National Total Electrification Roadmap (NTER) 2023-2032

The National Total Electrification Roadmap (NTER) 2023-2032 is the government’s comprehensive strategic plan to achieve 100% household electrification by 2028, consolidating the government’s initiatives, interventions, and strategies for bringing sustainable electricity services to unserved and underserved communities [PEP 2023-2050 Vol. II, p.103, 2023].

Published: 27 October 2023. The NTER is mandated by Section 4(q) and Section 12(a) of RA 11646: DOE must prepare and publish the NTER annually on its website in consultation with public and private stakeholders [RA 11646, Sections 4(q), 12(a), 2022]. The NTER consolidates Local Total Electrification Roadmaps (LTERs) from individual DUs and integrates the Missionary Electrification Development Plan (MEDP). Statute requires it to be incorporated in the Philippine Energy Plan.

The Two Electrification Baselines

The Philippines tracks household electrification through two different measurement bases, which yield materially different rates [PEP 2023-2050 Vol. II, p.103–104, 2023]:

BasisPotential HHsServed (2022)Electrification Rate
DU-reported (2015 PSA Census)22,984,97125,914,07396.2%
NTER basis (2020 Census of Population and Housing)27,727,23225,273,388 (June 2023)91.15%

The NTER adopts the larger 2020 Census base, which captures a higher universe of households and therefore shows a lower electrification rate. Both figures are accurate — they reflect different counting methodologies. The NTER figure is the operative planning target.

Electrification Status

By Grid (December 2022 — DU Data)

GridPotential HHsServed HHsUnserved HHsRate
Luzon13,318,26116,092,459148,43598.89%
Visayas4,401,6984,834,595105,11097.61%
Mindanao5,265,0124,987,019625,68788.12%
Philippines22,984,97125,914,073879,23296.17%

[PEP 2023-2050 Vol. II, Table 49, 2023]

By Grid (June 2023 — NTER/2020 Census Basis)

GridPotential HHsServed HHsUnserved HHsRate
Luzon16,415,20115,800,632614,56996.26%
Visayas5,161,1824,612,844548,33889.38%
Mindanao6,150,8494,859,9121,290,93779.01%
Philippines27,727,23225,273,3882,453,84491.15%

[PEP 2023-2050 Vol. II, Table 50, 2023]

BARMM is the critical gap: As of December 2023, only 43.1% of BARMM households have electricity access (339,985 of 789,013 potential households) — the lowest electrification rate in the Philippines [PEP 2023-2050 Vol. II, p.109, 2023]. See BARMM Energy Policy .

NTER Targets 2023–2028

YearPotential HHsTarget AddedTotal ServedUnservedRate
202327,727,232536,58525,809,9011,917,33193.09%
202427,953,853698,23226,508,1332,143,952 (incl. new HHs)94.83%
202528,345,104937,91527,446,0481,836,97196.83%
202628,726,822890,18028,336,2281,280,77398.64%
202729,106,499756,21329,092,441770,27099.95%
202829,487,334394,89329,487,334394,891100.00%

[PEP 2023-2050 Vol. II, Table 56, 2023]

For the period 2024-2028, approximately 3.677 million households require electricity services — 2.706 million within EC franchise areas and 0.971 million within PIOU/LGOU areas.

Governance: Total Electrification Steering Committee (TESC)

Created by DO 2022-12-0016 (21 December 2022) to oversee implementation of electrification plans and programs [PEP 2023-2050 Vol. II, p.108, 2023]:

The TESC formulates and consolidates programs for provision of electricity to unserved and underserved areas identified by DUs and other responsible entities.

Key Electrification Programs

Nationwide Intensification of Household Electrification (NIHE)

Grid-connected program that subsidizes household wiring and kWh meter installation for previously unserved households within existing EC and DU franchise areas. As of 2022: 274,035 households energized of 344,090 with approved house wiring and meter subsidies. COVID-19 community quarantines halted installation activities for some beneficiaries; the DOE drafted an Advisory to guide DUs on fund releases and inspection upon completion [PDP 2023-2050, p.33, 2025].

Sitio Electrification Program (SEP)

Grid-connected electrification program for remote sitios. As of November 2023: 1,006 of 1,085 targeted sitios energized for the year. NEA targets energizing 10,535 sitios by end of the Marcos Jr. administration [PEP 2023-2050 Vol. II, p.104, 2023].

