=== rmu-pages-61.ppm === This section provides the process for the collection and submission to the Central Registration Body of metering data. 5.3.1. Requirements 5.3.1.1, Data The metering data shall contain the following: a) Date and time, or time series, of the meter readings received for each Contestable Customer meter, b) Active energy (kWh), active power (kW), reactive energy (kKVARh), and reactive power (kVAR) data in 15-minute resolution with assigned channel number, and c) Site Equipment Identification Number of the meter, 5.3.1.2. Format The Retail Metering Services Provider shall su bmit the metering data in the meter data exchange format prescribed by the Certral Registration Body. 5.3.1.3. Timing Pursuant to Retail Rules Clause 4.3.8, all meter clocks shall be synchronized by the Retail Metering Services Provider to Philippine Standard Time (PST) to ensure accuracy of settlements. 5.3.2. Daily Process 5.3.2.1, Collection At a fifteen-minute resolution, the meter at the juetering point of a Contestable Customer continuously records metering data. Immediately at the end of the trading day, the Retail Metering Services Provider shall collect the metering dataand event log of the whole trading day from each meter, identified by its Recorder ID (SEIN) and Device ID (Serial Number),of all its associated Contestable Customers, 5.3.2.2. Submission The Retail Metering Services Provider shall submit the collected metering dataof the trading dayto the Central Registration Bodyat 0400H of the succeeding trading day. 5.3.2.2.1, Normal The Meter Data Retrieval System of the Retail Metering Services Provider automatically exports the metering data of all its associated Coittestable Customers to the Meter Data Collection System of the Ceitral Registration Body daily through file transfer protocol, Page 26 of 40 === rmu-pages-62.ppm === In the event that no metering data was received by 0800H, the Central Registration Body shall immediately call the Retail Meteriug Services Provider to resend the data through the same method. Upon receipt, the Meter Data Collection System of the Central Registration Body.converts the metering data to the required file format for use in settlement. 5.3.2.2.2. Communication Failure In case of communication failure between a meter and its Meter Data Retrieval System, the Retail Metering Services Provider shall retrieve the metering data from the meter manually through a meter reader handheld device or laptop. The metering data shall then be uploaded to the Meter Data Retrieval System of the Retail Metering Services Provider for export to the Meter Data Collection System of the Central Registration Body. 5.3.3. Monthly Process Not later than three (3)busiiess days after the end of the billing period, the Retail Metering Services Provider shall submit monthly preliminary metering data of all metering points of its associated Contestable Customers.In addition,Retail Metering Services Provider shall submit a transmittal letter that includes a tabulation of all associated luctering points and their corresponding total metered quantity for the billing period. The Retail Metering Services Providershall also report to the Certral Registration Body all discrepancies between. the monthly metering data and the daily metering data values with justifications for the discrepancies, In the event that metering data errors are detected by the Central Registration Body in accordance with Section6of this Manual, the Retail Metering Services Provider shall be required to submit final metering data addressing the errors (see also Section 6.3.2). 5.4. EMERGENCY PROCEDURES This section provides the procedural steps to be followed in case of a failure of the Meter Data Retrieval System of the Retail Metering Services Provider or an emergency situation that requires the transfer of the metering data processing operations of the Cevtral Registration Body from the Main Server to the Emergency Back-up System (EBS). 