=== dc2025-04-0005-pages-41.ppm === li. Safety and Quality Certificate of the materials to be used on the construction, facilities, and equipment. Environmental (land, air, water and people) impact identification, prevention and mitigation assessment report of the proposed infrastructure and processes on the proposed site consistent with the Philippine Environmental Impact Statement System (EISS) Law and its implementing rules; . Geologic, oceanographic, seismic, atmospheric, and security hazard identification, prevention and mitigation assessment report such as but not limited to: i. Offshore Wind and Wave Study; ii. Wave Transformation Modeling Study; iii. Hydrodynamic (Flow) Modeling Study; iv. Navigational Simulations (Fast-time); v. Simplified Downtime Assessment; Tsunami Modeling Study; Vi. i. Typhoon Modeling Study; V viii. Quantitative Risk Assessment; and ix. Other related studies. . Health, Safety, Security and Environment (HSSE) Risk Assessment and Management Plan (Construction and Equipment Installation Phase); Submission of HSSE management systems, management and employee structure, manpower complement, qualification and competency/training development program and _ mitigation plans to address the risks at As Low As Reasonably Practicable (ALARP) levels in the following areas: i. Environmental Risk Assessment and Management Plan Consistent with the Philippine environmental regulations and/or International Standards, a comprehensive assessment and management program shall be established to address project-specific risks and potential impacts on the environment. Page 12 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-42.ppm === Potential environmental issues associated with the construction and installation of LNG equipment which shall include, but are not limited to the following: 1. Threats to aquatic and shoreline environments; 2. Hazardous material management; 3. Wastewater; 4. Air emissions; 5. Waste management; and 6. Noise i. Occupational Health and Safety Risk Assessment and Management Plan Occupational health and safety issues shall be part of a comprehensive hazard identification, risk assessment and management study which include but is not limited to Hazard Identification (HAZID) study, Hazard and Operability (HAZOP) study, and qualitative and quantitative risk assessments shall be conducted as appropriate. The results of these studies shall be used as input to the Health and Safety Plans (HASP) specific to construction and equipment installation phases. The HASP shall include, but is not limited to, environmental and safety processes, and safe systems of work/ procedures which shall be prepared, communicated and implemented to manage the risks. Occupational health and safety issues associated with the construction and installation of DNG Facilities which shall include, but are not limited to, the following: 1. Fire and explosion; 2. Roll-over,; 3. Contact with cold surfaces; 4. Chemical hazards; 5. Confined spaces; 6. Working at heights; 7. Lifting and rigging; 8. Excavation; and Page 13 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-43.ppm === 9. Other construction and installation related hazards. iii. Facility Security Risk Assessment and Management Plan Facility security assessment shall be conducted to identify threats which include but is not limited to criminal and terrorist. The vulnerability of the facilityiocation against identified threats shall likewise be assessed and corresponding plans shall be put in place. iv. Disaster/Emergency Preparedness and Response Plan Based on the HSSE assessment, a plan shall be put in place to prevent, mitigate, respond to, and maintain continuity from an incident that threatens life, property, operations and the environment. Incident as defined is anything that has the potential to cause interruption, disruption, loss, emergency, crisis, disaster or catastrophe. v. Other areas of concern that the Permit Holder may deem necessary. 3. Financial Documentation. The Permit Holder shall submit the following: a. Work program and budget indicating the following: i. Permitting activities; li. Construction, installation, testing and commissioning; and iii. Other related activities. b. Financial documents Submit the updated financial documents required in Section 7 (b) (i) (3) (b). c. Financial evaluation criteria The working capital as computed based on the submitted financial documentation and the support funding shall be able to support one hundred percent (100%) of the proposed work program. Page 14 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-44.ppm === iii. Issuance of POM. 1. Legal Documentation. Updated permitting requirements of other government agencies for the operation of the facility which shall include the following: a. d. e. Applicable regulatory permits from the DENR which include the ECC; . Business Permits for Operation from the LGU: Registration and Permit to Operate from the DOLE; Fire Safety Inspection Certificate from the BFP: and Other permits as may be required by law or rules. 