=== dc2021-06-0016-pages-21.ppm === 7. 8. Compressed gas cylinders are prohibited inside confined spaces; and Appropriate handling equipment (cart or wheeler) should be used when transferring cylinders. N. Flammable Liquids Handling, Storage, Labelling and Disposal 1. Flammable liquids shall be properly stored, labeled, handled and disposed of according to recommended controls, as specified in the SDS, in accordance with applicable OSHS and/or DENR Standards; Approved safety pumps and similar devices shall be used when transferring liquids from one container to another. Motorized pumps shall be properly grounded; . Appropriate safety containers shall be used in handling or transporting flammabie liquids; . Adequate fire control and fire-fighting equipment shail always be available in areas where flammable liquids are present; . Flammabie liquids shall not be discharged into the sewers, drainage, canals or natural waterways: . Empty flammabie containers shall be disposed of in accordance with the manufacturer's instructions and local regulatory requirements; and Hauling of flammable and/or combustible liquids must be in compliance with DENR standards. O. Explosives Storage, Use, Transportation and Disposal 4. The government laws pertaining to the use, storage and transportation of explosives shall be strictly observed. Manufacturer's instructions for the safe handling and storage of explosives shall be followed; Disposal of all empty explosive containers shall be in accordance with manufacturer's recommendations and local regulatory requirements; . Blasting machines and equipment are to be disconnected from firing circuit by switching to “safe” or “unarmed” position before and after a charge is fired; . Worker/s who handle, prepare, toads, fires, burns or destroys an explosive are certified blasters or working under the direct supervision of a certified blaster, === dc2021-06-0016-pages-22.ppm === 5. Explosives and explosive devices shall be transported in accordance with all applicable regulations and shall be provided with the appropriate security escort at all times; 6. The loss or theft of explosives from a worksite shall immediately be reported to the nearest authorities and to Supervisor in charge; 7. Warning signs about the use of radio transmitter must be posted on all access roads 1000 feet (304.8 meters) from the blasting area; 8. All access points to the blasting area shall be properly guarded until an “ALL CLEAR’ signal is sounded; 9. Explosives or dynamites used for quarrying or road construction shall be stored in magazines as per regulatory standard; 10.Dynamites shall be separated from the blasting ingredients such as blasting caps or fuses when stored or transported; 11.For security reasons, vehicles transporting explosives shall not be marked unless required; 12. Only Authorized Personnel shal! handle explosives; 13.Explosive magazine shall be constructed as per standards. Danger signs shall be installed to warn the public. Explosive magazine shall be provided with at least two ventilation outlets; 14. Stacking/piling of boxes of explosives shall only be on eye level; 15.Perimeter gates and doors of the storage magazine shall be provided with two (2) locks each. One for the military and one for the company custodian; 16. Only Authorized Personnel shall be allowed to enter the storage areas or near explosives; 17. Smoking is strictly prohibited in areas where there are explosives; and 18. Military escorts must be present during transport of explosives. P. Warehouse Safety 1. Warehouses shall be well-ventilated and well-lighted. The lighting specification and requirement shall be in accordance to the latest Philippine Electrical Code, the DOE Manual of Practice on Efficient Lighting and/or the Institute of Integrated Electrical Engineers of the Philippines, Inc.'s (WEE) Manual for LEED Compliant Lighting System Design; === dc2021-06-0016-pages-23.ppm === 8. . if a warehouse is provided with fire sprinkler system, it must conform with the National Building Code; . Storage areas shall be provided with adequate fire extinguisher located at strategic places in accordance with the Fire Code of the Philippines; Adequate clearance between stocks and wall, and between aisles, shall be provided for easy access; Warehouse shall be provided with enough space for the operation of material handling equipment; . Materials stored in open areas shall be protected against the weather, and shall not be placed in direct contact with bare soil or ground; . Eyewash stations must be available in designated areas and shall be regularly maintained; and Shelves shail be labeled to indicate the capacity they can carry. . Ladder Safety 1. inspect ladders prior and after use to ensure their good state. Take out of service immediately damaged or defective