5.4.1, Failure of the Meter Data Retrieval System In case of a failure of the Meter Data Retrieval System of the Retail Metering Services Provider, a) The Retail Metering Services Provider shall: i. Inform the Central Registration Body of the occurrence of a failure of its Meter Data Retrieval System; ti. Perform emergency restoration of its Meter Data Retrieval System; ili. While the Meter Data Retrieval] System is out of service, retrieve all required tmetering data using alternative methods of retrieval and submit it within seven (7) business days to the Central Registration Body in a file format that is compatible with the system of the Central Registration Body. For this purpose, the Retail Metering Services Provider Page 27 of 40 === rmu-pages-63.ppm === may use a backup Meter Data Retrieval System, if it is available, or retrieve the metering data on-site or remotely using the appropriatesoftware; iv. Inform the Central Registration Body when its Meter Data Retrieval System is ready to resume normal operation; and Vv. ‘Resume normal retrieval and transmittal of metering data using the Meter Data Retrieval System. b) The Central Registration Body shall, upon receipt of the jmeteriig data, perform validation (refer to Section6 of this Manual) andprocess the metering data for billing and settlement, and upload the metering data to the metering database. 5.4.2. Transfer to Emergency Back-up System In the event that an emergency situation requires the transfer of the metering data ‘ BENC) Jurres & processing operations of the Certral Registration Body from the Main Server to the Emergency Back-up System (EBS), a) The Central Registration Body shall: i. Inform the Retail Metering Services Providers, Suppliers, and the Contestable Customers of the need to transfer operations from the Main Server to the Emergency Back-up Site; ii. Instruct Retail Metering Services Providers to transmit metering data to the Emergency Back-up Site; lil. Activate the Emergency Back-up Site, upload the meteriig data, perform validation and process the metering datafor billing and settlement; iv. Perform emergency restoration of its Main Server; Vv. When the operations are ready to resume at the Main Server, inform. the Retail Metering Services Providers to resume meteriigdata transmittal to the Main Server; and Vi. Resume operations at and upload the metering data to the Main Server,perform validation andprocess the metering datator billing and settlement. b) The Retail Metering Services Provider shall: i. Transmit the metering data to the Emergency Back-up Site of the Central Registration Body when instructed; and U. Resume transmittal of metering data to the Main Server of the Central Registration Body when informed. 6. DATA VALIDATION, ESTIMATION AND EDITING 61. COVERAGE Page 28 of 40 === rmu-pages-64.ppm === Pursuant to Retail Rules Clause 3.3.5.3(c), the Central Registration Body shall develop and publish the methodologies and procedures for determining metered quantity by using historical load profiles. This section provides the methodologies and procedures for validating, estimating, and editing metering data for the determination of the metered quantity of a Contestable Customer in accordance with Retail Rules Section 3.3.5.3, Furthermore, this section discusses the obligations of the Retail Meterin g Services Providers in the validation, estimation, and editing of metering data as stipulated in Retail Rules Section 4.6.2, 6.2. GENERAL DESCRIPTION All wietering data received by the Central Registration Body shall be evaluated using the Validation, Estimation and Editing process described in this section. When metering data contains missing values, uncertain values, or exceeds the maximum or minimum of the daily hourly load profile values of the registered jeter, such metering data shall undergo estimation and editing wherein substitutions of metering data shall be made using historical data. The Central Registration Body shall issue a Meter Trouble Report for all metering data that fails the validation component of the Validation, Estimate and Editing process. When Meter Trouble Reports are issued, the Certral Kegistration Body shall give instructions to the concerned Distribution Utility or Retail Metering Service Provider who shall investigate the meter trouble and subsequently provide a report to the Central Registration Body. The concerned Retail Metering Services Provider shall then correct the meter data. Procedures regarding Meter Trouble Reports are described in more detail in Section7 of this Manual. 6.3. VALIDATION PROCEDURES This section provides the procedures to be followed by the Central Registration Body and the Retail Metering Service Providers in the daily and monthly validation processes. 