=== dc2023-07-0023-pages-01.ppm === Republic of the Philippines DEPARTMENT OF ENERGY (Kagawaran ng Enerhiya) DEPARTMENT CIRCULAR NO. 0C2023-07- 0023 » ADOPTING FURTHER AMENDMENTS TO THE WHOLESALE ELECTRICITY SPOT MARKET (WESM) RULES AND MARKET MANUALS (Provisions on Penalty Framework for Test and Commissioning) WHEREAS, Sections 30 and 37(f) of the Republic Act (RA) No. 9136 or the “Electric Power Industry Reform Act of 2001” (EPIRA) mandate the Department of Energy (DOE) to supervise the restructuring of the electricity industry and in addition thereto, a) ensure the reliability, quality, and security of supply of electric power; b) jointly with the electric power industry participants, establish the wholesale electricity spot market and formulate the detailed rules governing the operations thereof; and c) monitor private sector activities relative to energy projects to attain the goals of the restructuring, privatization, and modernization of the electric power sector as provided for under existing laws; WHEREAS, on 28 June 2002, the DOE, with the endorsement of the electric power industry participants, promulgated the WESM Rules through Department Circular (DC) No. DC2002-06-0003; WHEREAS, any changes, amendments, and modifications to the WESM Rules, Retail Rules, and their Market Manuals shall be undertaken in accordance with the provisions of Chapter 8 of the WESM Rules; WHEREAS, on 03 June 2021, the DOE promulgated DC No. DC2021-06-0013, titled “Adopting a General Framework Governing the Test and Commissioning of Generation Facilities for Ensuring Readiness to Deliver Energy to the Grid or Distribution Network’, which provided clear-cut procedures and timelines on the conduct of test and commissioning; WHEREAS, Section 9 of said DC mandates the Governance Arm to propose changes to the WESM Rules and relevant Market Manuals in accordance with the enforcement and compliance with the policy provided in the subject Circular and to recommend to the DOE and the Energy Regulatory Commission (ERC) the possible sanctions and other measures that will promote compliance of the concerned stakeholders with the policies stated in the same Circular; WHEREAS, on 05 May 2022, the Governance Arm or the Philippine Electricity Market Corporation (PEMC), submitted to the Rules Change Committee (RCC) its proposed amendments to the WESM Manuals regarding Penalty Framework for Test and Commissioning which sought to provide the penalty mechanism or omission of a Trading Participant with facility or plant whose test and commissioning period has expired; Energy Center, Rizal Drive, Bonifacio Global City, Taguig City, Metro Manila, Philippines 1632 Tel. No. (Trunkline) (632) 8479-2900 Website: hip: www aloe gov ph: Email: infocenteradoe.yev.ph === dc2023-07-0023-pages-02.ppm === WHEREAS, on 16 June 2022, the DOE issued DC No. DC2022-05-0015 to supplement DC No, DC2021-06-0013, allowing the power plants to continue to inject energy to the grid after successful completion of the test and commissioning process to support the anticipated increase in demand, particularly during the summer period; WHEREAS, the RCC, in consultation with the Market Surveillance Committee (MSC) and Compliance Committee (CC), deliberated on the proposal to consider the comments received from interested parties and harmonizing with the DOE DC No. DC2022-05-0015, it was subsequently finalized and submitted to the Philippine Electricity Market (PEM) Board; WHEREAS, in a letter dated 02 December 2022, the PEM Board submitted a proposal for the DOE's final approval, in compliance with Chapter 8 of the WESM Rules; WHEREAS, on 11 January 2023, the proposal was posted on the DOE website to solicit comments from the stakeholders and other interested parties; WHEREAS, the DOE, to ensure transparency and consistency with the objectives of the EPIRA and the WESM, conducted the following public consultations on said proposed amendments: Date | Lea Venue | 09 February 2023 Luzon guic | 16 February 2023 | Visayas Cebu Ci | 28 February 2023 Mindanao Davao Ci NOW, THEREFORE, pursuant to its authority and mandate under the EPIRA and its IRR, and after due consideration of the inputs and recommendations from various stakeholders, the DOE hereby issues, adopts, and promulgates the following: Section 1. Amendments to the WESM Rules. The following provisions of the WESM Rules are hereby updated as follows: 3.5.5 Generation Offers and Data XXX XXX XXX 3.5.5.5 Each Non-Scheduled Generation Company shall submit a standing nomination of loading levels for each of its non-scheduled generating units for each dispatch interval in each trading day of the week in accordance with the timetable. The standing