2. Technical Documentation. a. Completion requirements: i. Mechanical completion certificate issued by the EPC contractor and concurred to by the Permit Holder; li. Final testing and commissioning certificate issued by the EPC contractor and concurred to by the Permit Holder; and Final project completion acceptance certificate issued by the EPC contractor and concurred to by the Permit Holder. . Final plot plans and list of key buildings, components, systems, access roads, safety zones and distances; . Description of the functions of key buildings, components, systems, access roads, safety zones and distances: . Operational process flow with diagram: Description of operational process flow with diagram of buildings, components, and systems for operation and maintenance for DOE guidance and reference; HSSE Risk Assessment and Management Plan (Operation Phase); Submission of HSSE management systems, management and employee structure, manpower complement, qualification and competency / training development program and mitigation plans to address the risks at ALARP levels in the following areas: Page 15 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-45.ppm === Environmental Risk Assessment and Management Plan; Consistent with the Philippine environmental regulations and/or International Standard, a comprehensive assessment and management program shall be established to address project-specific risks and potential impacts to the environment. Potential environmental issues associated with the operation and maintenance of LNG equipment which shall include but are not limited to the following: 1. Threats to aquatic and shoreline environments; 2. Hazardous material management; 3. Wastewater; 4. Air emissions; 5. Waste management; and 6. Noise. i. Occupational Health and Safety Risk Assessment and Management Plan; Occupational health and safety issues shall be part of a comprehensive hazard identification, risk assessment and management study which include but is not limited to HAZID, HAZOP, and qualitative and quantitative risk assessments shall be conducted as appropriate. The results of these studies shall be used as input to the HASP specific to operation and maintenance activities. The HASP shall include but is not limited to environmental and safety processes, and safe systems of work/ procedures which shall be prepared, communicated and implemented to manage the risks. Occupational health and safety issues associated with the operation and maintenance of DNG Facilities which shall include but are not limited to the following: 1. Fire and explosion; 2. Roll-over; 3. Contact with cold surfaces; 4. Chemical hazards; Page 16 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-46.ppm === 5. Confined spaces; oO? . Working at heights; ~ . Lifting and rigging; and 8. Other operation and maintenance related hazards iii. Facility Security Risk Assessment and Management Plan; Facility security assessment shall be conducted to identify threats which include but is not limited to criminal and terrorist. The vulnerability of the facility/ location against identified threats shall likewise be assessed and corresponding plans shall be put in place. iv. Disaster/Emergency Preparedness and Response Plan; Based on the HSSE assessment, a plan shall be put in place to prevent, mitigate, respond to, and maintain continuity from an incident that threatens life, property, operations and the environment which shall be developed in close coordination with the community, local government unit and other stakeholders of the location where they operate. Incident as defined is anything that has the potential to cause interruption, disruption, loss, emergency, crisis, disaster or catastrophe. v. Corporate Social Responsibility Program; and These programs are intended to improve the well-being of the community in the locality where the project is located on areas such as health, education, livelihood and other programs that promote improvement of the lives and welfare of the community. vi. Other areas of concern that the Permit Holder may deem necessary. f. Description and schedule of maintenance activities 3. Financial Documentation. a. Proposed operation and maintenance work program and budget for the first year of operation; and b. Financial Documents: Submit the updated financial documents required in Section 7 (b) (i) (3) (b). Page 17 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-47.ppm === iv. V. c. Financial evaluation criteria. The working capital as computed based on the submitted financial documentation and the support funding shall be able to support one hundred percent (100%) of the proposed operation and maintenance for the first year of operation. Special Permit to Allow Use of Facility. 