6.3.1. Daily Validation 6.3.1.1. Validation Error Categories The Central Registration Body shall perform several checks upon receipt of metering data. These checks are described further in Section 6.3.1.2. Metering datathat fails the checks will be reported according to four (4) error categories: a) Uncertain Value b) Missing Values c) Outside Historical Min/Max d) Orphan values 6.3.1.2, Validation Checks Page 29 of 40 === rmu-pages-65.ppm === The following checks shall be performed by the Central Registration Body for the above validation error categories: a) Check for uncertain values. b) Check for missing values. c) Check forvalues in the ietering datawhich fall outside the maximum and minimumrange of the historical data. The historical data used in this check are as tollows: i. Value durin g the same hour last week, il. Value durin g the same hour the previous day, and lii. Average of the values during the whole previous day. d) Check for values in the metering data whose nieter is not registered in the Central Registration Body. 6.3.1.3, Meter Trouble Report In cases where a tictering data error is detected, the Central Registration Body shall issue a Meter Trouble Report to the concerned Retail Metertig Services Provider. Further details are provided in Section 7 of this Manual. 6.3.1.4. Validation Reporting The Central Registration Body shall prepare a daily validation report containing the errors encountered for the day and their respective category, 6.3.2. Monthly Validation In addition to the daily validation, the Central Registration Body shall also validate the monthly metering data sent to the Certral Registration Body by the Retail Metering Services Providers. The procedure for the monthly validation is as follows: a) The Retail Metering Services Provider shall submit preliminary metering data in accordance with Section5.3.30f this Manual. The preliminary metering data must have no missing values. The Retail Metering Services Provider shall report to the Certral Registration Body all discrepancies between the monthly metering data and the daily iietering data values with justifications for the discrepancies; b) The Central Registration Body shall compare the values contained in the monthly mieteriig data to the daily imetering data of each metering point earlier submitted by the Retail Metering Services Provider. If there are discrepancies between the values, a Meter Trouble Keport(refer to Section7) shall be issued to the Retail Metering Services Provider; oO ~~ If issued a Meter Trouble Report, a Retail Metering Services Providershall correct the metering data and submit final imeteriig datanot later thanfive(5) business days prior to the issuance of the final settlement statement; and d) All final metering data shall be formally transmitted to the Central Registration Bodywith a cover letter identifying all the metering points, through their Standard Equipment Identification Number. Page 30 of 40 === rmu-pages-66.ppm === 6.3.3. Walidation of Grid Off-Take Metering Points The Central Registration Body shall, on a daily and monthly basis, validate the assignment ofgrid off-take metering pottto facilities of Contestable Customers.In this validation, the metered quantitymeasured at thegrid ofFtakemetering point is checked against the aggregate metered quaiitity of all facilities of Contestable Customers assigned to thatgrid off-takemietering point. The metered quantitymeasured at the grid off-take ietering point shall be greater than the aggregate metered quaittity of all facilities of Contestable Customers assigned to thaterid off-take metering pout. If the aggregate nietercd quantity of all facilities of Coitestable Customers assigned to the grid off takenietering point exceeds the iietered quantity at that grid off-takemetering point, the Central Registration Bodyshall issue a meter trouble report to the concerned Retail Metering Services Provider. 6.3.4. Metering Installation Validation Tests Pursuant to Retail Rules Clause 4.6.2.1, in case of metering data error, the Retail Metering Services Provider shall perform validation, estimation and editin g in order to derive corrected metering data. This section provides the validation tests that a Retail Metering Services Provider shall perform on its metermg installations. 6.3.4.1. Current and Voltage Check This indicator detects the loss of voltage and/or current input to the meter due to failure of the supply from one or more instrument frausformers or tampering. 6.3.4.2, Load Profile vs. Meter Reading This checks for corruption related to the meter multiplier. 