). The program
adopts the Fee-for-Service Business Model where the ECs install the SHS in unenergized households (located in areas unviable for grid extension) within the
EC’s franchise area. The ECs are the owners of the hardware and are
responsible for the installation, maintenance, repair, and replacement of the
system components. The homeowner’s responsibility covers the household
wiring, lights, and other 12-volt direct current (DC) loads/appliances.

POWER DEVELOPMENT PLAN 2023-2050

36

=== pdp-2023-2050-ch1-page-037.pdf ===
The Program under the DOE’s LFP has completed seven (7) projects
implemented by seven (7) ECs in Luzon, Visayas, and Mindanao. A total of
11,113 households benefited from the Projects for the reporting period. All
participating ECs namely: Sultan Kudarat Electric Cooperative, Inc. (SULECO),
Busuanga Island Electric Cooperative, Inc. (BISELCO), Quezon II Electric
Cooperative, Inc. (QUEZELCO II), Iloilo II Electric Cooperative, Inc. (ILECO II),
Zamboanga Sur I Electric Cooperative, Inc. (ZAMSURECO I) and Bohol II
Electric Cooperative, Inc. (BOHECO II) were already technically and
financially completed and liquidated.
An endorsement to the ERC was also made by the DOE for all the completed
PVM Projects. This is in relation to the issuance of an Order of Approval and in
compliance with the ERC Resolution No. 17 series of 201722.
Table 17. DOE’s Locally Funded Project (LFP) on PVM
Electric Cooperative

No. of HH

Status

Remarks

QUEZELCO II

1,333

Completed

Closed

BISELCO

3,711

Completed

Closed

BOHECO II

530

Completed

Closed

SULECO

2,575

Completed

Closed

ZAMSURECO I

1,129

Completed

Closed

ILECO II

706

Completed

Closed

BISELCO (Batch 2)

1,129

Ongoing

Closed

QUEZELCO II

1,333

Completed

Closed

Total

11,113

b) Access to Sustainable Energy Programme (ASEP)
The program’s PVM component focuses on rural electrification by providing
SHS to 40,500 households in the franchise areas of participating ECs. This is
divided into two (2) windows where Window 1 targets 10,000 households
(financed by the European Union or EU and Global Partnership on OutputBased Aid Grants or GPOBA) and Window 2 covers the remaining 30,500
households (EU financed only).
Table 18. EU-ASEP’s PVM Component
Electric Cooperative

Window 1

No. of HH

COTELCO

2,500

DASURECO

2,500

SOCOTECO II

2,500

Status

Completed

22 Entitled, “A Resolution Adopting the Rules Governing the Setting of Regulated Solar Home System (SHS) Tarriff for

the Provision of Electricity Service for Rural Electrification by Electric Cooperatives (ECs)”

POWER DEVELOPMENT PLAN 2023-2050

37

=== pdp-2023-2050-ch1-page-038.pdf ===
Electric Cooperative

Window 2

No. of HH

SUKELCO

2,500

Sub-Total

10,000

FIBECO

1,000

BUSECO

2,500

COTELCO

6,100

SUKELCO

5,900

DASURECO

7,500

SOCOTECO II

7,500

Sub-Total

30,500

Total

Status

On-going

40,500

●

The first window of PVM (10,012 SHS installation) was completed by the first
implementation agency, Local Government Unit Guarantee Corporation
(LGUGC) in March 2019 and the installed SHS are operational, and this
benefitted 10,000 households within the franchise areas of COTELCO,
Davao del Sur Electric Cooperative (DASURECO), South Cotabato II
Electric Cooperative (SOCOTECO II), and SUKELCO.

●

The second window of PVM (30,500 SHS installation) was completed by the
National Power Corporation (NPC) as of September 30, 2022.