nomination of loading /eveils shall apply until revised or updated by the Non-Scheduled Generation Company, 3.5.5.6 Generation Companies shall provide to the Market Operator and the System Operator the standing projected outputs in respect of their must dispatch generating units and priority dispatch generating units for each dispatch interval in each trading day of the week in accordance with the relevant Market Manuals and provisions of the Grid Code. The standing De eee Oe ee Adopting Further Amendments to the Wholesale Electricity Spot Market (WESM) Rules and Market Manuals (Provisions on Penalty Framework for Test and Commissioning) Page 2 of 11 === dc2023-07-0023-pages-03.ppm === 3.5.5.7 3.5.5.8 3.5.5.9 3.5.5.10 3,.5.5.11 3.5.5.12 3.5,5.13 projected outputs shall apply until revised or updated by the relevant Generation Company. A Trading Participant who fails to submit the projected outputs for its must dispatch generating unit or priority dispatch generating unit as provided under Clause 3,5.5.6 may be liable for the sanctions imposed under Clause 7.2. Each Generation Company shall submit check data to be used by the Market Operator, in accordance with the relevant Market Manuals, to assist in determining the validity of any projected output submitted in respect of a must dispatch generating unit or a priority dispatch generating unit under Clause 3.5.5.6. Must dispatch generating units shall comply with the forecast accuracy standards, in respect of their projected outputs submitted under Clause 3.5.5.6, consistent with the Grid Code. The Enforcement and Compliance Office shall evaiuate annually the forecast accuracy standards complied with by must dispatch generating units in accordance with Clause 3.5.5.9. A Trading Participant who fails to meet the requisite forecast accuracy standards set out in accordance with Clause 3.5.5.9 in respect of projected outputs for a must dispatch generating unit submitted under Clause 3.5.5.6 may be liable for the sanctions imposed under Clause 7.2. The Enforcement and Compliance Office shall report to the PEM Board and the DOE the monthly and annual compliance of each must dispatch generating unit with the forecast accuracy standards in respect of its projected outputs. Each Generation Company that has secured a Final Certificate of Approval to Connect but with pending issuance of Certificate of Compliance from the ERC shall submit, as applicable: a) Standing nomination of the loading levels for each of its scheduled generating units, battery energy storage systems, and pumped-siorage units; or b) Projected outputs in respect of its must dispatch generating units and priority dispatch generating units. The Generation Company shall submit its nomination of the /oading levels or projected outputs for each dispatch interval on each trading day of the Adapting Further Amendments to the Wholesale Electricity Spot Market (WESM) Rules and Market Manuals (Provisions on Penalty Framework for Test and Commissioning) Page 3 of 11 === dc2023-07-0023-pages-04.ppm === week in accordance with the timetable. The standing nomination of the loading levels and projected outputs shall apply until revised or updated by the Generation Company. 3.5.5.14 A Generation Company that has secured a Final Certificate of Approval to Connect but with pending issuance of the Certificate of Compliance from the ERC for its must dispatch generating unit shall comply with the forecast accuracy standards in respect of its projected outputs which shall be evaluated by the Enforcement and Compliance Office, in accordance with Clauses 3.5.5.8 to 3.5.5.12. XXX XXX XXX 3.8.4 Dispatched Trading Participants XXX XXX XXX 3.8.4.5 Agenerating unit that has secured a Final Certificate of Approval to Connect but with pending issuance of the Certificate of Compliance from the ERC shall likewise comply with the obligations, as applicable, of dispatched Trading Participants prescribed in Clause 3.8.4. XXX XXX = - XXX 3.8.6 Sanctions of Trading Participants Any Trading Participant, including those that have secured a Final Certificate of Approval to Connect but with pending issuance of the Certificate of Compliance from the ERC, that (a) does not comply with the dispatch conformance standards or (b) consistently fails to use its reasonable endeavors to comply with the dispatch instructions issued by the System Operator under Clauses 3.8.3, 6.3, and 6.5, shall be liable for sanctions imposed under Clause 7.2. XXX XXX XXX Section 2. Amendments to the Market Manual on Registration, Suspension, and De-registration Criteria and Procedures. The following provisions of the Market Manual on Registration, Suspension, and De-registration Criteria and Procedures