tadders, report them to management, and tag on them a warning sign so they won't be used until they are properly repaired or replaced; Maintain ladders free of oil, grease and other slipping hazards; Do not load tadders beyond their maximum intended load nor beyond their manufacturer's rated capacity; . Use ladders only for their designed purpose: Use ladders only on stabie and level surfaces unless secured to prevent accidental movement; . Do not use ladders on slippery surfaces unless secured or provided with slip-resistant feet to prevent accidental movement; Secure ladders placed in areas such as passageways, doorways or driveways, or where they can be displaced by workplace activities or traffic to prevent accidental movement, or use a barricade to keep traffic or activity away from the ladder: . Use ladders equipped with nanconductive side rails if the Worker or the ladder could come in contact with exposed energized electrical equipment; to Lo === dc2021-06-0016-pages-24.ppm === 9. Always maintain a 3-point (two hands and a foot, or two feet and a hand) contact on the ladder when climbing/descending. Keep your body near the middie of the step and always face the ladder while climbing/descending; 40. Do not carry objects or loads that could cause loss of balance and falling; 11. Parallel, level and uniformly space ladder rungs, cleats and steps when the ladder is in position for use; 12.Do not tie or fasten iadders together to create longer sections unless they are specifically designed for such use; 13. If the total length of the climb on a fixed ladder equals or exceeds 24 feet (7.32 meters), equip the jadder with safety devices or self-retracting lifelines and rest platforms; 14. immediately mark defective or tag with "DO NOT USE" or similar language and withdraw from service until repaired ladders with structural defects—such as broken or missing rungs, cleats or steps, broken or split rails, corroded components or other faulty or defective components; 15.Never move, “walk” or “jog” a ladder while you are on it. Go gown first and the reposition the ladder; 16. Do not climb while holding something-use tool belt to carry tools. If need to move equipment to the roof that cannot be fastened or carried safety in a tool belt, tie of properly, using fall protection, and use a rope or hoist to raise and lower tools and other objects; 17.Atlow only one Worker on a ladder at time: 18. Always move the ladder to avoid overreaching; 19. Never leave raised ladders unattended: 20. Always work within an arm’s reach from the ladder, keep both feet on the rungs and use belt buckle as a guide to keep weight centered on the ladder during all times; 21.Be sure that the shoes are free of mud, grease or other substances which could cause a slip of fall; and 22.Free the areas around the top and base of ladders free tripping hazards such as loose materials, trash and electric cords. R. Lightning Protection === dc2021-06-0016-pages-25.ppm === 1. Lightning protection system shall be installed in wind project structures and lifting equipment, especially on facilities with sensitive electronic equipment: 2. Installation of lightning protection shall be done by trained and qualified lightning protection specialists; 3. For quality assurance, ali materials and methods shall comply with nationally recognized safety standards for lightning protection as established by National Fire Protection Association/latest Philippine Electrical Code; 4. Other electrical works shail be in placed as prescribed in Section IIl.H hereof; and 5. Required PPE shall be used in accordance with Section I!l A.2 hereof. S. Facility Improvement Works 1. Excavation and Filling Works a. All excavation and filling works shall be covered with appropriate work permit system; b. Only Authorized Personnel shall supervise all excavation and filling works; c. Roles must be clearly defined, and Workers must meet the training requirements for excavation and filling works; i. A Civil Engineer or Qualified Professional shail be employed for the analysis of soil types and conditions; ii. Excavation in close proximity to building, roads, retaining walls and other structures or deeper than 20 feet (6.1 meters) must be reviewed and approved by a Civil Engineer or Qualified Professional; and iii. Protective systems (i.e., shoring, bracing, sloping, benching, and shields) for excavations 4.9 feet (1.5 meters) deep shall be designed by a Civil Engineer. d. Before any excavation is started, available drawings/plans, electronic and/or other appropriate equipment to locate underground pipelines, electrical lines, and other utilities are utilized. When all lines have been located, the excavation work area will be rechecked to ensure that no lines have been missed. When lines have been located they shail be