●

The implementation of the PVM program was carried out through several
funding sources. More than half of the total installations were funded
through ASEP as shown in Figure 12.
Figure 12. PVM-SHS Installations per Funding Sources

PVM Funding Sources
CFP-2019-REACH
PVM-GOP-2019

500
1,129

ASEP I-PURE

3,077

PVM-CFP-2019-YAMOG

3,777

PVM-GOP-2018

4,410

NEA 2019

5,039

PVM-GOP-2017

5,574

PVM-CFP-2019-MAHINTANA

5,640

PVM-EU-ASEP-W1
PVM-EEU-ASEP-W2

10,202
30,217

c) Microgrid Systems Act
Last 21 January 2022, former President Rodrigo R. Duterte approved RA No.
11646 or the Microgrid Systems Act (MGSA). MGSA was enacted to pursue
sustainable rural development and poverty reduction, promote private sector

POWER DEVELOPMENT PLAN 2023-2050

38

=== pdp-2023-2050-ch1-page-039.pdf ===
participation, provide a competitive environment and level playing field for
different kinds of energy sources with a preference for low-cost, indigenous,
and renewable, and ultimately to accelerate total electrification and ensure
the provision of quality, reliable, secure, and affordable supply of
electrification of UUAs. In compliance with the MGSA, the DOE promulgated
and published DC2022-05-0017. The MGSA-IRR took effect on 25 June 2022, 15
calendar days following its publication on 09 June 2022.
d) Micro Grid Service Providers (MGSP)
As of December 2022, a total of 10 existing MGSP Sites in the Philippines as
shown in Table 19, are being Operated by three (3) MGSP Operators namely
Power Source Philippines, Inc. (PSPI), Sabang Renewable Energy Corporation
(SREC) and First Philippines Island Energy Corp. (FPIEC). The QTP operators
transitioned into MGSP in June 2022.
Table 19. Existing MGSPs as of December 2022

Project
Location
Malapascua,
Daan-Bantayan,
Cebu
Liminangcong,
Taytay, Palawan
Candawaga &
Culasian, Rizal,
Palawan

Sitio Sabang,
Puerto Princesa
City, Palawan

Average
Demand
Load
(kW)

Proponent

Technology

PSPI

Diesel 1.455
MW

<=40kWh =
PhP12/kWh;
>40kWh =
PhP 15/kWh

1,163

9,733.46
(Daily)

PSPI

Diesel- .805
MW

PhP 9.12/kWh

1,020

3,682.50
(Daily)

PSPI

Diesel - .43
MW

PhP
9.9082/kWh

1,062

2,934.52
(Daily)

SREC

Diesel - 1.2
MW Solar1.452 MWp
Battery
Storage 2.44 MWh

PhP12/kWh
for
Residential &
Public Bldgs;
PhP15/kWh
for
Commercial
Bldg.

588

2,589.65
(Daily)

N/A

940

93,003.75
(Monthly)

Lahuy Island,
Caramoan,
Camarines Sur

FPIEC

Haponan Island,
Caramoan,
Camarines Sur

FPIEC

Quinalasag Island
Garchitorena,
Camarines Sur

FPIEC

Brgy. Manamoc,
Cuyo, Palawan

Served
Customers

Approved
Tariff

PSPI

250 kWp
Solar + 468
kW Diesel +
232 kWh
Battery
107 kWp
Solar + 104
kW Diesel +
232 kWh
Battery
404 kWp
Solar + 585
kW Diesel +
232kWh
Battery
0.216 MW
Diesel

133

1,376

659

28,125
(Daily)

POWER DEVELOPMENT PLAN 2023-2050

39

=== pdp-2023-2050-ch1-page-040.pdf ===
Project
Location
Brgy. Port Barton,
San Vicente
Palawan
Balut Island,
Saranggani,
Davao
Occidental

Proponent

Technology

PSPI

0.61 MW
Diesel

PSPI

0.71 MW
Diesel

Approved
Tariff

Served
Customers

Average
Demand
Load
(kW)

610

3,138.71
(Daily)

3570

6000 kW
(Daily)

