PEP 2023-2050 Vol. II — Section A: Conventional Energy (pp. 1–12)
Source document: raw/_pdf/planning-docs/pep-2023-2050-vol2.pdf, pages 1–12.
Scope
Section A covers the DOE’s roadmaps and accomplishments for the conventional energy sub-sector, divided into:
- Oil and Gas (pp. 1–9) — PCECP, active service contracts, Malampaya SC 38 renewal, petroleum reserves, upstream roadmap, investment targets
- Coal (pp. 10–12) — 2022 coal statistics, COC activity, new COC awards, reserves, supercritical plants, upstream roadmap, CCUS/SEACA, planned policies
Key Facts
Oil and Gas
- PCECP governs SC and COC awards (DC2017-12-0017 and DC2017-09-0010); received applications for 16 petroleum SCs since November 2018
- 18 active SCs as of 31 December 2023: 6 production, 12 exploration
- 2022 combined production: 558.27 MB oil + 112.17 BCF gas + 2.71 MMB condensate
- Malampaya SC 38: GSPA expired June 2022; original contract concluded February 2024; Renewal Agreement signed by President Marcos Jr. on 15 May 2023; extended 15 years to 22 February 2039; 147 BCF remaining reserves; minimum 2 deep-water wells required in Sub-Phase 1 (2024–2029)
- SC 77 awarded April 2022 (Cotabato basin); SC 79 awarded August 2023 (East Palawan, 932,000 ha) to PNOC-EC
- IEB Circular (6 July 2023) enables joint DOE-MENRE SC/COC awards in BARMM under RA 11054
- Total upstream investment: PhP 145.2B oil + PhP 2.2T gas through 2050
Coal
- Coal: ~60% of power generation in 2022
- Domestic production: 16.06 MMMT; total consumption: 36.14 MMMT; import gap: ~20 MMMT (97.7% from Indonesia)
- 29 active COCs as of 30 June 2023 (20 production/development, 9 exploration)
- 5 new COCs awarded 2021–2023 (COC 204–208)
- Resource potential: 2,366.7 MMMT; mineable reserves: 386 MMMT; largest deposit: Semirara Island (~550 MMMT)
- Supercritical plants: SBPL 528.1 MW (2019), Masinloc 351.8 MW (2022), GNPower Dinginin 2×725 MW (2021/2022)
- DOE participated in SEACA May 2023; exploring CCUS for coal transition strategy
Pages Created or Updated
| Action | Page |
|---|---|
| Created | MOC: Philippine Energy Plan 2023-2050 — Volume II |
| Created | Petroleum Service Contracts (PSCs / SCs) |
| Created | Upstream Coal Sector |
| Updated | Malampaya Gas Field — SC 38 renewal details, confidence → high |
| Updated | Energy Import Dependency — coal import volume data, Semirara entity name fix |
| Updated | Coal Moratorium (2020) — CCUS/SEACA context |
| Updated | meta/entities.md — Semirara name corrected; PNOC-EC added |
Raw extraction: pdftotext output