exposed by hand before using mechanical excavators; e. Required PPE shall be used while doing excavation and filling works; 25 === dc2021-06-0016-pages-26.ppm === Proper waming and instructional signs shall be visibly posted at all times when work is being performed, and shall be removed or recovered promptly after work is completed . Excavation areas shall be properly barricaded, delineated and provided with proper safety and warning signs; . Excavation material and heavy equipment shall be kept at a distance as prescribed under OSHS; Gangplanks with railing or metal piates shall be provided where an excavation crosses driveways or streets; Approved access ladder shall be provided and regularly inspected. Ladders shall be extended 3 feet (0.9 meter) above the level to be accessed; . Sloping, sheeting, shielding, benching, shoring, cutbacks, fencing, bracing or approved temporary protective structures that may be required for safe operations, are provided for and used, built in accordance with standard engineering practices; Excavation works on identified H2S prone area shall be inspected for presence of H2S before any work will commence and regularly monitored during the duration of the work; . Temporary railings, barricades, fencing, lanterns, reflective flagging or illuminated warning devices and other warning systems are placed around excavations left open at night or where there is a hazard to Workers and the general public; . Spoils, materials or equipment that might fall or roll into an excavation or trench are kept at least 3.3 feet (1 meter) from the edge of excavation, or not less than one-third (1/3) of the depth for excavation deeper than 9.9 feet (3 meters); . A Confined Space Entry Permit is prepared and approved to conirol the work when entry into excavations and trenches deeper than 3.9 feet (1.2 meters) is to be performed; . Workers must be protected from accumulation of water, gas and other elements that may be encountered during excavation. Risks associated with hazardous atmosphere inside excavations shall be analyzed and mitigated; and . Rescue plans must be developed for excavations. First aid shail be available at all times; Emergency response team shall be available depending on the results of the risk assessment. === dc2021-06-0016-pages-27.ppm === 2. Concreting and Structural Works a. Work permit system shall cover all structural works at heights and all works that require the use of oxy-acetylene cutting and any kind of welding works; . Roles must be clearly defined, and Workers must meet the training requirements for concreting and structural works; Only Authorized Personnel shall supervise all concreting and structural works; . Required PPE shall be used while doing concreting and structural works in accordance with Section fILA.2 hereof, . Proper warning and instructional signs shall be visibly posted at all times when work is being performed, and shail be removed or recovered promptly after work is completed; Work sites shail be properly barricaded, delineated and provided with proper safety and warning signs; . Standard scaffoldings and full body harness shall be provided when working at heights. Installation and dismantling of scaffoldings shail be performed in accordance with DOLE DO No. 128-13; . Lifting procedure shall be implemented for heavy and special lifting works. Lifting and rigging procedures shall be in accordance with OSHS; and Rescue plans must be developed for works at height and lifting operations. First aid shall be available at all times; Emergency response team shail be available depending on the results of the risk assessment. 3. Road Works / Earth Moving a. b. Only Authorized Personnel shail supervise all road works; Roles must be clearly defined, and Workers must meet the training requirements for road works and earth moving; . Required PPE shall be used while doing road works in accordance with Section lILA.2 hereof: Proper warning and instructional signs shall be visibly posted at all times when work is being performed, and shall be removed or recovered promptly after work is completed; Traffic management plans shall be in place when work is being done; 27 —_ === dc2021-06-0016-pages-28.ppm === Workplace conditions shall be inspected to eliminate or control hazards that may expose the Worker to injury; Work sites shall be properly barricaded, delineated and provided with proper safety and warning signs; Only Authorized Personnel shall be allowed to operate equipment; Heavy equipment shall have spotter to assist the operator; and First aid shall be available at all times; Emergency response team shall be available depending on the resuits of the risk assessment. 