6.3.4.3, Intervals Found vs. Interval Expected This checks for missing intervals. 6.3.44, Time Synchronization This checks for synchronism of meter clock to Philippine Standard Time/Data Collection System time. , 6. ee) ALS. Number of Power Outage Intervals This indicator allows periods of zero primary power to be identified. 6.3.4.6, Cyclic Redundancy Check / Read-Only Memory /Random Access Memory This is part of the internal components of a tteter, which is automatically flagged when failing. 6.3.4.7, Meter Clock Overflow Page 31 of 40 === rmu-pages-67.ppm === Flag generated by the meter indicating failure of internal electronics. 6.3.4.8. Hardware Reset Flag generated by the meter indicating failure of internal electronics. 6.3.4.9, Time Reset This indicates the interval in which the meter clock time has been changed creating either a shorter or longer interval. 6.3.4.10. Data Overflow on Interval] This indicates that the meter is creating more pulses than it can record in an interval or Data Collection System (DCS) can accommodate in an interval. 6.3.4.11. Number of Channels The actual number of data channels from the meter does not match the number expected at the data collection System. 6.3.4.12. Changed Device ID The internal device identifier does not match the value registered at the data collection system. 6.3.4.13. Watchdog Time Out This is the failure of the meter to return data in response to a poll within the required time frame. This is reported by some recorders when a watchdog register is tripped or activated. 6.3.4.4. Parity Error This indicator is determined by a parity error bit that is set by a recorder on a channel of data during status check or read/write function. 6.3.4,15. Event Log Check This checks error messages and alarms recorded by the meter. 64. ESTIMATION PROCEDURES 6.4.1. Daily Process Upon detection of a metering error in the daily metering data, the Retail Metering Services Providers shall correct and estimate the iietering data on a daily basis. 6.4.1.1, Uncertain Value Checking Page 32 of 40 === rmu-pages-68.ppm === Any value in the metering data that falls outside the maximum and minimum range of the ietering data as recorded in the registry of the Central Registration Body metering system shall be marked with the status ‘uncertain’. Metering data with values with ‘uncertain’ status are estimated using the following: 6.4.1.1.1. Historical Values The values with ‘uncertain’ status may be replaced using the followin g historical data: a) Value during the same hout last week, b) Value during the same hour the previous day, and Cc) Average of the values during the whole previous day. 6.4.1.1.2. Backup Meter The values with ‘uncertain’ status may be replaced with the values from the backup meter during the same hour. 6.4.1.1.3. Previous Hour Data The values with ‘uncertain’ status may be replaced using the reading from the previous hour. 6.4.2. Monthly Process This section details the procedures conducted monthly for estimatingmetering data for the determination of the metered quantity of a Contestable Customer. 6.4.2.1. Interpolation of Metering Data If metering dataof one (1) to four (4) consecutive fifteen-minute intervals are missing, iieteriig data shall be estimated by means of interpolation between the available intervals. 6.4.2.2. Back-up Meter Data If metering data of more than four (4) consecutive fifteen-minute intervals are missing, ietertig data from the back-up meter can be directly substituted for the m issing data from the main tieter provided that the historical difference of metering data between the main and backup meters does not exceed more than 0.2%. If the historical deviation exceeds 0.2% but not more than 0.6%, a correction factor based on the historical difference between the main and backup metersshall be applied on thenetering data from the backup wieter before it is substituted for the missing data. 6.4.2.3, From Grid Off-Take Meter If both the main and backup meters fail, the metering data on the metering point of the facility of the Contestable Customershall be estimated using the metering data from its gril off-take meter. Themetering data of the Contestable Customer shall be estimated by adjusting the metering data of its grid off-take meter using a historical factor obtained through the comparison of the historical grid off-take metering data and historical contestable customer Page 33 of 40 === rmu-pages-69.ppm === main metering data. This method of estimation is not applicable for variable loads whose historical load profile is indeterminate. 