DC2023-06-0020 — Policy and Administrative Framework for Offshore Wind Development (OPAF)
Full title: Policy and Administrative Framework for the Efficient and Optimal Development of the Country’s Offshore Wind (OSW) Resources Short name: OPAF Parent instrument: EO 21 §2 (April 19, 2023) Companion instrument: DC2023-05-0013 (EO 21-IG) — covers development lifecycle; OPAF covers permitting governance Issued: June 2023 (signatory block reads “Secretary” — Secretary Lotilla at time of issuance) Effectivity: 15 days after publication in two newspapers of general circulation (approx. early July 2023) Sections: 20
Key Provisions
Sections 1–4: Title, Policy, Scope, Definitions
- OPAF governs all OSW Projects nationwide; applies to all departments, bureaus, agencies, GOCCs, LGUs, and entities involved in OSW permitting
- 4 policy declarations: energy transition/SDG7; energy self-reliance/fossil fuel reduction; streamline OSWESC via EVOSS; Whole-of-Government Approach
- Key definitions repeated from EO 21-IG; NSP defined by reference to WESM Rules
Section 5: Permits Submission
All Permitting Agencies submit to DOE by 18 June 2023: complete permit list + legal bases + online platform capability + focal unit contact + EVOSS-format process flow diagrams.
Section 6: Non-Compliance
- PA may rectify within 15 days (extendible once) from notice of deficiency
- Non-compliance = administrative offense under RA 11234
- Late requirements deferred to next 3-year review period
Section 7: Evaluation by EVOSS Secretariat — 7 Actions
- Remove duplicate/overlapping permits within and among PAs
- Simplify application forms, processes, requirements
- Remove duplicate/redundant requirements and those lacking legal mandate
- Ensure RA 11234 §13 EVOSS timelines
- Reduce signatories per RA 11032 (Ease of Doing Business Act)
- Rationalize fees per AO 31 s.2012 + DOF-DBM-NEDA JC 1-2013
- Automate, digitalize, integrate into EVOSS
ESC authority (President chairs): May remove entire agencies or permits for redundancy, lack of legal basis, or being outside the agency’s mandate.
Section 8: Resource Persons
Non-ESC PAs nominate a resource person upon submitting permit list; attends ESC meetings on request; submits revisions/clarifications; disseminates to PA offices.
Section 9: EVOSS Integration Timelines
- PAs with existing online portals: integrate within 1 year of OPAF effectivity
- PAs without online platform: coordinate with EVOSS Secretariat within 6 months
- “Status quo” processing during transition
- Post-integration: exclusively through EVOSS
Section 10: Philippine Offshore Wind Databank (POWD)
Repository of all OSW project documents in the Virtual Storage Public Data Center (VSPDC) of the EVOSS System.
Section 11: Monitoring and Evaluation
Within 1 year of effectivity, DOE + PAs develop M&E System as basis for periodic permit/fee review.
Section 12: OSWESC Guidelines
DOE to issue OSWESC award and administration guidelines (→ eventually DC2024-06-0018).
Section 13: Transmission
- NSP must prepare SGGP within 180 days of OPAF effectivity; ERC supports capex
- ERC must issue transmission rules per EO 21-IG §10 timeline (60 days)
- DOE + DENR + TransCo issue foreshore lease regulation for OSW transmission within 90 days
Section 14: Ports and Harbors
PPA + DOE + DOTr + BOI + DTI + OSW Developers: PPA prepares long-term Port Development Plan for OSW infrastructure (manufacturing, assembly, storage, operations).
Section 15: Safety and Security
DOE coordinates with DOTr, DND, DILG for intensified government presence in OSW areas.
Section 16: Marine Spatial Planning (MSP)
DOE + NAMRIA + DENR + DA develop MSP for OSW:
- Identify high-development areas
- Reduce uncertainties via spatial data
- Resolve protected area/no-build-up zone overlaps with existing WESCs
- Upskill agencies/stakeholders
Legacy WESC holders in no-build-up zones: submit revised contract area maps; reconfiguration allowed if adjacent area is (i) free, (ii) outside no-build-up zone, (iii) not larger than original.
Section 17: Penalties
RA 11234 Chapter III §§17–21 applies.
Pages Updated
wiki/pages/concepts/offshore-wind.md— Added OPAF governance section: permitting rationalization (7 actions + ESC removal power), EVOSS integration timelines, POWD, transmission mandates (NSP SGGP 180-day + foreshore lease 90-day), Port Development Plan, Marine Spatial Planning, Safety/Securitywiki/pages/concepts/evoss.md— Added OPAF EVOSS Secretariat evaluation powers (7 actions, ESC removal authority) and integration timelines (1yr/6mo)wiki/pages/concepts/sggp.md— Added OPAF NSP SGGP mandate for OSW within 180 days of OPAF effectivity