4. Piping and insulation Works a. Only Authorized Personnel shall supervise all piping and insulation works; . Only Authorized Personne! shall be allowed to conduct piping and insulation works; Required PPE shall be used while doing piping and insulation works in accordance with Section llf.A.2 hereof; . Proper warning and instructional signs shall be visibly posted at all times when work is being performed, and shall be removed or recovered promptly after work is completed; . Workplace conditions shall be inspected to eliminate or control hazards that may expose the Worker to injury; Work sites shall be properly barricaded, delineated and provided with proper safety and warning signs: . All coded piping and insulation works ({i.e., high pressure pipe welding, hot tapping) shal! have detailed and approved safe work procedures; . All piping and insulation works shall be covered with appropriate work permit system; All coded piping and insulation work wastes shall be properly disposed according to environmental regulations; and First aid shall be available at all times; Emergency response team shall be available depending on the results of the risk assessment. 5. Hot Works ane === dc2021-06-0016-pages-29.ppm === a. The Employer shall establish a program which designates who issues a hot works permit and what kind of jobs are covered by a hot works permit. b. Only Authorized Personnel shall supervise all hot works; c. Only Authorized Personnel shall be allowed to conduct hot work; d. Required PPE shail be used while doing hot works in accordance with Section {li.A.2 hereof, e. Proper warming and instructional signs shall be visibly posted at all times when work is being performed, and shall be removed or recovered promptly after work is completed; f. Workplace conditions shall be inspected to eliminate or control hazards that may expose the worker to injury and potential property damage; g. All hot works shall have detailed and approved safe work procedures; h. All hot works shall be covered with appropriate work permit system; i. Combustible and flammable materials should be removed from the work area; j. ltems that cannot be removed shall be covered with fire-retardant biankets; k. In areas where hot works are performed, the floors shall always be kept clean; |. Welding shields should be provided to contain or protect from sparks and splatters; m. A Fire Watch with appropriate communication and fire extinguishing equipment shail be assigned whenever hot work is performed in locations where other than a minor fire might develop; n. The hot work area shall be gas tested by an Authorized Personnel if the area is known to have potential presence of flammable gas or liquid using approved and calibrated gas detection instruments. Atmospheric conditions in the work area must be acceptable before any work is allowed to start or continue. Flammabie atmosphere should be jess than 10% of the LEL; and 0. First aid shall be available at all times; Emergency response team shall be available depending on the results of the risk assessment. 6. Mechanical and Equipment Installation === dc2021-06-0016-pages-30.ppm === . Mechanical Engineers shall supervise over all mechanical and equipment installation as per Article 1V, Section 33 and 35 of RA No. 8495. . Observe the personnel requirement under Section 34 of RA No. 8495; . Mechanical equipment covered by DOLE Technical Safety Inspection shall secure the needed permit to install before installation and permit to operate before operation; . Roles must be clearly defined, and Worker must meet the training requirements for mechanical and equipment installation; . Required PPE shall be used while doing mechanical and equipment installation in accordance with Section Hi.A.2 hereof, Proper warning and instructional signs shall be visibly posted at all times when work is being performed, and shall be removed or recovered promptly after work is completed; . Workplace conditions shail be inspected to eliminate or control hazards that may expose the Worker to injury; . All mechanical and equipment installation shall have detailed and approved safe work procedures; All mechanical and equipment instailation shall be covered with appropriate work permit system; All mechanical and equipment installation work wastes shail be properly disposed according to environmental regulations; . Appropriate lifting equipment and procedures shall be used in mechanical installation; and First aid shall be available at all times; Emergency response team shalt be available depending on the results of the risk assessment. T. Motor Vehicle and Heavy Equipment Operations 1. Only Authorized Personnel shall supervise all motor vehicles and heavy equipment operations; Only Authorized Personnel shall be allowed to operate motor vehicles and heavy equipment: . Drivers and heavy equipment operators shall have valid driving license and mandatory government certifications appropriate for the equipment they will operate; 30 === dc2021-06-0016-pages-31.ppm === 10. 