6.4.2.4, Scientific Method of Estimation If there is a loss of one of the phase voltages and currents, estimation shall be performed through the scientific method of calculation using the average remaining phase voltages or currents of good data from the historical load profile. 6.4.2.5, Historical Meter Data If the above methods do not provide reasonable values, the following historical data from the main ietermay be used for estimating missing values: a) Valuesduring the same hour of the previous day with the same day type (ie., weekday or weekend), b) Valuesduring the same hour of the same day last week recorded by the same nicter (i.e. Saturday, Sunday, Holidays), and Cc) Average valueof the values during the same hour of the same day of the three (3) previous weeks recorded by the same meter. This method of estimation is not applicable for variable load whose historical load profile is indeterminate. 6.4.2.6. Other Technical Methods Other technical methods proposed and submitted by the Retail Metering Services Providers may be considered by the Ceritral Registration Body. 6.5. EDITING PROCEDURE The Central Registration Body shall update the meteriig data in the metering database to correct the values submitted by the Retail Metering Services Provider. This update shall include actual inetering data obtained as well as estimated nictering data from the main and back-up meters within the required period. 6.6. APPROVAL AND EXPORTING The Central Registration Body shall approve all received metering data before they are used in the settlement process. These jetering data shall have been reviewed and verified using the methods discussed in Sections6.3 and 6.4. Settlement-ready ietering data shall be exported to the settlement process and only approved data are transferrable. 7, METER TROUBLE REPORT 7.1. COVERAGE Page 34 of 40 === rmu-pages-70.ppm === This section provides the details and procedures in relation to the Meter Trouble Report and its issuance. 7.2. INITIATION A Meter Trouble Report may be initiateddue to the following: a) » Antetering data error is detected through the validation process described in Section 6.3 of this Manual; or b) A Retail Metering Services Provider, a Contestable Customer, or a Supplier requests the Ceitral Registration Body to issue a Meter Trouble Report to the Retail Metering Services Providerdue to difficulties in communicating with a metering installation, or validation of metering data. Where the Central Registration Body determines that a Meter Trouble Report is not required, it shall notify the Retail Metering Services Provider, Contestable Customer, or Supplier of its decision within twenty-four (24) hours. 7.3. ISSUANCE The Central Registration Body shall issue a Meter Trouble Report to the concerned Retail Metering Services Provider and, for information, its associated Contestable Customer or Supplier within twenty-four (24) hours after detection or request. 74. RESOLUTION 74.1, Timeline Upon receipt of the Meter Trouble Report, a Retail Metering Services Provider shall submit the correct Metering data to the Central Registration Bodywithin two (2) business days. 7.4.2. Unresolved Meter Trouble Reports 7A, Estimation Ifa Meter Trouble Report is still unresolved after the designated timeline in Section 7.4.1, the Central Registration Body shall implement the estimation and editing of metering data in accordance with Section6 of this Manual. 74.2.2, Late Resolution The Retail Metering Services Provider may still resolve a Meter Trouble Report and provide luetering data acceptable to the Central Registration Body after the deadline set in Section 7.4.1. For late resolutions, the deadline to be reflected in the final settlement statement is five (5) businessdays prior to the issuance of the final settlement statement of the affected trading day. 74.2.2.1. Before Deadline If the Retail Metering Services Provider resolves the Meter Trouble Report and submits metering data not later than five (5) business days prior to the issuance of the final settlement statement date of the affected trading day, the Central Registration Body shall use the submitted metering datator the final settlement of the Supplier or Contestable Customer. Page 33 of 40 === rmu-pages-71.ppm === 7.4.2.2.2. After Deadline If the Retail Metering Services Provider resolves the Meter Trouble Report and submits metering data later than five (5) business days prior to theissuance of the final settlement statement of the affected trading day, the Central Registration Bodyshall reflect the said adjustment in the succeeding billing period”. 