DREAMS Project (Development for RE Applications Mainstreaming and Market Sustainability)

The Development for Renewable Energy Applications Mainstreaming and Market Sustainability (DREAMS) project was a collaborative DOE initiative with the Global Environment Facility (GEF) and the United Nations Development Programme (UNDP), implemented from 2016 to 2023 with a grant of USD 5.2 million [PEP 2023-2050 Vol. III, Section E, p.62, 2023].

Primary objective: Reduce GHG emissions by promoting and commercializing the RE market while addressing barriers to investment in RE-based power generation.

Project closure: Implementation completed 31 July 2023; operational and financial closure completed 31 December 2023; final accomplishment report approved 28 June 2023 by the DREAMS Project Steering Committee (chaired by DOE).

Components and Achievements

1. Supportive RE Policy Environment

Facilitated development and approval of the National Renewable Energy Program (NREP) for 2020–2040 (see National Renewable Energy Program (NREP) 2020-2040 ). Through technical expertise and stakeholder engagement, DREAMS contributed to the establishment of a favorable policy framework for RE growth.

2. Local Institutional Strengthening

Focused on three provinces: Iloilo, Palawan, and Lanao del Sur. Built capacity for local RE planning, empowering LGUs and electric cooperatives (ECs) with knowledge and resources for RE policy integration into local plans.

3. Capitalized RE Market

Played a pivotal role in establishing the Renewable Energy Registrar (RER) platform, operationalized in 2019. The RER facilitates efficient trading and transactions of RE certificates to increase the RE share in the power capacity mix — a precursor to the Renewable Energy Market (REM) .

4. RE Commercialization

Through the Support Facility for RE (SF4RE) — a USD 1 million DREAMS sub-facility — funded the installation of 18 local RE projects across communities, LGUs, and ECs, showcasing RE viability and fostering widespread adoption [NREP 2020-2040, pp.40-41, 2022]. Several projects involved NREP -aligned rooftop solar and microgrid installations in off-grid communities.

Full SF4RE project list (17 projects, Table 14) [NREP 2020-2040, Table 14, pp.51-53, 2022]:

CapacityProject / LocationProponent
49.25 kWSmart Grid Solar PV (165 HH) — Cagayancillo, PalawanPalawan EC + Cagayancillo LGU
Under dev.Solar PV + PURE — Carles, IloiloCarles LGU + Iloilo III EC
Under dev.PURE — Lanao del SurLanao del Sur Provincial Government
34.2 kWOriental Mindoro Green Energy Pilot (7 municipal + 7 faith-based bldgs + 1 livelihood center)Oriental Mindoro Provincial Gov’t + WeGen Laudato Si Inc. + Apostolic Vicariate of Calapan
25 kWBun-acan Micro-Hydro Rehabilitation + Irrigation (60 HH) — San Remigio, AntiqueAntique Provincial Gov’t + San Remigio LGU + Brgy. Panpanan I
22 kWMMSU Solar Powered Aquatic Life Support SystemMariano Marcos State University (MMSU)
6.48 kWPotable Water Systems (128 HH) — Tapaz, CapizTapaz LGU
1 MWMini-Hydro Plant Rehabilitation (11,035 HH) — Lawaan, SamarEastern Samar Electric Cooperative
45 kWMicro-Hydro Rehabilitation (9,984 HH) — Ajuy, IloiloAjuy LGU + Iloilo III EC
10 kWMicro-Hydro Rehabilitation (62 HH + 5 community facilities) — Upper Katablangan, ApayaoKatablangan Indigenous Farmers Association
42.84 kWSmart Grid Solar PV (300 HH) — Burdeos, QuezonEntrepreneurs du Monde + Quezon II EC
36 kWSolar PV Powered Bioethanol Distiller (3 barangays) — Aparri, CagayanAparri LGU + MMSU
75 kWSolar PV Rooftop — Iloilo Provincial HospitalIloilo Provincial Government + Iloilo II EC
29.3 kWSmart Grid Solar PV + Irrigation (120 HH) — Brgy. Apurawan, Aborlan, PalawanAborlan LGU + Palawan EC
20 kWPotable Water Systems (820 HH) — Goa, Camarines SurGoa LGU
39.65 kWCommunity Solar PV Mini-Grid (357 HH) — Pamilacan, Bohol
95 kWSolar PV Rooftop (10 LGU buildings) — Concepcion, Iloilo

[PEP 2023-2050 Vol. III, p.62, 2023; NREP 2020-2040, pp.40-41, 2022]

Local RE Planning (LREP)

The DREAMS project also led capacity building for Local Renewable Energy Planning (LREP) — enabling LGUs to integrate RE into their spatial and development plans. LREP was guided by DOE-DILG Joint Memorandum Circular No. 2020-01 (13 April 2020), the “LGU Energy Code,” which requires LGU Energy Sector Committees to prepare: (a) a Spatial Energy Plan, (b) a Development Plan incorporating ER 1-94 benefits, (c) regulatory reforms to streamline permitting within EVOSS periods, and (d) IEC campaigns [NREP 2020-2040, pp.40-41, 2022].

DREAMS conducted LREP with local government units in Iloilo, Palawan, Lanao del Sur, Oriental Mindoro, and with Mariano Marcos State University (MMSU) [NREP 2020-2040, p.40, 2022].