11 12. 13. Drivers/operators under the influence of liquor and/or asleep inducing drugs or any medication that will affect vision, judgment and reflexes shall not be allowed to operate motor vehicles and heavy equipment; . All motor vehicles and heavy equipment shail be: a. Provided with basic emergency tools and equipment like early warning device, choke block, fire extinguisher etc.; b. Subjected to a pre-use inspection; c. Loaded up to its rated capacity only; and d. Subjected to scheduled preventive maintenance. All drivers/operators shall immediately report any observed unsafe condition of the motor vehicles and heavy equipment: All drivers/operators shail strictly foliow all established company and government traffic rules and regulations; All vehicles and heavy equipment deemed or reported to be unsafe shall be removed immediately from service and shall not be used unti! appropriate repair has been undertaken; All drivers shall report immediately any vehicular incident to the company and appropriate authorities; All motor vehicles and heavy equipment shall be equipped with the prescribed and approved seat belts for all driver and passenger seats; .Only Authorized Personnel shall conduct repairs to ail motor vehicles and heavy equipment; Any vehicle with restricted vision sha!l not be moved while in the vicinity of other workers, processing equipment or servicing/drilling equipment except under the direction of a designated signal man or spotter; and A Journey Management Plan shall always be prepared for non-routine trips and journeys with high risks (i.e., oversized cargoes, unpaved roads, roads with dangerous curves) to ensure that driving risks and exposures are minimized and managed. U. Hoist and Lifting Works Operations 1. 2. Only Authorized Personnel shal! supervise hoist and lifting works; Only Authorized Personne! shall be allowed to operate hoist and lifting equipment; Only authorized rigger shall be allowed to direct and guide hoist and lifting operation; === dc2021-06-0016-pages-32.ppm === 4. Operators under the influence of liquor and/or asleep inducing drugs or any medication that will affect vision, judgment and reflexes shall not be allowed to operate hoist and lifting equipment; 5. All hoist and lifting equipment shall conform to the requirements of all applicable industry and regulatory standards; 6. All hoist and lifting equipment shall be provided with basic emergency tools and equipment where applicable like horn, lights, outrigger matting, fire extinguisher etc.; 7. Atl hoist and lifting equipment shall be subjected to a pre-use inspection by authorized operator for safe operation; 8. All hoist and lifting equipment shall be loaded up to its rated capacity only; 9. All hoist and lifting equipment shall be subjected to scheduled preventive maintenance in accordance with manufacturer's recommendations; 10. Worker/s shail immediately report any observed unsafe condition of the hoist and lifting equipment; 11. All unsafe hoist and lifting equipment shail be removed immediately from service and shail not be used until appropriate repair has been undertaken; 12. Worker/s shall report immediately any incident/accident to the company and appropriate authorities; 13. All hoist and lifting equipment shall be equipped with the prescribed and approved seat belts; 14.A daily routine inspection of all heavy equipment deployed at the site shall be conducted by Authorized Personnel and certified mechanics shall conduct repairs of the hoist and lifting equipment; 15. All heavy equipment shall be regularly inspected and maintained in good condition; 16. All hoist and lifting equipment shall be subjected to load test inspection as recommended by the manufacturer and as prescribed by DOLE or its recognized organizations; 17. All critical lift works or jobs shail be covered by critical lift procedure; 18.The general constructor or the equipment owner shall maintain a separate logbook for data on maintenance, repairs, tests and inspections for each heavy equipment; 3 i) === dc2021-06-0016-pages-33.ppm === 19. Prior to performing a lift, the operator shall determine the weight of the object to be lifted and ensure that cables, lifting devices, slings, wire ropes, chains, etc. are of sufficient strength, in proper condition, and positioned to support the weight of the load. Load calculations shall be conducted for all critical lifts; 20. The following should always be considered: 21. Proximity to power lines; Proximity to other Worker and equipment; Wind velocity; Ground conditions for outriggers; Reach or extension of lifting equipment; Weight of the !oad including the rigging being used; and Outriggers placed on load bearing floats or pads that