9.5530/kWh

The DOE issued Public Notice (PN) 2021-03-0001 on 12 March 2021, which opens
69 QTP Service Areas for the private sector – six (6) are under Negros Occidental
Electric Cooperative (NOCECO) and 63 under Palawan Electric Cooperative
(PALECO). About 26,874 households in Palawan and 3,249 households in
Negros Occidental are expected to receive electricity services once these
areas are served by QTPs/MGSPs. The QTPs/MGSPs serving these areas will be
responsible for the generation of power including the equivalent distribution
network.
Meanwhile, on 05 January 2022, the DOE issued Public Notice No.PN2022-01001: Declaration of QTP Service Areas (updating PN 2021-03-001), wherein
thirty-nine (39) areas within the PALECO’s franchise area were declared open
for private sector participation under the QTP Program. Pursuant to DC2019-110015, a Notice to Proceed dated 04 October 2021 was issued by the NEA
authorizing PALECO to conduct a CSP for the provision of QTP Services in the
declared unserved areas. The CSP Process was conducted by PALECO in April
2022 and a Notice of Award was given to Maharlika Clean Power Holdings
Corporation (MCPHC) in consortium with Clean Grid Partners Pte. Ltd. and
WEnergy Global Pte Ltd., with Special Purpose Vehicle – Archipelago
Renewable Corporation (ARC) for a total of twelve (12) lots as follows, last 17
June 2022.
Table 20. MGSP Service Areas Awarded to ARC
MGSP
Service Areas

DU

Sto. Tomas,
Dumaran

PALECO

Potential
HHs

MGSP

Capacity/ Technology

ARC

Solar - 151kwp
BSS -193 kwh Diesel -83 kW

ARC

Solar - 227kwp
BSS -226 kwh Diesel -112 kW

678
Bohol, Dumaran

PALECO

Sarong, Bataraza

PALECO

448

ARC

Solar - 151 kwp
BSS -193 kwh Diesel -83 kW

Taratak, Bataraza

PALECO

426

ARC

Solar - 227 kwp
BSS -226 kwh Diesel -112 kW

Catalagbak,
Quezon

PALECO

381

ARC

Solar - 227 kwp
BSS -226 kwh Diesel -112 kW

Taburi, Rizal

PALECO

1400

ARC

Solar - 365 kwp
BSS -411 kwh Diesel -224 kW

POWER DEVELOPMENT PLAN 2023-2050

40

=== pdp-2023-2050-ch1-page-041.pdf ===
MGSP
Service Areas

DU

Potential
HHs

MGSP

Capacity/ Technology
Solar - 151 kwp
BSS -193 kwh Diesel -83 kW

Canipaan, Rizal

PALECO

645

ARC

Solar - 227 kwp
BSS -226 kwh Diesel -112 kW

Latud, Rizal

PALECO

560

ARC

Solar - 151 kwp
BSS -193 kwh Diesel -83 kW

Alacalian, Taytay

PALECO

631

ARC

Solar - 365 kwp
BSS -411 kwh Diesel -224 kW

Bantulan, Taytay

PALECO

Solar - 151 kwp
BSS -193 kwh Diesel -83 kW
773

Silanga, Taytay

ARC
Solar - 227 kwp
BSS -226 kwh Diesel -112 kW

PALECO

Solar - 365 kwp
BSS -411 kwh Diesel -168 kW

Caruray, San
Vicente

PALECO

Binga, San Vicente

PALECO

351

ARC

Solar - 302 kwp
BSS -275 kwh Diesel -168 kW

Bebeladan, El Nido

PALECO

435

ARC

Solar - 365 kwp
BSS -411 kwh Diesel -168 kW

980

ARC
Solar - 151 kwp
BSS -193 kwh Diesel -83 kW

7.3 Energy Regulations (ER) 1-94 Program Update
As a proactive response to the pandemic and with the recognition that initiatives are
to be drawn up at the local level, the DOE issued Department Circular No. DC202004-000823. The primary objective of the policy is to provide additional fund sources for
host LGUs in addressing COVID-19. It also stipulates that all available ER1-94 funds
comprised of Electrification Funds (EF), Development and Livelihood Fund (DLF),
Reforestation, Watershed Management, Health and/or Environment Enhancement
Fund (RWMHEEF) that was administered and still with the DOE and the generating
companies (last billing quarter of 2019) will be remitted to the host LGUs upon issuance
of letter of intent for implementation of COVID-19 related projects.
The DOE already disbursed 78.7% (PhP5.06 billion of the PhP6.4 billion) of available ER
1-94 funds to host communities and beneficiaries. Around PhP1.3 billion is still available
that will need to be transferred and remitted to the host LGUs and concerned DUs.