74.2.3, Certification The Retail Metering Services Providershall provide a certification on the adjusted metering data showing the agreement of all affected parties in accordance with Retail Rules Clause 4.6.2.3. 7.4.2.4, Meter Malfunction In cases where there is an unintentional jeter error (e.g., meter multiplier) that causesa meter malfunction, theRetuail Metering Services Provider shall reconcile the metering data of the affected trading intervalswithin one (1) year after the date of discovery of such error. 8. PERFORMANCE MANAGEMENT 8.1. COVERAGE This section provides the Cuitestable Customers, Suppliers, Retail Metering Services Providers, and the Central Registration Body the steps for the review, evaluation and measurement of the performance of a Retail Metering Services Provider. 8.2. OBLIGATIONS The Central Registration Body shall conduct periodic monitoring and reporting of the ratings of Retail Metering Services Providers using the measures in this section. The Retail Meteriig Services Providers shall, if requested, provide the Central Registration Body information necessary for the measurement of their performance. 8.3. OVERVIEW The Retail Metering Services Providers shall be measured with respect to the following areas: a) The integrity of metering data provided by the Retail Metering Services Provider to the Central Registration Body and the Comtestable Customers; ; b) The timeliness of daily and monthly metering data delivery with respect to the deadlines in this Manual; c) The timeliness in resolving the daily and monthly Meter Trouble Reports; and d) Customer satisfaction. ~ Retail Rules Clause 3.3.5.3(b) Page 36 of 40 === rmu-pages-72.ppm === 8.4. PERFORMANCE MEASURES The Central Registration Body shall rate the performance of Retail Metering Services Providers against the standards set forth in this section. 8.4.1. Service Delivery 8.4.11. Daily Meter Data Delivery Daily Meter Data Delivery or Meter Retrieval Success is computed as the ratio of the number of metering installations with successfully communicated metering data to the total number of registered metering installations of the Retail Metering Services Provider. Daily average of Daily Meter Data Delivery shall be greater than or equal to 95%. 8.4.1.2. Integrity of Metering Data Integrity of Metering Data is computed as the ratio of the number of metering installations for which its meterig data has passed the validation process to the total number of metering installation with successfully communicated meteriig data. Daily average of the Integrity of Metering Data shall be greater than or equal to 95%. 8.4.1.3. Timeliness and Percentage Resolution of Daily MeterTrouble Reports Timeliness and Percentage Resolution of Daily Meter Trouble Reports is computed as the ratio of resolved Meter Trouble Reports, within two (2) business days, to the total number of meteriitg utstallations for which a daily Meter Trouble Reportwas issued on. Average daily Timeliness and Percentage Resolution of Daily Meter Trouble Reports shall be greater than or equal to 90%. 8.4.1.4. Timeliness and Percentage Resolution of Monthly Meter Trouble Reports Timeliness and Percentage Resolution of Monthly Meter Trouble Reports is computed as the ratio of resolved Meter Trouble Reports, not later than five (5) working days prior to the issuance of the final settlement statement, to the total number of metering installations for which a monthly Meter Trouble Report was issued. Average daily Timeliness and Percentage Resolution of Monthly Meter Trouble Reports shall be greater than or equal to 90%. 