are hereby amended as follows: 2.5.4.4 Generation Registered Capacities A Generation Company shall include in its application for registration the maximum stable load (Pmax), the minimum stable load (Pmin), the ramp up rate, and the ramp down rate of each generating unit or aggregated generating units that are included in its application. For Generation Companies applying for the Test and Commissioning registration, the information on the generating unit parameters provided to the Market Opereior shall Adopting Further Amendments to the Wholesale Electricity Spot Market (WESM) Rules and Market Manuals (Provisions on Penalty Framework for Test and Commissioning) Page 4 of 11 === dc2023-07-0023-pages-05.ppm === be consistent with that contained in the ERC Form 7 (General Piant Description) duly received by the ERC. For Generation Companies applying for the Commercial Operations registration, the information on the generating unit parameters provided to the Market Operator shall be consistent with that contained in the Certificate of Compliance or the Provisional Authority to Operate issued by the ERC, as well as the submissions made to the ERC in relation to the issuance thereof. If the generating unit is a battery energy storage system, the Generation Company shall include the generating unit's energy storage efficiency and the maximum storage capacity in its application. If the generating unit is a pumped-storage unit, the Generation Company shall include the generating unit's maximum pump load. XXX XXX XXX 2.5.7.3. Guidelines for the Test and Commissioning Registration XXX XXX XXX j) The Market Operator shall submit a monthly report on the status of the Test and Commissioning of the generating units to the Enforcement and Compliance Office, copy furnished the DOE and ERC, indicating information such as but not limited to: (i) Whether a WESM Member has been duly notified of the impending expiration of its Provisional Certificate of Authority to Connect; (ii) Whether a WESM Member is given a Final Certificate of Authority to Connect, Certificate of Compliance, or the Provisional Authority to Operate, including the effectivity date/s, if such is known to the Market Operator, and (iii) Any relevant information affecting the obligations set forth in paragraphs (a), (d), and (h) of this Section for its appropriate enforcement action. An investigation may likewise be initiated motu proprio by the Enforcement and Compliance Office as may be authorized under Section 7.2.1 of the Enforcement and Compliance Manual. XXX XXX XXX 3.3.1 Registered Capacities and Reserve Capabilities 3.3.1.1. The Trading Participant wishing to change the registered capacities and/or ramp rates of its generating unit/s shall request in writing to the Market Operator. Such changes shall be in accordance with the latest Certificate of Compliance, any ERC-certified document, or the Generating Unit Capability Test issued by NGCP. 3.3.1.2, Request for changes submitted by the Trading Participant, in connection with the registered capacities and/or ramp rates of its generating units, shall be approved by the Market Operator based on the latest Certificate of Adopting Further Amendments to the Wholesale Electricity Spot Market (VVESM) Rules and Market Manuals (Provisions on Penalty Framework for Test and Commissioning) Page 5 of 11 === dc2023-07-0023-pages-06.ppm === Compliance, any ERC-certified document or Generating Unit Capability Test issued by NGCP. 3.3.1.3. The Market Operator shall notify the PEM Board, ERC, and DOE of any changes in the registered capacities and/or ramp rates of the generating units inthe WESM within three (3) working days from the date of the Market Operator's approval of such change in registration. XXX XXX XXX Section 3. Amendments to the Market Manual on Dispatch Protocol. The following provisions of the Market Manual on Dispatch Protocol are hereby updated as follows: 2.1 Definitions XXX XXX XXX 2.1.2 The following words and phrases as used in this Market Manual shall have the following meaning: XXX XXX XXX ff. Self-scheduled nomination. Nominations of loading levels by the Non- Scheduled Generation Companies, projected oufpuis of Generation Companies with must dispatch generating units and priority dispatch generating units, and loading levels or projected outputs of the generating units, as applicable, that has been issued with a Final Certificate of Approval to Connect but with pending issuance of Certificate of Compliance by the ERC. XXX XXX XXX 6.4 Categories of Self-scheduled Nominations, Bids, and Offers 6.4.1. The se/f-scheduled nominations, bids, and offers that can be submitted in the WESM are as follows: XXX XXX = - XXX