are adequate size and strength for loads being lifted. a-oaqc® One person shail be designated as a spotter (signal person or flagman) and the lifting device operator shall take direction or instruction from the spotter only: 22.The operating area of the lifting device shall be barricaded and no Worker shail allow any part of his body to exiend underneath any load being lifted by a crane, side boom, or other lifting device; and 23. No person shail be allowed to work, walk through, stand, or stay beneath any suspended load being lifted, moved or lowered. . Working at Height and Protection from Falling Objects 1. Ensure all structures are designed and built to the appropriate standards and have the appropriate means of working at height systems fitted; . Establish and maintain suitable exclusion zones and maintain underneath any working at height activities, where possible, to protect workers from falling objects; Ensure all Workers working at height are trained and competent in the use of all working at height and rescue systems in piace; . Provide Workers with a suitable work-positioning device; also ensure the connectors on positioning systems are compatible with the tower components to which they are attached; Ensure that hoisting equipment is properly rated and maintained and that hoist operators are properly trained; ive) G2 === dc2021-06-0016-pages-34.ppm === 6. When working at height, all tools and equipment should be fitted with a lanyard, where possible, and capture netting should be used if practicable; 7. Remove signs and other obstructions from poles or structures prior to undertaking work; 8. Use an approved too! bag for raising or lowering tools or materiais to workers on elevated structures; 9. Avoid conducting tower installation or maintenance work during poor weather conditions and especially where there is a risk of lightning strikes; 10.Place an emergency rescue plan detailing the methods to be used to rescue operatives should they become stranded or incapacitated while at height; and 11.Use required PPE while working at height as protection from falling objects in accordance with Section IH.A.2 hereof. W. Fire Hazards, Protection and Control 1. General Objective All geothermal operators shall establish a fire prevention and control “ee program in accordance to Republic Act No. 9514 also known as the “Fire Code of the Philippines of 2008”. 2. Fire Extinguishers a. Fire extinguishers shall be inspected once a month and shall be maintained in good operating condition at all times; Fire extinguishers shall be kept in their designated places. If they are removed for refilling/repair, it shall be replaced immediately with the same type and capacity; Durable inspection tags shall be attached securely to each extinguisher showing the servicing data properly recorded and signed by the designated safety officer or end-user; Fire extinguishers shall be installed in strategic locations free from obstructions. Only fire extinguishers shall be placed inside the extinguisher box to avoid exposure to excessive heat; Tampering of markings, tags and other emergency instructions labeled on ail fire protection equipment shail be prohibited; 34 === dc2021-06-0016-pages-35.ppm === f. Fire extinguishers shall have hydro testing records according to manufacturer's specifications; and g. Fire extinguishers shall conform to the fire protection standard as per Fire Code of the Philippines and DAO 2000-18 also known as the Chemical Control Order for Ozone Depleting Substances (ODS) and other related rules. 3. Fire Hydrants, Fire Hoses and Accessories a. Fire hydrants, hoses and accessories shail conform to the Fire Code of the Philippines; b. Fire hydrants, hoses and accessories shall be kept in good condition. They shall be used properly and only for the purpose for which they are intended; c. Fire hose installed at yard hydrant shail be kept in well-ventilated fire hose cabinet properly locked and marked "FOR FIRE USE ONLY"; d. Only Authorized Personnel shall conduct inspection and/or testing of fire hydrants, hoses and accessories at least once a month. Defective items shall be replaced immediately; e. Firefighting equipment shall be placed in strategic locations and must be free from obstructions; and —n Tampering of fire alarms, valves and other accessories {ts prohibited. Any damaged parts should be immediately repaired or replaced. 