23 Entitled, “Rationalizing the Utilization of Energy Regulation (ER) 1-94 Funds by the Host LGUs in Response to COVID-

19 Public Health Emergency”

POWER DEVELOPMENT PLAN 2023-2050

41

=== pdp-2023-2050-ch1-page-042.pdf ===
Table 21. Status of Reconciled Vs. Remitted Funds to Host Beneficiaries (as of Dec 2022)

Fund Type

Reconciled Available
ER 1-94 Funds with
DOE (Php Billion)

Disbursed ER 1-94
Funds (Php Billion)

Remaining ER 1-94
Funds (Php Billion)

EF

3.436

2.422

1.012

DLF

1.474

1.304

0.170

RWMHEEF

1.516

1.328

0.187

Total

6.425

5.055

1.370

7.4 Indigenous People/Indigenous Cultural Communities
The DOE has broadened the policy framework for the equitable, sustainable, and
inclusive sharing of financial benefits under the ER 1-94 Program by including
Indigenous Peoples and Indigenous Cultural Communities (IPs/ICCs) through
Department Circular No. DC2018-03-000524 and has provided the mechanisms to
undertake it via Administrative Operating Guidelines through Department Circular No.
DC2019-06-001025.
As of December 2022, the DOE has already enlisted 59 Host IPs/ICCs whose ancestral
lands are host to 27 power generation facilities/energy resources that cover seven (7)
regions, namely: Regions CAR, II, III, V, VI, XI, and XII. These DOE policies uphold the
rights of indigenous peoples and give them access to financial benefits as provided
through the power development projects within their ancestral lands. The DOE is in
continuous coordination and collaboration with the National Commission on
Indigenous Peoples (NCIP) of the necessary documentary requirements needed to
allow for the direct remittance of financial benefits to the IPs/ICCs that host power
generation facilities/energy resource development projects under the ER 1-94
(Benefits to Host Communities) Program.
Through this, the host IPs/ICCs beneficiaries can immediately avail and utilize the
financial benefits to augment or support their identified development projects within
their Ancestral Domain as well as help support the DOE’s pursuit of energy selfsufficiency, power development, and total electrification without sacrificing the
country’s ecological and cultural concerns.

24 Entitled, “Prescribing the Guidelines Recognizing the Rights of Indigenous Cultural Communities (ICCs)/Indigenous

Peoples (IPs) in their Ancestral Domains and Access to the Financial Benefits as Host Communities under the ER 1-94
Program and Rule 29 (A) of the Implementing Rules and Regulations of Republic Act No. 9136, Otherwise Known as,
"Electric Power Industry Reform Act of 2001"
25 Entitled. “Prescribing the Administrative Operating Guidelines for the Availment and Utilization of Financial Benefits
by the Indigenous Cultural Communities/Indigenous Peoples pursuant to the DOE Department Circular No. DC201803-0005”

POWER DEVELOPMENT PLAN 2023-2050

42

=== pdp-2023-2050-ch1-page-043.pdf ===
8. Overarching Policies and Program Implementation
8.1 EVOSS Additional Process Flows
The passage of the EVOSS Act on 08 March 2019 paved the way for streamlining and
expediting the permitting process for energy projects in the Philippines. From August
2020 to December 2022, the following endorsement and/or approval has been issued
by the Electric Power Industry Management Bureau (EPIMB) to industry participants:
Table 22. No. of Issued Endorsement of EPIMB
No. of Issuances
and Approval

