PEP 2023-2050 Vol. II — Section B: Downstream Industry (pp. 13–32)

Source document: raw/_pdf/planning-docs/pep-2023-2050-vol2.pdf, pages 13–32. Extracted via pdftotext (PDF page offset: +11 front-matter pages).

Scope

Section B covers:

  • Natural Gas Industry (pp. 13–20): Malampaya gas fleet, 7 LNG projects, PDNGR regulatory framework, Natural Gas Bill, GPDP, SSLNG, investment/employment
  • Oil Industry (pp. 21–32): LFROs, LPG establishments, storage infrastructure, RA 11592, E20/biodiesel blends, Fuel Subsidy Project, DOOP, Philippines as Oil Hub aspiration, taxation comparison, investment requirements

Key Facts

Natural Gas

  • Natural gas = 4.2% of TPES; 16.0% of electricity in 2022; 5 gas plants, 3,730.6 MW combined
  • Production: 113,611 MMSCF (2022), −6.2% from 121,089 MMSCF (2021); consumption: 108,567 MMSCF
  • Ilijan GSPA expired June 2022 → 1,200 MW lost from Luzon grid; 4 plants remain on Malampaya gas
  • Malampaya can extend supply to 2027 but not at usual production rate
  • 7 DOE-approved LNG projects, 21.98 MTPA aggregate
  • FGEN first LNG delivery April 2023 (UAE); FSRU BW Batangas arrived 16 June 2023 (162,524 m³, 500 MMSCF/day)
  • 5 LNG projects: USD 865.4M / PhP 43.3B; 4,507 jobs
  • Additional REF capacity: 3.98 MTPA (PhP 47.3B onshore or PhP 11.1B FSRU); CES: none needed
  • PDNGR (DC 2017-11-0012): revised end of 2023; TPA no longer mandatory; aggregator accreditation introduced
  • Natural Gas Bill: HOR TWG approved consolidated HB 24 May 2023; SB 152 in Senate
  • LNG tax-exempt: no excise (NIRC), no customs duty (ASEAN/MFN tariff), RA 9337 removed 2% mineral excise
  • GPDP (US Dept of State-funded, DOE + UP-SCRFI + UP-NEC): 3 phases; published Natural Gas Development Plan; LNG Investors’ Guide
  • MOU with MAN Energy Solutions (22 Feb 2022): SSLNG feasibility for Visayas and Mindanao

Oil Industry

  • Oil = 32.2% TPES (19.8 MTOE); imported 19.47 MTOE; domestic only 0.36 MTOE
  • LFROs: 10,802 → 11,923 (+10.4%); LPG establishments: 10,959 → 13,924 (+27.1%)
  • Storage: 151 facilities, 41,634 MB; import terminals 63.9%; Petron Bataan refinery 23.1%; depots 13.0%
  • Sole refinery: Petron Bataan (Shell Tabangao converted to import terminal)
  • RA 11592 (LPG Industry Regulation Act 2021): 6 implementing DCs/JDCs promulgated 2021–2023
  • E20 voluntary advocacy; biodiesel B2→B3 (2024)→B4 (2025)→B5 (2026)
  • Fuel Subsidy: PhP4B (PhP3B Pantawid Pasada + PhP1B farmers/fisherfolk); crude oil trigger being shortened 3mo→1mo
  • DOOP: DOE-Appcentric Solutions digital platform for DOI reporting; targeted early 2024
  • DOE-BOC-BIR MOA (27 May 2021): information exchange on petroleum imports
  • Additional depot: +16,686 MB REF (PhP 98.6B, 18,474 jobs) / +12,811 MB CES (PhP 81.05B, 15,181 jobs)
  • Additional import terminal: +6,913 MB REF only (PhP 25.0B, 1,312 jobs); CES needs none

Pages Created or Updated

ActionPage
Major updateLNG Imports as Transition Fuel — Vol. II LNG project details, regulatory framework, taxation, legislation, GPDP, SSLNG, investment
CreatedDownstream Oil Industry — oil sector structure, LFROs, LPG, storage, RA 11592, E20/biodiesel, Fuel Subsidy, investment
UpdatedMOC: Philippine Energy Plan 2023-2050 — Volume II — Section B from Pending to Ingested; content populated
Updatedmeta/entities.md — added 8 LNG proponents + DOF + BIR + BOC
Updatedmeta/index.md — added downstream-oil concept and Section B source summary

Raw extraction: pdftotext output