8.4.1.5. Timeliness of Monthly Meter Data Delivery Timeliness of Monthly Meter Data Delivery is computed as the ratio of the actual number of submitted metering data measured three (3) calendar days after the end of the billin & period to the expected number of submitted meteriig data based on the number of metering installations of the Retail Metering Services Provider. Timeliness of Monthly Meter Data Delivery shall be 100% or complete delivery of metering data. 8.4.2. Customer Satisfaction Page 37 of 40 === rmu-pages-73.ppm === Customer Satisfaction shall be computed using inputs collected through a survey. The survey shall allow the customers of the Retail Metering Services Provider to rate their satisfaction with regard to the following areas: a) Corporate Image, b) Punctuality and Responsiveness, a) Safety, and d) Behavior and General Impression. To facilitate the survey, a Retail Metering Services Provider Customer Satisfaction Rating (CSR) Sheetshall be issued to the customers of the Retail Metering Services Provider. Annual average Customer Satisfaction shall be greater than or equal to 90%. 8.4.3, Summary The performance measures described above are summarized in Table 5. Table 5.Summary of Retail Metering Services Provider Performance Measures. Performance | “Measure | Criteria - Percent | Percent | H { . i . | Category | | Weight | Passing = | Service | DailyMeterData Ratio of metering installations = «250095 ' Delivery | Delivery ' with successfully | | -communicated metering data | | to total number of metering i | 8 i | | | [ installations | | _IntegrityofMeter | Ratio of the number of 25 95 - Data | metering installations with | | valid metering to the total | } » number of metering | | i | installation with successfully | | | _communicated metering data | | = | | Timelinessand | Ratio of resolved Meter | 15 90 | | | Percentage | Trouble Reports to the total | | | Resolutiontothe | number of metering | | DailyMeter | installations for which a daily | | | : _ TroubleReport Meter Trouble Report was | | | | issuedon __ ia | | Timeliness and | Ratio of resolved Meter | 10 90 | Percentage | Trouble Keports to the total | | Resolution of : number of metering | | Monthly Meter | installations for which a Trouble Reports | monthly Meter — Trouble | _ Report was issued on | _ Timelinessof i Ratio of the actual number of 15 » 100 | | | MonthlyMeter | submitted metering data to | | DataDelivery | the expected number of | submitted metering data | | based on the number of | _ | ; _metering installations ; j | _Customer | Customer | Retail 100 90 | Page 38 of 40 === rmu-pages-74.ppm === Pern en lh : : I | Satisfaction | Satisfaction | MeteringServiceProvider | | Rating | Performance i | AppraisalbytheirCustomers i 8.4.4. Computation of Overall Performance The overall performance of the Retail Metering Services Provider shall be computed by summing the product of the rating of the Retail Metering Services Provider on each performance measure and the percent weight of the same performance measure as indicated in Table 5. 8.5. MONITORING PROCEDURES The Central Registration Body shall calculate the performance measures and the overall performance score (Refer to Section 8.4 for details) of each Retail Metering Services Provider on a monthly, semi-annual and annual basis. 8.5.1. Monthly Performance Monitoring After every billing period, the Central Registration Bodyshall release to concerned Contestable Customers, Suppliers and Retail MeteringService Providers the service delivery ratings (refer to Section 8.4.1) of their associated Retail Metering Service Provider. If requested, the Central Registration Body shall discuss the results of the performance monitoring with the concerned Contestable Customer, Supplier, or Retail Metering Service Provider. The results of the monthly performance monitoring shall be published in the market ulformation web site, 8.5.2. Semi-Annual Customer Satisfaction Monitoring Every six (6) months, the Ceitral Registration Body shall determine the customer satisfaction rating of the Retail Metering Services Providers through the issuance of the Customer Satisfaction Rating Sheetto all directCoitestable Customers and Suppliers. The Certral Registration Body shall require the direct Cortestable Customers and Suppliers to accomplish and submit theCustomer Satisfaction Rating Sheets back to the Ceitral Registration Body. The Customer Satisfaction Rating Sheets are to be accomplished every first week of July of the current year and January of the following year. The July rating shall determine the customer satisfaction performance of the Retail Metering Services Providerfrom January to June of the current year while the January rating shall determine the customer satisfaction performance of the Retail Metering Services Provider for the second half of the previous year (Le., July to December). 