EVOSS Process
Approval of TPBAC Process

28

Certificate of Endorsement for Point-toPoint Limited Transmission Facilities

2

Certificate of Endorsement to BOI

10

Certificate of Endorsement to ERC

563

Clearance to Undertake SIS

222

Direct Connection Application

11

Letter of Endorsement to BOI

2

Letter of Endorsement to NCIP

34

Letter of Endorsement to PNP

3

QTP Certificate of Endorsement to ERC
Source: DOE - Investment Promotion Office

10

Envisioned to improve efficiency, reduce bureaucratic barriers, and encourage
private-sector participation and investment in the energy sector, the DOE has added
four (4) new processes as part of the DOE’s aim to enhance and integrate new
processes in the EVOSS System.
The EPIMB and Investment Promotion Office (IPO) conceptualized and developed
these additional processes from 2021 to 2022 and will be further enhanced and
integrated EVOSS online platform by the first quarter of 2023. The new additional
processes (Figure 13) including their respective checklist of requirements may be
accessed through the EVOSS website (https://www.evoss.ph).
Generation

• Letter of Endorsement to the
Department of Agrarian
Reform for Land Use
Conversion1
• SIS Exemption for Power
Projects under 20 MW for
Luzon and 5MW for Visayas
and Mindanao

Transmission

Total
Electrification

• Certificate of Endorsement
Point-to-Point (P2P) Limited
Transmission Facilities
Process

• Certificate of Endorsement
to ERC for Microgrid
Systems Provider

Figure 13. EVOSS Additional Process Flow

POWER DEVELOPMENT PLAN 2023-2050

43

=== pdp-2023-2050-ch1-page-044.pdf ===
9. Major Policies Issued Related to the Electric Power
Industry
From January 2021 to June 2023, the DOE has successfully promulgated significant
laws and policies within the various power industry subsectors. In alignment with the
DOE’s mission and the EPIMB’s mandate to supervise the electric power industry by
ensuring an adequate, efficient, and reliable supply of electricity in the country, the
DOE has issued sixty-five (65) policies covering the period.
Table 23. Major Policy Issuances (January 2021 - June 2023)
No

Reference
Number

1

DO2023-05-0015

2

DO2023-06-0018

3

DC2021-10-0031

4

DC2023-06-0021

5

DC2021-09-0030

6

DC2021-03-0003

7

DC2022-05-0014

8

DC2023-04-0006

9

DC2023-03-0005

10

DC2022-02-0001

Policy Title
Generation (1)
Enjoining the Energy Regulatory Commission (ERC) and
Other Concerned Entities to Ensure Non-Discriminatory
Treatment of Generating Facilities Utilizing Liquefied
Natural Gas (LNG) in Accordance with their Respective
Mandates
Transmission and System Operation (2)
Creating the Performance Assessment and Audit Team
for the Operations of the Transmission Network Provider
and System Operator (PAAT-TNPSO) and Providing for its
Responsibilities
Prescribing the Policy for the Transparent and Efficient
Procurement of Ancillary Services by the System
Operator
Distribution (3)
Prescribing the Policy for the Mandatory Conduct of the
Competitive Selection Process by the Distribution Utilities
for the Procurement of Power Supply for Their Captive
Market
Amending Certain Provisions of and Supplementing
Department Circular No. DC2018-12-0003 on the
Competitive Selection Process in the Procurement by
the Distribution Utilities of Power Supply Agreement for
the Captive Market
Prescribing the Policy and Guidelines for the
Formulation of the Distribution Utilities Distribution
Development Plan Integrating the Relevant Laws, Policy
Issuances, Rules, and Regulations
Supply (1)
Amending Department Circular No. DC2020-01-0001 on
Rules Governing the Review and Evaluation of Direct
Connection Applications of Industrial, Commercial and
Other Electricity End-Users
Database Management System (3)
Providing Supplemental Policy for the Systematic
Management of the DOE Reportorial Requirements for
the Electric Power Industry Participants-Retail Electricity
Suppliers
Providing Supplemental Policy for the Systematic
Management of the DOE Reportorial Requirements for
the Electric Power Industry Participants – Distribution
Utilities
Providing Policies for the Systematic Management of
the DOE Reportorial Requirements for the Electric Power
Industry Participants
Electricity Market (47)

