PEP 2023-2050 Vol. II — Section C: Renewable Energy (pp. 33–49)
Source document: raw/_pdf/planning-docs/pep-2023-2050-vol2.pdf, pages 33–49.
Extracted via pdftotext -f 44 -l 60 (PDF page offset: +11 front-matter pages).
Scope
Section C covers two sub-sectors:
- Biofuels (pp. 33–39): Accredited facilities, production data, R&D partnerships, biofuels roadmap, capacity expansion and investment targets
- Renewable Energy Systems (pp. 40–49): NREP 2020-2040, RE contracts portfolio, OSW (EO 21, OPAF, foreign ownership), onshore wind, floating solar, WTE, CREZ Phase 2, RPS amendments, GEAP (GEA-1/GEA-2), REM, FiT, GEOP, Net Metering, ERSP, RETF, geothermal derisking, RE investment/employment table
Key Facts
Biofuels
- 25 accredited facilities, 1,143.9 MLPY capacity (12 biodiesel at 677.9 MLPY + 13 bioethanol at 466.0 MLPY)
- 2022 production: biodiesel 203.4 ML (+2.7%), bioethanol 374.8 ML (+5.7%)
- 6 more facilities with Notice to Proceed (371.88 MLPY); 2 commissioned June 2023 (Bio Renewable Energy Ventures 150 MLPY + Seaoil 11.23 MLPY)
- R&D: UPLB (coconut oil — B5=3.2% GHG reduction, B20=12.9%); MMSU (nipa sap, 3,500L anhydrous at 99.73% purity); DOST-ITDI (CME+UCOME 4:1 binary blend); NSEBIO (bagasse/Napier grass, 292L/dry-ton)
- Roadmap: B2→B5 biodiesel by 2026 (1% annual increment); E20 voluntary; 2nd-gen bioethanol integration; full RA 9367 compliance by 2050
- 2050 CES investment: biodiesel PhP 697.5M / 140 jobs (134.5 MLPY extra); bioethanol PhP 43,291M / 4,298 jobs (100% local production)
RE Systems
- NREP 2020-2040 adopted 19 July 2022: 35% RE by 2030, 50% by 2040; NREP 2023-2050 planned
- 1,141 RE service contracts, 121.0 GW potential, 5.7 GW installed (Sept 2023)
- OSW: 81 contracts, 62.2 GW (Dec 2023); EO 21 (19 Apr 2023) + EO 21-IG DC2023-05-0013 + OPAF DC2023-06-0020
- 100% foreign ownership in solar/wind/hydro/ocean: DC2022-11-0034; CINMF (Denmark) first 100%-foreign = 2,000 MW; 4 more = 3,523 MW
- Onshore wind: 160 MW Pagudpud, Ilocos Norte (PhP 11.4B, 19 May 2023 inauguration) — largest in PH; Phase 1 = 80 MW, Phase 2 = 80 MW (June 2024)
- Floating solar: 9 SEOCs, 1,135.3 MW in Laguna Lake (LLDA 2,000 ha PDAs)
- WTE: 12 facilities, 60.193 MW; 113.96 MW potential; WTE Bill pending
- CREZ Phase 1 = 25 zones, 152,097 MW potential; Phase 2 = implementation support, load modeling, energy storage modeling
- RPS: annual increment 1% → 2.52% (DC2022-09-0030); on-grid amendments DC2023-05-0015; enforcement DC2023-12-0032; off-grid DC2023-05-0014
- GEAP: GEA-1 (17 Jun 2022) = 1,866 MW; GEA-2 (3 Jul 2023) = 3,441 MW from 105 bidders (delivered 2024-2026)
- REM: Interim commercial ops declared 10 Jun 2022 (DC2022-06-0019); full ops pending
- Preferential dispatch: DC2022-10-0031 grants all RE units must/priority dispatch in WESM
- GEOP: 19 permits issued; 286 customers / 96.3 MW (Dec 2023)
- Net Metering: Guidebook 22 Apr 2022; 11,707 end-users / 101.5 MWp (Dec 2023)
- FiT: ROR hydro target 250 → 350 MW (Jun 2022 cert); 174.63 MW unsubscribed; full sub. by 2025
- ERSP: DC2023-12-0035; 3 models: Supply Contingency, Lease-to-Generate, Peer-to-Peer Trading
- RETF: DC2022-06-0018; PNOC + PAGCOR + PCSO are contributors; DOST MOA under consideration
- Geothermal derisking roadmap: ADB partnership, kicked off 20 Sep 2022; 5-report program
- RE investment (pre-dev, 2023-2050): REF 98,502 MW / PhP 35.3B / 49,411 jobs; CES-1 106,568 MW / PhP 28.6B / 65,709 jobs; CES-2 106,952 MW / PhP 29.7B / 115,173 jobs (OSW = 91,783 CES-2 jobs)
Pages Created or Updated
| Action | Page |
|---|---|
| Created | Biofuels Industry (Philippines) — production capacity, R&D, roadmap, investment tables |
| Created | National Renewable Energy Program (NREP) 2020-2040 — NREP 2020-2040 targets, mechanisms, RE portfolio |
| Created | Green Energy Auction Program (GEAP) — GEA-1 and GEA-2 results, OCSP4 |
| Created | Net Metering Program — guidebook, 11,707 users/101.5 MWp, relation to GEOP/ERSP |
| Created | Renewable Energy Market (REM) — REM framework, interim commercial ops, RE Registrar functions |
| Created | Expanded Roof-Mounted Solar Program (ERSP) — DC2023-12-0035, 3 business models |
| Created | Waste-to-Energy (WTE) — 12 facilities/60 MW, WTE Bill, floating solar in Laguna Lake |
| Created | Feed-in-Tariff (FiT) System — ROR hydro 350 MW target, 174.63 MW unsubscribed, transition to GEAP |
| Updated | Renewable Energy Targets 2023-2050 — added NREP context, RE contracts stats, all enabling mechanism links |
| Updated | Offshore Wind (OSW) — EO 21, OPAF, 62.2 GW contracts, 100% foreign ownership, CINMF |
| Updated | Competitive Renewable Energy Zones (CREZ) — CREZ Phase 1 (25 zones, 152,097 MW) and Phase 2 details |
| Updated | Renewable Portfolio Standards (RPS) — 3 additional DCs, RE Certificate compliance note |
| Updated | Green Energy Option Program (GEOP) — Dec 2023 figures (286 customers/96.3 MW), table added |
| Updated | MOC: Philippine Energy Plan 2023-2050 — Volume II — Section C ingested; biofuels + RE systems summaries |
| Updated | meta/entities.md — added 15 new entities (NBB, PCA, UPLB, MMSU, CINMF, LLDA, PAGCOR, PCSO, Carbon Trust, GWEC, 5 others) |
| Updated | meta/index.md — added 7 new pages + Section C source summary |
Raw extraction: pdftotext output