d. Self-scheduled nominations i. Schedule of Joading /evels (i.e. energy quantities only) for the non- scheduled generating units of the non-scheduled Generation Companies; ii. Projected output (i.e. energy quantities only) of the Generation Companies with must dispatch generating units and priority dispatch generating units; Adopting Further Amendments to the Wholesale Electricity Spot Market (WESM) Rules and Market Manuals (Provisions on Penalty Framework for Test and Commissioning) Page 6 of 11 === dc2023-07-0023-pages-07.ppm === XXX = XXX iii. Schedule of loading levels of the generating units that has been issued with a Final Certificate of Approval to Connect but with pending issuance of the Certificate of Compliance by the ERC; and iv. Projected output (i.e., energy quantities only) of the Generation Companies with must dispatch generating units and priority dispatch generating units that has been issued with a Final Certificate of Approval to Connect but with pending issuance of Certificate of Compliance by the ERC. XXX 11.3 Responsibilities XXX XXX 11.3.4 XXX XXX XXX A Trading Participant that has been released with a Final Certificate of Approval to Connect but with pending issuance of the Certificate of Compliance from the ERC for its generating units shall likewise comply with dispatch schedules issued by the Market Operator, the dispatch instructions issued by the System Operator to their facilities operating on AGC mode, and the re-dispatch instructions issued to them by the System Operator, if any. XXX 11.5 Dispatch of Must and Priority Dispatch Generating Units 11.5.1 A must dispatch generating unit shall generate at its maximum available output at all times unless the Market Operator or System Operator has instructed the generating unit to restrict output. This shall likewise apply to must dispatch generating units that have secured a Final Certificate of Approval to Connect but with pending issuance of the Certificate of Compliance from the ERC. XXX XXX XXX Section 12 Dispatch Compliance 12.1 Background XXX = XXX 12.1.6 XXX Scheduled generating units, battery energy storage systems, pumped storage units, must dispatch generating units, and priority dispatch generating units that have Final Certificate of Approval to Connect but with pending issuance of Certificate of Compliance from the ERC shall likewise operate in accordance with Sections 12.1.1 and 12.1.3, as applicable, and Adopting Further Amendments to the Wholesale Electricity Spot Market (WESM) Rules and Market Manuals (Provisions on Penalty Framework for Test anc Commissioning) Page 7 of 11 === dc2023-07-0023-pages-08.ppm === as prescribed in Chapter 3 of the WESM Rules. XXX XXX XXX 12.4. Compliance with Dispatch Schedules and Instructions 12.4.1. Compliance by the Scheduled Generating Units and Priority Dispatch Generating Units a. All scheduled generating units and priority dispatch generating units shall comply with their respective dispatch schedules. This obligation shall also apply to the scheduled generating units and priority dispatch generating units with a Final Certificate of Approval to Connect but with pending issuance of the Certificate of Compliance from the ERC. In complying with their dispatch schedules, said generating units shall generate in accordance with the dispatch conformance standards prescribed in Section 12.5 of the Dispatch Protocol. In the case of a priority dispatch generating unit, compliance with the dispatch conformance standards shall also apply in cases where its dispatch schedule was restricted pursuant to WESM Rules Clauses 3.6.1.7 and 3.6.1.8 because of a potential system security contingency. XXX XXX XXX 12.4.2 Compliance by the Must Dispatch Generating Units a. A must dispatch generating unit shall generate at its maximum available output at all times, unless it has been instructed to restrict its output by the Market Operator or System Operaior. This obligation shall also apply to must dispatch generating units with a Final Certificate of Approval to Connect but with pending issuance of the Certificate of Compliance from the ERC. XXX XXX = XXX Section 4. Amendments to the Market Penalty Manual. The attachment of the Penalty Manual is hereby updated as follows: XXX XXX XXX Section 4 - Table 1. Frequency of Occurrence Matrix Frequency |!solated Occurrence _| Repetitive or Recurring Occurrence Level 3 XXX XXX XXX XXX Adopting Further Amendments to the Wholesale Electricity Spot Market (WESM) Rules and Market Manuals (Provisions on Penalty Framework for Test and Commissioning) Page 8 of 11 === dc2023-07-0023-pages-09.ppm === with for Frequency One-time requirement timeline set | compliance Section 4 - Table 1, Frequen the XXX XXX XXX Isolated Occurrence Level! 