Date of
Issuance

23 May
2023

08 Jun 2023

04 Oct
2021

30 Jun
2023

24 Sept
2021

02 Mar
2021

10 May
2022

12 Apr 2023

14 Mar
2023
08 Feb
2022

POWER DEVELOPMENT PLAN 2023-2050

44

=== pdp-2023-2050-ch1-page-045.pdf ===
No

Reference
Number

11

DC2023-06-0021

12

DC2023-04-0007

13

DC2023-01-0004

14

DC2023-01-0003

15

DC2023-01-0001

16

DC2022-12-0039

17

DC2022-12-0038

18

DC2022-11-0036

19

DC2022-11-0032

20

DC2022-06-0025

21

DC2022-06-0024

22

DC2022-06-0023

23

DC2022-06-0022

24

DC2022-06-0021

25

DC2022-05-0015

26

DC2022-03-0012

27

DC2022-03-0011

Policy Title
Prescribing the Policy for the Mandatory Conduct of the
Competitive Selection Process by the Distribution Utilities
for the Procurement of Power Supply for Their Captive
Market
Amending Certain Provisions and Supplementing
Department Circular No. Dc2022-06-0022 on the
Application Process of New WESM Members
Adopting Amendments to Wholesale Electricity Spot
Market (WESM) Rules, Various Market Manuals and
Promulgation of the Retail Manual on the Procedures
for the Implementation of the Green Energy Option
Program (GEOP)
Adopting Further Amendments to the WESM Rules,
WESM Manual and Retail Manual on Validation Timeline
Adjustment in Metering and Billing
Adopting Further Amendments to Various WESM
Manuals for Improvements to Market Resource
Modeling and Monitoring"
Declaring the Commercial Operation of the Wholesale
Electricity Spot Market (WESM) in the Mindanao Grid
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Market Manual on The
Guidelines Governing the Constitution of The Pem
Board Committees
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manuals on System Security and Reliability Guidelines
(SSRG) and Dispatch Protocol for the Implementation of
the Reserve Market
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manuals for the Implementation of Reserve Market
Adopting further Amendments to the WESM Market
Manual on Billing & Settlement (Provisions on Additional
Compensation Process)
Adopting Further Amendments to the WESM Rules and
Market Manual on Constraint Violation Coefficient and
Pricing Re-runs (CVC-PR) (Harmonization with the ERC
Decision in ERC Case No. 2017-042 RC)
Adopting General Amendments to the WESM Rules and
Various Market Manuals on the Enhancement to the
Market Operator and System Operator Procedures
Adopting Further Amendments to the WESM Manual on
Registration, Suspension, and De-Registration Criteria &
Procedures (RSDCP) (General Enhancements to the
Application Process of New WESM Members)
Adopting Further Amendments to the WESM Rules and
Market Manuals on Dispute Resolution Administration
(DRA)
Supplementing Department Circular No. DC2021-060013 on the Framework Governing the Test and
Commissioning of Generation Facilities for Ensuring
Readiness to Deliver Energy to the Grid or Distribution
Network
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules, Retail Rules, and
Market Manual (Provisions for Audit and Performance
Monitoring)
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and its Market