8.5.3. Annual Performance Monitoring The Annual Performance Monitoring of Retail Metering Services Providers covers the billing pertods January to December of each year. It shall consist of: a) The annual rating of the performance measures under Section 8.4.1 computed by averaging the ratings during the twelve (12) billing periods of the year, and “www. wesn.ph Page 39 of 40 === rmu-pages-75.ppm === b) The Annual Customer Satisfaction Rating computed by averaging the ratings from the two (2) semi-annual surveys. The Annual Performance of Retail Metering Services Providers shall be submitted by the Central Registration Body to the Philippine Electricity Market Corporation (PEMC) Management and published in the market information twoeb site. Page 40 of 40 === rmu-pages-76.ppm === Appendix A Site Equipment Identification Number Tables Table A-1. Meter Purpose Designations. Designation MeterPurpos | R Main Meter | Rl Alternate Meter(Partial RedundantMetering) | B Alternate Meter(Full KedundantMetering) B1 BackupMeter Table A-2. Metering Equipment, Devices and Auxiliaries Designations. Designation Description CT CurrentTransformer LA | Lightning Arrester MB MeterBox | MD Modem ME Multi-function ElectronicMeter(SmartMeter) PT Potential Transformer ST Jetering Structure TS Meter TestSw itch === rmu-pages-77.ppm === Appendix B Metered Participant ID Guidelines These guidelines shall be followed in the labeling and numbering of metering installations of Contestable Customers. N 4. The Metered Participant ID ofCouitestable Customers shall be identified by four (4) alpha-numeric characters except for cases cited in items5 and 6of these guidelines. The Metered Participant ID ofContestable Customers whose full name corresponds to a three-letter abbreviation shall be that three-letter abbreviation appended by the zero (0) character. Example: Contestable Customer Metered ParticipantID | American Power Conversion APCO | Bank of the Philippine Islands ; BPIO Cultural Center of the Philippines - CCPO | ; The Metered Participant ID ofCortestable Customers whose corporate name is composed of only one or two words shall be the first letter of the first word, the succeeding two (2) consonants of the first word, and the first letter of the second word or the zero (0) character, Example: | Contestable Customer ; ; ; [ __ Metered Participant ID | Amerton, Inc. AMRI - Ayala Corp. AYLC Lancaster LNCO Magic Mall MGCM | TIMEX | TMX0 The Metered Participant ID of Contestable Customers whose name consists of four (4) letters or less shall be its name itself appended by the zero (0) character, if necessary. Example: Contestable Customer | _Metered Participant [D | PHPC | PHPC The Metered Participant ID of Coitestable Customers that has n umeric characters in its corporate name shall be the numeric characters and the abbreviation of the alphabetic characters. Example: Contestable Customer 7 ‘Metered Participant ID | 14-678 PROPERTY HOLDINGS INC, 146PH 1590 ENERGY CORPORATION L59EC 18-2 PROPERTY HOLDINGS INC 182PH | === rmu-pages-78.ppm === 6. i 1. i 19-1 REALTY CORPORATION T9IRC 6-24 PROPERTY HOLDINGS INC. 624PH 6-3 PROPERTY HOLDINGS INC. | | 63PHI 21ST CENTURY STEEL MILLS, INC. 21CSM The Metered Participant ID of Contestable Customers that has several facilities in their name shall be composed of six (6) alpha-numeric characters. The Metered Participant ID shall be the combination of three (3) alpha-numericcharacters corresponding to the abbreviation of their corporate name, two (2) numeric characters corresponding to the facility number, and one (1) numeric character corresponding to the metering installation in that location. Example: : Contestable Customer ROBINSONS LAND CORP., Batangas RLCO11 ROBINSONS LAND CORP., Cavite RLCO21 ROBINSONS LAND CORP., Cavite RLC022 ROBINSONS LAND CORP., Laguna RLCO31 ROBINSONS LAND CORP., Makati City RLCO41 ROBINSONS LAND CORP., Mandaluyong | RLCOS1 | _ROBINSONS LAND CORP., Mandaluyong —_-RLC052 ROBINSONS LAND CORP., Mandaluyong RLC053 ROBINSONS LAND CORP., Mandaluyong | RLC054 | ROBINSONS LAND CORP., Mandaluyong RLC055 ROBINSONS LAND CORP.,, Mandaluyong RLC056 ROBINSONS LAND CORP., Mandaluyong | RLC057 “ROBINSONS LAND CORP., Manila L RLC061 J ROBINSONS LAND CORP., Manila ; RLC062 ROBINSONS LAND CORP., Manila. | «RLC063 ROBINSONS LAND CORP. , Pasig City RLCO71 | ROBINSONS LAND CORP., Quezon City RLCO81 ROBINSONS LAND CORP. Rizal RLC091 ROBINSONS LAND CORP., Bacolod RLC101 | | ROBINSONS LAND CORP, Cebu | RLCI1