1. Pursuant to Section 41 of the IRR, Own-Use Permit Holder shall utilize its entire capacity exclusively for own-use and shall not be allowed to enter into TPA arrangements, unless approved by the DOE. Moreover, pursuant to Section 42 of the IRR, a TPA Permit Holder shall utilize its entire capacity exclusively for TPA and shall not be allowed to utilize any such capacity for own-use, unless approved by the DOE. To obtain DOE approval, the Permit Holder shall submit the following: a. An application letter addressed to DNG-REC Chair; b. A feasibility study showing that the utilization of the PDNGI facility is necessary and the most feasible to address supply of natural gas for Own-Use or TPA, whichever is applicable; c. Terms and conditions of offer for TPA and terms and conditions on use in case of Own-Use; d. A Certification issued by the PCC that the proposed Own- Use or TPA will not result in anti-competitive behavior; and e. Aclearance of no pending administrative penalty issued by the DOE-Office of the Legal Services. . An Own-Use or TPA Permit Holder may be allowed by DOE to enter into TPA or Own-Use arrangements, respectively, to ensure availability of natural gas supply, energy security and consumer welfare. No Special Permit shall be issued if it will result in anti- competitive behavior. Issuance of PTE, PTR or PTM. 1. Legal Documentation. a. Amended regulatory permits from the DENR, as applicable; b. Building permit from the LGU, as applicable; Page 18 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-48.ppm === c. Registration and Permit to Operate from the DOLE; d. Fire Safety Evaluation Clearance from the BFP; and e. Other permits as may be required by law or rules. 2. Technical Documentation. a. Final project description; and b. Execution program. 3. Financial Documentation. The Permit Holder shall submit the following: a. Work program.and budget indicating the following: i. Permitting activities; ii. Construction, installation, testing and commissioning; and iii. Other construction related activities. b. Financial Documents. Submit the updated financial documents required in Section 7 (b) (i) (3) (b). c. Financial evaluation criteria The working capital as computed based on the submitted financial documentation and the support funding shall be able to support one hundred percent (100%) of the proposed work program. vi. Decommissioning and Abandonment. 1. Legal Documentation. Certified true copy of regulatory permits required from government agencies. 2. Technical Documentation. Submission of Decommissioning and Abandonment Plan: a. Description of the proposed decommissioning and abandonment activities with timeline and budgetary requirements; Page 19 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-49.ppm === b. Work activities timeline and budgetary requirements; c. HSSE Risk Assessment and Management Plan i. Environmental Risk Assessment and Management Plan; ii. Occupational Health and Safety Risk Assessment and Management Plan; iii. Facility Security Risk Assessment and Management Plan; iv. Disaster/ Emergency Preparedness and Response Plan; and v. Other areas of concern that the Permit Holder may deem necessary. d. List of Philippine or Internationally Accepted Standards to be utilized during implementation e. Description of the project management team: i. Complete name; li. Nationality; ili. Position; iv. Qualification; v. Specialization/expertise; vi. Experience; vii. Role/responsibilities; and viii. Certifications/trainings; 3. Financial Documentation. a. Certified true copy of the latest available decommissioning fund. b. Financial evaluation criteria The available decommissioning fund shall be able to support one hundred percent (100%) of the proposed work program. Page 20 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-50.ppm === Vii. Vili. Extension of Permit Validity. 1. Application letter from the Permit Holder addressed to the DNG- REC Chair; 2. Executive report indicating the following: a. Grounds for extension and proof of their existence; b. Chronological history of the delay; c. Assessment proving that the ground for extension caused the delay in accomplishing the work program; d. Description of the methodology/technique used to compute the delay and the computation of the actual delay in number of days; e. Proposed updated work program, budget, and baseline schedule/Gantt chart; and f. Other relevant information or supporting documents 3. Financial Documents: Submit the updated financial documents required in Section 7 (b) (i) (3) (b). 4. Financial evaluation criteria The working capital as computed based on the submitted financial documentation and the support funding shall be able to support one hundred percent (100%) of the proposed updated work program. Assignment or Transfer of Permit or Change of Control. 