Date of
Issuance
30 Jun 2023

19 Apr 2023

31 Jan
2023

12 Jan
2023
11 Jan
2023
23 Dec
2022
21 Dec
2022

21 Nov
2022

07 Nov
2022
20 Jun 2022

20 Jun 2022

20 Jun 2022

20 Jun 2022

20 Jun 2022

20 May
2022

25 Mar
2022
22 Mar
2022

POWER DEVELOPMENT PLAN 2023-2050

45

=== pdp-2023-2050-ch1-page-046.pdf ===
No

Reference
Number

28

DC2022-03-0010

29

DC2022-03-0009

30

DC2022-03-0003

31

DC2021-12-0041

32

DC2021-12-0040

33

DC2021-11-0038

34

DC2021-11-0037

35

DC2021-10-0033

36

DC2021-10-0034

37

DC2021-08-0026

38

DC2021-08-0025

39

DC2021-07-0024

40

DC2021-07-0022

41

DC2021-07-0021

Policy Title
Manual on Information Disclosure and Confidentiality
(Exceptions for Confidentiality Undertakings for DOE
and ERC)
Adopting Further Amendments to the Market Manual
on Registration, Suspension and De-Registration Criteria
and Procedures to Clarify Bilateral Contracts
Accounted for in Settlements
Adopting Further Amendments to the WESM Rules and
WESM Registration Manual (Provisions for De-registration
and Cessation of Registration)
Adopting Further Amendments to the WESM Rules its
Market Manual on Billing and Settlement for the
Implementation of Enhancements to WESM Design
Operations (Provisions for Prudential Requirements)
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manual on WESM Compliance Officers (WCO)
Certification and Registration
Amending Certain Provisions of Annex "A" of
Department Circular No. DC2021-06-0015 Entitled
"Declaring the Commercial Operations of Enhanced
Electricity Spot Market (WESM) Design and Providing
Further Policies"
Amending Certain Provisions of Department Circular
No. DC2021-03-0007 entitled "Adopting Further
Amendments to the WESM Rules and Market Manual on
the Management of Net Settlement Surplus
(Harmonization with ERC Resolution No. 07 Series of
2019)”
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manuals on the Rationalization of Billing Timelines
Repealing Section 3 of the DOE Department Circular
No. DC2017-04-0006 Entitled "Adopting Further
Amendments to the WESM Rules and Market Manuals"
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manual on the Procedures for Changes to the WESM
Rules, Retail Rules and Market Manuals
Adopting Further Amendments to The Wholesale
Electricity Spot Market (WESM) Rules and Its Market
Manuals for the Implementation of Enhancements to
WESM Design and Operations (Provisions for Market
Surveillance, Enforcement and Compliance)
Providing Policies for the Adoption of the Wholesale
Electricity Spot Market (WESM) Penalty Manual for the
Implementation of Enhancements to WESM Design and
Operations
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules for the Operation
of the Renewable Energy Market
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Market Manual on the
Constraint Violation Coefficients and Pricing Re-runs
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manuals on Metering for the Implementation of
Enhancements to WESM Design and Operations
(Provisions for Metering Services Provider Performance,
Metering Standards and Site-Specific Loss Adjustments)

