NREP 2020-2040 §F — Annex: RE Facilities as of 2021
Source: raw/_pdf/planning-docs/nrep-2020-2040.pdf
Chapter: Annex (RE Facilities as of 2021, Tables 16–23)
Pages: pp. 66–90 (PDF pp. 79–104; offset = 13)
Scope
The document’s closing Annex — installed RE capacity by technology as of 2021 (Tables 16–23), split between facilities newly built under the RE Act and legacy facilities, with a consolidated installed-capacity summary.
Annex: RE Facilities as of 2021 — Aggregate Capacity Totals
Table 16: Biomass (new under RE Act) — 37 projects
Total: 550.04 MW [NREP 2020-2040, Table 16, pp.68-70, 2022]
Breakdown: predominantly bagasse-fired cogeneration plants in Negros Occidental (Victorias, San Carlos, Kabankalan, Silay, Binalbagan); rice husk-fired plants in Central Luzon (Isabela, Nueva Ecija, Tarlac); landfill methane recovery (Rodriguez/Montalban Rizal 8.325 MW + Payatas Quezon City 0.876+0.624 MW); biogas in South Cotabato (Biotech Farms 3.50+5.96+3.90+8.45 MW).
Table 17: Geothermal (new under RE Act) — 5 units
Total: 345.5 MW [NREP 2020-2040, Table 17, pp.71-72, 2022]
| Project | Location | Company | Capacity (MW) |
|---|---|---|---|
| Maibarara 1 Geothermal PP | Batangas | Maibarara Geothermal Inc. | 20 |
| Maibarara 2 Geothermal PP | Batangas | Maibarara Geothermal Inc. | 12 |
| Bacon-Manito GPP | Sorsogon/Albay | Bac-man Geothermal Inc. | 150 (60+60+20+10) |
| Nasulo GPP | Negros Oriental | Energy Development Corporation | 30 |
| Tongonan 1 GPP | Leyte | Green Core Geothermal Inc. | 133.5 (41+41+41+10.5) |
Table 18: Geothermal (legacy with service/operating contracts) — 6 projects
Total: 1,763.07 MW [NREP 2020-2040, Table 18, pp.72-74, 2022]
Key operators: AP Renewables Inc. (Tiwi ~344 MW + Mak-Ban ~316 MW); Energy Development Corporation (Northern Negros ~49.375 MW + Palinpinon ~75+37.5+37.5+37.5 MW + Tongonan/Leyte ~77.5+77.5+77.5+16.7+60+60+60+6.5×6 MW + Mt. Apo ~54.24+54.24 MW); Green Core Geothermal Inc. (Tongonan 1 units 20 MW×4)
Table 19: Solar (new under RE Act) — 60 projects
Total: 1,169 MW [NREP 2020-2040, Table 19, pp.75-79, 2022]
Largest: Calatagan Solar (Batangas, Solar Philippines Calatagan) 100.613 MW; Kabankalan Solar 132.50 MW; Lian Solar 80.923 MW; Digos Solar 48 MW; Tagum Solar 58.98 MW; Palawan Solar (Sabang REC) 63.30 MW; Toledo Solar 60 MW; Ormoc Solar 49.81 MW; San Carlos solar cluster (SACASOL I-A to I-D, San Carlos Solar Energy) = 13+9+23 MW.
Table 20: Hydropower (new under RE Act) — 33 projects
Total: 240.98 MW [NREP 2020-2040, Table 20, pp.80-83, 2022]
Largest: Hedcor Bukidnon projects (Manolo Fortich 1: 45.936 MW + Manolo Fortich 2: 27.387 MW); Sibulan A (Hedcor): 26 MW; Sibulan B (Hedcor): 16.5 MW; Sabangan HPP (Hedcor Sabangan): 14 MW; Irisan 1 (Hedcor): 3.8 MW. Small run-of-river plants dominate (most under 5 MW). Provincial governments of Ifugao own two small plants (0.20 MW + 0.82 MW).
Table 21: Hydropower (legacy with service/operating contracts) — 32 plants
Total: 904.30 MW [NREP 2020-2040, Table 21, pp.83-85, 2022]
Key operators: HEDCOR Inc. (dominant); SN Aboitiz Power - Magat (Magat 360 MW — largest in table); SN Aboitiz Power - Benguet (Ambuklao 104.55 MW); First Gen Hydro Power Corp. (Masiway + Pantabangan 12+120.80 MW); Luzon Hydro Corp. (Bakun AC 70 MW); CBK Power Company (Caliraya 35 MW + Botocan 23 MW); Sta. Clara Power Corp. (Loboc + Upper Cawayan)
Table 22: Hydropower (legacy without contracts) — 23 plants
Total: 2,638.74 MW [NREP 2020-2040, Table 22, pp.84-86, 2022]
Key owners: PSALM (dominant — Agus complex I+II+IV+V+VI+VII + Pulangi IV 255 MW + Pantabangan portion); CBK Power Company Ltd. (Caliraya + Botocan + Kalayaan 736 MW — the Philippines’ primary pumped-storage hydropower facility); San Roque Power Corporation (San Roque 411 MW, Pangasinan); Angat Hydropower Corporation (Angat 246 MW); California Energy Casecnan (Casecnan 165 MW)
Note on Agus complex (PSALM): Agus I (80.46 MW) + Agus II (180 MW) + Agus IV (158.1 MW) + Agus V (55.25 MW) + Agus VI (219 MW) + Agus VII (54 MW) = 746.81 MW from the Agus River cascade in Lanao del Sur — the Philippines’ single largest RE resource cluster.
Table 23: Wind (new under RE Act) — 7 projects
Total: 442.90 MW [NREP 2020-2040, Table 23, pp.86-87, 2022]
| Project | Location | Company | Capacity (MW) |
|---|---|---|---|
| Burgos Wind Power Project | Ilocos Norte | EDC Burgos Wind Power Corp. | 150.00 |
| Caparispisan Wind Power Project | Ilocos Norte | North Luzon Renewable Energy Corp. | 81.00 |
| Bangui Bay Wind (Phases 1-3) | Ilocos Norte | NorthWind Power Development Corp. | 51.90 (24.75+8.25+18.90) |
| Pililla Wind Power Project | Rizal | Alternergy Wind One Corp. | 54.00 |
| Puerto Galera Wind Power Plant | Oriental Mindoro | Philippine Hybrid Energy Systems, Inc. | 16.00 |
| San Lorenzo Wind Power Project | Guimaras | Trans-Asia Renewable Energy Corp. | 54.00 |
| Nabas Wind Power Project | Aklan | PetroWind Energy Inc. | 36.00 |
Summary: Philippine RE Installed Capacity as of 2021
| Technology | New (under RE Act) | Legacy/Other | Total |
|---|---|---|---|
| Solar PV | 1,169 MW | — | 1,169 MW |
| Wind | 443 MW | — | 443 MW |
| Hydropower | 241 MW | 3,543 MW (legacy) | 3,784 MW |
| Geothermal | 346 MW | 1,763 MW (legacy) | 2,109 MW |
| Biomass | 550 MW | — | 550 MW |
| TOTAL RE | 2,749 MW | 5,306 MW | ~8,055 MW |
Hydro legacy = Table 21 (904 MW with contracts) + Table 22 (2,639 MW without contracts). This ~8,055 MW baseline is consistent with NREP Ch.I which reports 7,399 MW RE as of 2019, growing with 2020-2021 additions (primarily solar and geothermal). The dominant hydro legacy (Agus cascade + Pulangi IV + San Roque + CBK) represents pre-RE Act infrastructure that the NREP builds upon.
Raw extraction: pdftotext output