1. Legal Documentation — Assignment of Transfer of Permit. a. Application letter from the Permit Holder addressed to the DNG- REC Chair; b. Certified true copy of the assignment agreement; c. Original copy of the Secretary's Certificate showing authority of the Permit Holder and assignee’s representatives to apply, negotiate, sign, and execute documents in relation to the application; d. Original copy of the Permit Holder’s Secretary's certificate attesting the issuance of a board resolution authorizing the Page 21 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-51.ppm === assignment or transfer of the Permit attached with the certified true copy of the board resolution; Original copy of the assignee’s Secretary’s certificate attesting the issuance of a board resolution authorizing the assumption of the Permit including all the responsibilities and obligations therein attached with the certified true copy of the board resolution; Business profile of the assignee; Certified true copy of Securities and Exchange Commission registration, Articles of Incorporation and By-Laws or their equivalent for foreign - registered assignee. The corporate purpose of the assignee shall include authority to own and operate the PDNGI facility subject of assumption; and Certified true copy of the latest General Information Sheet (GIS) of the assignee stamped-received by the SEC within twelve (12) months from the date of the filing of application. . Legal Documentation — Change of Control. a. Application letter from the Permit Holder addressed to the DNG- REC Chair requesting approval of a planned sale of shares that will result in a change of control. Control under the Philippine Natural Gas Industry Development Act shall mean the power to direct or cause the direction of management policies as an inherent part of decision-making power; Original copy of the Secretary’s Certificate showing authority of the Permit Holder and buyer’s representatives to apply, negotiate, sign, and execute documents in relation to the application; Business profile of the buyer; Certified true copy of Securities and Exchange Commission registration, Articles of Incorporation and By-Laws or their equivalent for foreign - registered buyer. The corporate purpose of the buyer shall include authority to own and operate the PDNGI! facility. subject of assumption; and Certified true copy of the latest General Information Sheet (GIS) of the buyer stamped-received by the SEC within twelve (12) months from the date of the filing of application. Page 22 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-52.ppm === 3. Technical Documentation. a. Profile of Assignee or Buyer. i. Legal identity and business operation of the assignee or buyer; ii. Executive briefer describing the ability and competence of the assignee to take over the Permit or the buyer to assume control of the Permit Holder: iii. List of executive officers and their professional qualification and experience; iv. List of project management team and their professional qualification and experience; v. Organizational chart of the executive officers and the project management team. Business direction and strategy; and vi. vii. Major accomplishments in the PDNGI Industry. b. Profile of the Assignee or Buyer’s Affiliates and joint ventures. i. Legal identity and business operation of the assignee or buyer’s Affiliates and joint ventures; ii. List of executive officers and their professional qualification and experience; List of project management team and their professional qualification and experience; iv. Organizational chart of the executive officers and the project management team; v. Specific expertise of the Affiliate or joint venture that will be contributed to the project; and Major accomplishments of the Affiliate or joint venture on the specific expertise to be contributed to the project. Vi. c. Applicant and its Affiliates and joint venture disclosure of any pending or finally determined major safety or environmental enforcement actions by relevant authorities; and d. Other information that the Applicant may deem necessary to support its application or as may be required by the DNG-REC. Page 23 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-53.ppm === 4, Financial Documentation cf the Assignee or Buyer. a. Work program and budget for the remaining work program; b. Financial Documents: Submit the financial documents required in Section 7 (b) (i) (3) (b). c. Financial evaluation criteria The working capital as computed based on the submitted financial documentation and the support funding shall be able to support one hundred percent (100%) of the remaining work program. Section 8. Evaluation Criteria. To meet the objectives of the PDNGI development, the DOE shail approve the Permits under the following considerations: a. The proposed project is consistent with the declaration of policies of the Philippine Natural Gas Industry Development Act; b. The Applicant: 1. Has submitted the complete documentary requirements and paid the applicable application fee; 2. Has demonstrated technical competence to deliver the construction and/or operation of the project; 3. Has demonstrated financial competence to meet the funding requirements; and 4. Has demonstrated that the proposed project shall not result in any Anti- Competitive Behavior. Section 9. Operational Meeting and Workshops. The Permit Holder shall participate in regular operational meetings and special workshops with the DNG-REC for the