Date of
Issuance

17 Mar
2022
17 Mar
2022
01 Mar
2022
21-Dec2021

21-Dec2021

09-Nov2021

09-Nov2021
12-Oct2021
12-Oct2021

30-Jul-2021

30-Jul-2021

09-Jul-2021
25-Jun2021

25-Jun2021

POWER DEVELOPMENT PLAN 2023-2050

46

=== pdp-2023-2050-ch1-page-047.pdf ===
No

Reference
Number

42

DC2021-06-0013

43

DC2021-06-0012

44

DC2021-03-0009

45

DC2021-03-0008

46

DC2021-03-0007

47

DC2021-03-0006

48

DC2021-03-0005

49

DC2021-03-0004

50

DC2021-02-0002

51

DC2021-05-0010

52

DC2020-10-0021

53

DC2020-10-0020

54

DC2020-10-0019

Policy Title
Adopting a General Framework Governing the Test and
Commissioning of New Generation Facilities for Ensuring
Readiness to Deliver Energy to the Grid or Distribution
Network
Adopting Further Amendments to the WESM Rules,
Retail Rules and Various Market Manuals for the
implementation of Enhancements to WESM Design and
Operations (Provisions to Promote Participation in the
Retail Competition
Adopting a General Framework Governing the
Operationalization of the Reserve Market in the
Wholesale Electricity Spot Market and Providing Further
Policies to Supplement DC2019-12-0018
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manuals for the Implementation of Policy and
Framework Governing the Operations of Embedded
Generators
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manuals on the Management of Net Settlement Surplus
(Harmonization with the Energy Regulatory Commission
Resolution No. 07, Series of 2019
Adopting Further Amendments to the Wholesale
Electricity Spot (WESM) Market Manual on Dispatch
Protocol for the Implementation of Enhancements to
WESM Design and Operations (Provision for Must-Run
Unit)
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Market Manual on Load
Forecasting Methodology for the Implementation of
Enhancements to WESM Design and Operations
(Provisions for the Load Distribution Factors)
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manual on Procedures for the Monitoring of Forecast
Accuracy Standards for Must Dispatch Generating Units
for the Implementation of Enhancements to WESM
Design and Operations
Adopting the Wholesale Electricity Spot Market (WESM)
Industry Code of Ethics
Adopting Further Amendments to the WESM Rules and
Market Manual on Protocol for Central Scheduling and
Dispatch of Energy and Contracted Reserves for the
Effective Implementation of Enhanced WESM Design
and Operations
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules (Provisions for the
Implementation of Independent Market Operator)
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Market Manual on
Dispatch Protocol for the Implementation of
Enhancements to WESM Design and Operations
(Provisions for the WESM Timetable)
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Manuals on Registration,
Suspension and De-registration, and Market Network
Model Development and Maintenance for the
Implementation of Enhancements to WESM Design and
Operations

Date of
Issuance
03-Jun2021

03-Jun2021

17-Mar2021
16-Mar2021

16-Mar2021

16-Mar2021

16-Mar2021

16-Mar2021

24-Feb2021
15-Dec2020

22-Oct2020

06-Oct2020

06-Oct2020

POWER DEVELOPMENT PLAN 2023-2050

47

=== pdp-2023-2050-ch1-page-048.pdf ===
No

Reference
Number

55

DC2020-06-0014

56

DC2020-06-0013

57

DC2020-05-0011

58

Republic Act
No. 11646

59

Executive
Order 156

60

DO2023-04-0012

61

DC2022-05-0017

62

DO2022-02-0002

63

DC2022-05-0016

64

DC2021-11-0039

65

DC2023-04-0008

Policy Title
(Provisions for the New Load Facility of a Registered
WESM Member)
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manual on Billing and Settlement for the
Implementation of Enhancements to WESM Design and
Operations (Provisions for Prudential Requirements)
Adopting Further Amendments to the Wholesale
Electricity Spot Market (WESM) Rules and Market
Manual on Registration, Suspension and De-Registration
Criteria and Procedures for the Implementation of
Enhancements to WESM Design and the
Implementation of Enhancements to WESM Design and
Operations (Provisions for Registration of New Facility
and Harmonization with Republic Act No. 11234 entitled
"An Act Establishing the Energy Virtual One-Stop Shop")
Supplementing Department Circular No. DC2019-120018 by Including the National Transmission Corporation
in the Membership of the Ancillary Services - Technical
Working Group
Total Electrification (5)
An Act Promoting the Use of Microgrid Systems to
Accelerate the Total Electrification of Unserved and
Underserved Areas Nationwide
Instituting Measures to Ensure Consistent and Reliable
Electricity Service in Inadequately Served Areas,
Improve Performance of Ineffective Distribution Utilities,
and Achieve Total Electrification of the Country
Creation of the Special Bids and Awards Committee
Pursuant to Sections 10 and 11 of Department Circular
No. DC2022-05-0017
Rules and Regulations to Implement RA No. 11646
(MICROGRID SYSTEMS ACT)
Implementing Framework of Executive Order No. 156 s.
2021
Off-Grid Development (2)
Adopting and Integrating the Policies and Programs for
the Graduation and Rationalization of the Universal
Charge for Missionary Electrification Subsidy Pursuant to
Department Circular No. Dc2019-01-0001
Mandating the National Transmission Corporation as
Small Grid System Operator in Specific Off-Grid Areas
Overarching Policies and Programs (1)
Prescribing the Policy for Energy Storage System in the
Electric Power Industry

Date of
Issuance

02-Jun2020

01-Jun2020

11-May2020

21 Jan
2022

9 Dec 2021

12 Apr 2023
24 May
2022
21 Feb
2022

24 May
2022
09 Nov
2021
20 Mar
2023

POWER DEVELOPMENT PLAN 2023-2050

48