1 N/A of Occurrence Matrix Repetitive or Recurring Occurrence Level 2 _Level 3 Four (4) to thirty (30) | More than thirty (30) business days of business days of delay reckoned from delay reckoned from the end of the | the end of the compliance period | compliance period provided by the | provided by the relevant Market | relevant Market Rules or Manuals. Rules or Manuals. Section 5 - Table 2. Schedule of Breach and Penalties | 13 | without Breach Failure of the registered WESM Member to apply for Commercial Operations Registration after receiving the Certificate of Compliance or the Provisional Authority to Operate whichever is earlier. The failure to apply for Commercial Operations Registration is considered just cause when Market Rule Breached & Associated Market Manual Section 2.5.7.3 (g) and (h) of the Registration Manual Applicable Penalty Level 1- N/A Level 2 - Financial Penalties Level 3 - Escalated Financial Penalties Level 4 - Suspension / Deregistrati on/Disconn ection | P10,000 for Level 2 - Financial Penalty the first day of default/ delay plus P1,000 for each day of continuing breach/viola tion The penalty computation will continue until compliance by the concerned WESM Member with respect to its commercial operation registration or the actual deregistrati Level 3 - Escalated Financial Penalty Additional P2,000 for each day of continuing breach/viola tion The penalty computation will continue until ' compliance | by the concerned WESM Member with respect to its commercial operation registration or the actual | deregistrati on in the WESM | (if Level 4 Adopting Further Amendments to the Wholesale Electricity Spot Market (WESM) Rules and Market Manuals (Provisions on Penalty Framework for Test and Commissioning) Page 9 of 11 === dc2023-07-0023-pages-10.ppm === Section 5 - Table 2, Schedule of Breach and Penalties Market Rule | Applicable Level 2 - Level 3 - Breached & Penalty Financial Escalated _ Associated Penalty Financial | Market Penalty | Manual is on in the WESM _ (if Level 4 penalty imposed), as the case may be. the inaction, deferment, or delay on the part of the penalty is WESM imposedq), _Member has as the case /no basis in may be. fact or in law, or the cause/s for such failure is/are not established to have been beyond its | control. Generation Section Level 1- |For each after the | 2.5.7.3 (a) | Non- count of |For each expiry of the | (c) and (h) | Compliance | breach: breach: authorized | of the | Letter / | P100/MWh | P200/MWh test and | Registration | Reprimand {| x GESQ x GESQ commissionin | Manual (MWh) _ (MWh) g period Level 2 - unless Financial P100 —pre- | P200 — pre- otherwise Penalties set penalty | set penalty authorized by amount amount law, relevant Level 3 - | Market Rules, Escalated Manuals. Penalties | refers to the | refers to the gross gross energy energy settlement settlement quantity of | quantity of generating | generating unit as | unit as defined in | defined in Clause | Clause | 3.13.6 ofthe | 3.13.6 of the WESM Rules. WESM Rules. Adopting Further Amendments to the Wholesale Electricity Spot Market (WWESM) Rules and Market Manuals (Provisions on Penalty Framework for Test and Commissioning) Page 10 of 11 === dc2023-07-0023-pages-11.ppm === Section 5 - Table 2. Schedule of Breach and Penalties Breach Market Rule | Applicable Level 2 - Level 3 - Breached & | Financial Escalated i Financial Penalty Failure to comply with express mandatory | provisions of the Market ] | Rules, that are not otherwise covered in | other | identified | breach, but | which | expressly | provide for the penalties. imposition of | } Section 5. Separability Clause. If, for any reason, any section or provision of this Circular is declared unconstitutional or invalid, such parts not affected shall remain valid and subsisting. Section 6. Repealing Clause. All issuances contrary to or inconsistent with this Circular is hereby repealed, modified, or amended accordingly. Section 7. Effectivity. This Circular shall take effect fifteen (15) days following its complete publication in at least two (2) newspapers of general circulation and shall remain in effect until otherwise revoked. A copy of this Circular shall be filed with the University of the Philippines Law Center — Office of National Administrative Register (UPLC-ONAR). Issued this day of July 2023 at the DOE, Energy Center, Rizal Drive cor, 34! Street, Bonifacio Global City, Taguig City, Metro Manila. fy, RAPHAEL P.M. LOTILLA & : / Secretary JUL 20 2023 Adopting Further Amendments to the Wholesale Electricity Spot Market (WESM) Rules and Market Manuals (Provisions on Penalty Framework for Test and Commissioning) Page 11 of 11