development, issuance, and review of plans, protocols, standards, and codes applicable to the PDNGI. Section 10. Progress Report and Validation. The Permit Holder shall submit the progress reports prescribed by the Guidelines for Submission of Reportorial Requirements subject to onsite validation by the DNG- REC in coordination with the Inter- Agency Health Safety Security and Environment Inspection and Monitoring Team. Page 24 of 24 Guidelines for Issuance of Permits === dc2025-04-0005-pages-54.ppm === ANNEX A-1 INFORMATION SHEET REGISTRATION 4. NAME OF 7. FAX NUMBER/S 11. NAME OF PARENT COMPANY/IES 12. NAME OF PARTICULARS APPLICANT/PERMIT HOLDER 2. ADDRESS La sC‘“CSSCOC*CSCz AUTHORIZED REPRESENTATIVE 5. POSITION 9. WEBSITE ADDRESS 10. SUMMARY DESCRIPTION OF AFFILIATE/S Certification | certify under penalty of law, based on information and belief formed after reasonable inquiry, the 3.COUNTRY OF 6. TELEPHONE NUMBER/S APPLICATION: statements and information contained in these documents are true, accurate and complete. Name and Signature of Authorized Representative: === dc2025-04-0005-pages-55.ppm === ANNEX B GUIDELINES FOR ISSUANCE OF ACCREDITATION AND ACKNOWLEDGEMENT Section 1. Coverage. These guidelines shall govern the Accreditation of Participants and Acknowledgements to Import and Export Liquefied Natural Gas under the Philippine Natural Gas Industry Development Act. a. Participant. A Philippine or foreign- registered natural or juridical person interested to engage in the trade of natural gas. b. Types of Participant. Supplier - refers to a Participant, authorized by the DOE, to engage in the procurement or production and selling of indigenous or imported liquefied natural gas (LNG) to gas buyers in the Philippines or abroad: Aggregator - refers to a Participant, authorized by the DOE, to engage in the procurement of indigenous natural gas, combining it with imported LNG, and selling the aggregated gas to gas buyers in the Philippines or abroad: Bunker Trader - refers to a Participant, authorized by the DOE, to engage in the sale of natural gas as fuel of domestic or foreign marine vessels; and iv. Reseller - refers to a Participant, authorized by the DOE, to engage in the procurement of natural gas from a Supplier or Aggregator and reselling it to gas buyers in the Philippines. Section 2. Accreditation Requirements. a. General Requirement. Instruction. 1. AnApplicant shall submit its requirements in English language, and for foreign-registered must be duly authenticated by the embassy which has operational coverage of the Philippines. 2. Application must be submitted in three (3) complete sets of hard copies, and digital copy in PDF format on a USB drive or email at oimb.ngmd@doe.gov.ph. The recommended format includes the use Page 1 of 6 Guidelines for Issuance of Accreditation and Acknowledgement === dc2025-04-0005-pages-56.ppm === of the Times New Roman font in size 12, single-line spacing, and figures in A4 size. 3. A non-refundable processing fee, in accordance with the latest Department of Energy (DOE) approved schedule of fees and charges, shall be paid by the Applicant upon receipt of order of payment from the Natural Gas Management Division - Oil Industry Management Bureau of the DOE. Payment may be made in cash, manager/company check, or by wire/bank transfer payable to the Philippine Department of Energy. All payments should be net of all applicable foreign and local bank financial charges. An application is not considered accepted by the DNG-REC until the processing fee is fully paid. . The application shall be sent by courier or registered mail, or hand- delivered and stamped-received by the DOE Records Division. It shall be addressed to: The Chair Downstream Natural Gas-Review and Evaluation Committee (DNG- REC) Department of Energy Energy Center, Rizal Drive, Bonifacio Global City, Taguig City Metro Manila, 1632 Philippines ii, Submission of an application letter (Annex B-1) indicating the following information: 1. Company details — business name, address, telephone number/s, email address; . Contact person and contact details; and . Type of Accreditation applied for: a. Supplier b. Aggregator c. Reseller d. Bunker Trader Page 2 of 6 Guidelines for issuance of Accreditation and Acknowledgement === dc2025-04-0005-pages-57.ppm === b. Specific Requirements. Profile of the Applicant. Executive briefer indicating the following: 1. 2. 5. Legal identity; Business operation; Description of the source and estimate of natural gas (indigenous and/or imported liquefied natural gas) volume planned to be traded in one (1) year and its corresponding budgetary requirements; Description and location of the facility to be used for storage, regasification, or production, and sale of natural gas; and Description of prospective and/or existing buyers of natural gas. ii. Profile of the Applicant’s Affiliates and/or joint venture members engaged in the natural gas industry. Executive briefer for each Affiliate and/or joint venture member indicating the following information: 1, 2. 