4. Firebreak a. Firebreaks should be of sufficient length and width te contain a possible fire and allow passage of firefighting vehicle; and b. Erosion contro! measures must be incorporated into firebreaks with sloping ground. X. Scaffolding Safety Scaffoldings requirements shall be in accordance with DOLE DO No. 128- 13. i. Generali Requirements a. Installation, dismantling and structural requirements of scaffolding shall conform to the requirements of all applicable industry and regulatory scaffolding standards; 35 === dc2021-06-0016-pages-36.ppm === . Every scaffold shall be of good construction of sound materials and strength for the purpose for which it is intended; . Timber used for scaffolds shall be in good condition, the bark completely stripped off, and not painted or treated in any manner that defects cannot be easily seen; . All materials and parts of scaffold not in use or intended for re-use shall be kept under good condition and separate from other materials unsuitable for scaffolds; . Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a qualified scaffoider; Scaffolds and scaffold components shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended toad; . Scaffold products from different manufactures shall not be mixed on a scaffold, unless they are specifically designed to be used together; h. Ascaffoid should never be erected within 10 feet (8 meters) of power lines; It is prohibited to ride on a moving mobile scaffold; Guardrails, midrails, and toeboards shall be installed on all open sides and ends of platforms 6 feet (1.8 meters) above the working surface (floor); . Guardrails shall be 2” X 4” or the equivalent (2” nominal diameter for tubular scaffolds) approximately 42 inches (106.7 cm) in height with a midrail. Supports shali be at intervals not to exceed 8 feet (2.4 meters): Toeboards shall be of 4 inches (10.2 cm) in height; . Scaffold planks shail extend over their end supports not less than 6 inches nor more than 12 inches (30.5 cm); . Any scaffold including accessories such as braces, brackets, trusses, screw legs, ladders, etc. damaged or weakened from any cause shail be immediately repaired or replaced; . Timber planking is allowed for the scaffold and shail have a minimum of 1,500 fiber (stress grade) construction grade lumber; . Scaffolding will be inspected for safe conditions on a daily basis. The contractor responsible will maintain a daily inspection permit and must conform to the requirements on the project site; === dc2021-06-0016-pages-37.ppm === . Scaffold must be tagged by a competent person. This inspection tag shall be attached on the scaffold at all times. Scaffold identification tags are color coded for each reference and should be located at the point of access; All personnel using a rolling scaffold must engage the wheel locking devices or block the scaffold against movement when the scaffold is stationary and personnel are working from the scaffold. Moving scaffolding with personnel on the scaffold is strictly prohibited; . Tools and equipment shall be raised to the work site in a bag or utility belt designed for that purpose. Straight access ladder attached to scaffolding should not exceed 20 feet (6.1 meters) without a break or offset that would limit a potential fall exposure. Access ladder that exceed 20 feet (6.1 meters) from the ground level should be placed inside the scaffolds frame with trap door conditions at access levels; Ladders shall not be used on scaffolds to increase the working level height of Workers, except on large area scaffolds where Workers have satisfied some reasonable criteria; . Makeshift devices, such as but not limited to boxes and barrels, shall not be used on top of scaffold platforms to increase the working level height of Workers; Scaffold tower, single-section, or rolling scaffolds must not exceed a 4:1 base-to-height ratio without structural bracing. Nor shail any section of the scaffold exceed a 4:1 ratio without structural bracing: . Cantilevered or outrigger scaffolds must have documentation to demonstrate safe loading conditions; . All suspended scaffolds require independent safety lines for each Worker. Workers must use a full body harness when working from any suspended scaffold. Personal fall arrest system used on scaffolds shall be attached by a lanyard to a vertical lifeline, horizontal lifeline, or scaffold structural member; Personal fall arrest system/Safety harnesses meeting an approved standard must be worn. Only full body safety harnesses (i.e., with chest and Jeg straps) will be permitted; and Overhead work should not be carried out above other workers unless the workers below are adequately protected by the installation of an overhead barrier. Every area where a worker could be struck by a falling object shall be clearly marked by barriers, notices, warning lights or other warning devices. 2. Scaffolding Components and Requirements 37 === dc2021-06-0016-pages-38.ppm === a. Materials L iii. Materials to be used in erecting scaffolding should be in good condition; Steel items should be free from rust; and Mandatory inspection should be conducted by experienced and competent person to all materials before use. b. Foundation til. Vi. Scaffold shall be capable of supporting without failure at least 4 times the maximum intended load; i. Timber sills at least 23 cm (9.1 in.) wide by 3.8 cm (1.5 in.) thick will be required to spread the load. A sili shall extend under at least two post; Where scaffolding is erected on a solid bearing such as rock or concrete, small timber pads may be used in place of sills and nailed to prevent the base plates sliding off: if used to compensate variations in ground levels, the screw jacks shail not be adjusted more than two-thirds of the total length of the thread; Scaffolds shall be anchored or secured to permanent or rigid structures. In the absence of permaneni structures, guys and sway bracing and/or outrigger shall be used; and The foot of any standards or upright should be adequately founded on a suitable base plate in order to prevent slipping or sinking. c. Posts Posts shall be pitched on 6 inches (15 cm) by 6 inches (15 cm) steel and at least 0.25 inch (0.64 cm) thick. All post shall be vertical; and The inner row posts shall be placed as closed as possible to the face of the building structure. The outer row shall be positioned depending on the load requirements of the scaffold. d. Runners Runners shall be securely fixed to post with standard couplers and shall be horizontal; and === dc2021-06-0016-pages-39.ppm === ii. Runners shall be vertically spaced no more than 6.5 feet (2.0 meters) to give adequate headroom along the platform. e. Bearers f. 1. g. Ties if. iil. iv. Vv. Vi. h. i. Bearers should be installed between post and securely fixed to the post with standard couplers; and Board bearers shall be installed between bearers to accommodate differences in planks length. Bracing Longitudinal diagonal bracing shail be installed at approximately 45° angle from near the base of the first outer post upward to the extreme top of the scaffold. All supported scaffolds except tower and mobile shall be securely tied to a building or structure throughout their length and height to prevent movement of the scaffold; Ties should be spaced every other lift and every 19.6 feet (6 meters) along the face of the scaffold; Ties should be fixed with load bearing couplers, as close to the node point as possible; Any structural features of the buildings ¢.g. pillars, columns, lintels, rebates, etc. should be taken full advantage to provide additional strength and stability to the tie: Make sure that the building is strong enough to support the tie and the load imposed on it by the scaffold; and For any reason, ties should not be removed until the overall stability of the scaffold has been confirmed. Platform Units All platform units shail be closed planked for the full width of the scaffold structure; Pianks shall be extend over their end supports by not less than 6 inches (15 cm) and not more than 12 inches (30.5 cm); Planks shall be secured in position to prevent displacement by strong winds; wv === dc2021-06-0016-pages-40.ppm === iv. Mid rails must be installed halfway between the top rail and platform and can withstand force of 150 Ibs.; and v. Toe boards shall not be less than 4 inches (10 cm.) in height by 1 inch (2.5 cm) thick. i. Access Access to a working platform is best achieved by providing a separate ladder tower or a cantilevered access platform so as not to obstruct the working platform and to minimize the risk of persons falling through gaps in the guardrail system or platform units. Access should be provided to working platforms; and Working platform shall be provided per level during erection. This working platform shall not be removed unless the succeeding level is installed. j. Workmanship i. Scaffolding shall be erected, altered and dismantled by experienced men working under the direction of a competent supervisor; and Scaffoids of more than 19.6 feet (6 meters) in height shall be designed by a structural engineer and shall be erected, installed and dismantled by TESDA certified erectors. k. Inspection All scaffolds shall be inspected by a competent supervisor, safety officers, and/or civil engineers before it is used and after adjustments, modifications, adverse weather conditions, etc., to measure that is safe: ii Green tags shall be hanged at each scaffolds access that have been inspected and are safe for use; iii Yellow tags shall be placed whenever special requirements for safe use are required. Situation requiring yellow tags may include whenever scaffoid has been modified to meet work requirements, and as a result could present a hazard to the user. Situation requiring Yellow tags shall be closely supervised; and iii Red "DANGER - UNSAFE FOR USE” tags shail be used during erection and dismantling when the scaffold is left unattended. Red tag shall be used when all green or yellow tags has been removed or during erection of scaffolds. 40