3. 4. Legal identity; Business operation; Major accomplishments in natural gas industry; and Organizational chart of the executive officers and the project management team. Applicant’s supporting documents. Certified true copies of the following: 1. Securities and Exchange Commission registration, Articles of Incorporation and By-Laws or their equivalent for foreign - registered Applicant. The corporate purpose of the Applicant shall include authority to trade natural gas; Latest General Information Sheet (GIS) of the Applicant stamped- received by SEC within twelve (12) months from date of the filing of application; Page 3 of 6 Guidelines for Issuance of Accreditation and Acknowledgement === dc2025-04-0005-pages-58.ppm === 9. . Secretary's Certificate showing authority of the Applicant's representative to apply, negotiate, sign, and execute documents in relation to the application; . Philippine Business Permit; . Philippine Bureau of Internal Revenue (BIR) Registration; . Certificate of Accreditation as Importer from the Philippine Bureau of Customs (BOC), if importing LNG; . Proof of the right to utilize the facility to be used for storage, regasification or production, and sale of natural gas, if applicable; . Audited Financial Statements for the last two (2) years from the date of the Application and the latest Unaudited FS duly signed by the President and/or Chief Finance Officer of the company if the Audited FS is more than six (6) months at the time of application filing; Proof of payment of applicable fee; and 10.Other supporting and relevant documents that the law or rules may require. iv. Criteria. 1. Submission of complete documentary requirements including payment of application fee; . Must be a Philippine or foreign registered natural or juridical person authorized to trade natural gas; . The working capital as computed based on the submitted financial statements shall be able to support one hundred percent (100%) of the budgetary requirements of the planned natural gas volume to be traded for one (1) year; . Must be authorized to utilize the capacity of the facility to be used for production, storage, regasification, and sale of natural gas; and Other requirements as may be prescribed by law or DOE rules and regulations. c. Validity. The Accreditation certificate shall be valid for a period of five (5) years from the date of issuance, unless earlier revoked or canceled by Department of Energy, and may be renewed every five (5) years, subject to compliance with Page 4 of 6 Guidelines for Issuance of Accreditation and Acknowledgement === dc2025-04-0005-pages-59.ppm === prevailing laws and regulations. Application for renewal shall be filed not later than thirty (30) working days prior to the expiration of the Accreditation certificate. Section 3. Acknowledgment. Accredited Participants shall file the applicable notice to Department of Energy- Oil Industry Management Bureau (DOE-OIMB) prior to every importation and exportation of Liquefied Natural Gas (LNG) for the issuance of Acknowledgment to Import LNG (ATI-LNG) or Acknowledgment to Export LNG (ATE-LNG): a. Notice to Import. Submit the notice to import to OIMB (Annex B-2) not later than seven (7) working days prior to loading of every importation: 1. Details. a. Business Name of the Participant and Accreditation Number; b. Quantity; c. Product Specifications; d. Estimated date of loading and arrival; e. Supplier; f. Estimated FOB price, freight, insurance cost, and other importation costs; g. Vessel name and voyage number; and h. Country of origin and destination, with both ports of loading and unloading. 2. Supporting Document. a. Pro-forma Invoice b. Post-lmportation Notice. Submit the post-importation notice to OIMB (Annex B-3) not later than twenty (20) working days after unloading of every importation with the following supporting documents: 1. Commercial invoice; Page 5 of 6 Guidelines for issuance of Accreditation and Acknowledgement === dc2025-04-0005-pages-60.ppm === 5. Import bill of lading; Certificate of quality; Final import entry declaration; and Statement of Settlement of Duties and Taxes (SSDT). c. Notice to Export. Submit the notice to export to OIMB (Annex B-4) not later than seven (7) working days prior to loading of every exportation: 1. Details. a. b. f. g. Business Name of the Participant and Accreditation Number; Quantity; . Estimated date of loading and arrival: . Business Name of Buyer; . Estimated FOB price, freight, insurance cost and other exportation costs; Vessel name and voyage number); and Country of destination, with both ports of loading and unloading. 2. Supporting Document. a. Pro-forma Invoice d. Post-Exportation Notice. Submit the post-exportation notice to OIMB (Annex B-5) not later than twenty (20) working days after loading of every exportation with the following supporting documents: 1. Commercial invoice: 2. Export bill of lading; and 3. Certificate of Quality. Page 6 of 6 Guidelines for issuance of Accreditation and Acknowledgement