Solar Photovoltaic Mainstreaming (PV-SHS)

Off-grid electrification using portable photovoltaic solar home systems (PV-SHS). Joint DOE and European Union Access to Sustainable Energy Programme (EU-ASEP) undertaking; NEA is implementing agency [PEP 2023-2050 Vol. II, pp.105-106, 2023]:

GridPV-SHS Installed (June 2023)
Luzon8,251
Visayas2,667
Mindanao58,647
Total69,565

DOE distributed 10,000 units to franchise areas of BISELCO, PALECO, ORMECO, OMECO, and ANECO. DOE also signed a MOA with NEA and NPC for electrification projects totaling PhP811 million under the Total Electrification Project (TEP).

DOE Locally Funded Projects (PVM-LFP) — Completed as of December 2022: Seven EC projects; 11,113 total households [PDP 2023-2050, Table 17, 2025]:

Electric CooperativeHHsStatus
QUEZELCO II1,333Completed
BISELCO3,711Completed
BOHECO II530Completed
SULECO2,575Completed
ZAMSURECO I1,129Completed
ILECO II706Completed
BISELCO (Batch 2)1,129Completed
Total11,113

ERC endorsements for all completed PVM projects were made by DOE pursuant to ERC Resolution No. 17 s.2017.

EU-ASEP PVM Component — 40,500 PV-SHS households across six ECs, split into two windows [PDP 2023-2050, Table 18, 2025]:

WindowHHsImplementing AgencyStatusECs
Window 110,000LGUGCCompleted March 2019COTELCO, DASURECO, SOCOTECO II, SUKELCO
Window 230,500NPCCompleted September 2022FIBECO, BUSECO, COTELCO, SUKELCO, DASURECO, SOCOTECO II
Total40,500

Window 1 was financed by the EU and GPOBA (Global Partnership on Output-Based Aid Grants). Window 2 was EU-financed only.

Barangay Line Enhancement Program (BLEP)

Converts barangays previously energized by off-grid means (small gensets, solar home systems, micro-hydro) to grid connection. Also covers improvement of tapping points and installation of underground/submarine cables. For the period 2022–2026: 166 barangays targeted with a proposed budget of PhP 2.4 billion (to be proposed in the GAA and subject to national government subsidy) [PDP 2023-2050, p.33, 2025].

MGSP-CSP (Microgrid System Provider — Competitive Selection Process)

First invitation to bid released 27 October 2023: 98 areas / 15,645 households — representing 39% of unserved/underserved households deemed viable for microgrid systems based on household count, density, and demand. Notice of Awards expected end of March 2024 [PEP 2023-2050 Vol. II, p.108, 2023].

LFP-TEP Expansion

The LFP-TEP commenced in 2021 with NEA and NPC as implementers. The PDP 2023-2050 roadmap identifies a policy revision to expand eligible implementers to include Higher Educational Institutions (HEIs), Non-Governmental Organizations (NGOs), and qualified Distribution Utilities, beyond NEA and NPC, to accelerate 100% household electrification by 2028 [PDP 2023-2050, Ch.3 Sec.7.3c, p.125, 2025].

New Electrification Technology Tools

Visual Mapping Platform (Philippine Space Agency): DOE is developing a satellite imagery platform using PhilSA services for real-time profiling of target NTER unserved households and areas. The platform assists in due diligence for MGSP-CSP proponents and enables DOE monitoring of communities served by off-grid solutions [PDP 2023-2050, Ch.3 Sec.7.4a, p.125, 2025].

Crowdsourcing Application (Phases 1-2): DOE plans to develop a crowd-sourcing platform for voluntary reporting of unenergized household locations, enabling DOE/NEA/NPC/DUs and third-party implementers to identify and address unelectrified areas with appropriate solutions [PDP 2023-2050, Ch.3 Sec.7.4b, p.125, 2025].

PVM Dashboard: Launched as an initial step — covers existing microgrid and PV mainstreaming installations, statistics, and comprehensive listings [PDP 2023-2050, Ch.3 Sec.7.4, p.125, 2025].

Local Total Electrification Roadmap (LTER)

Under RA 11646 (Microgrid Systems Act) Section 15, each DU must integrate its Local Total Electrification Roadmap (LTER) into its DDP. DOE will issue a supplemental policy on LTER Development Guidelines to harmonize LTER preparation with DDP. The LTER will replace the barangay and household electrification provision previously in the DDP [PDP 2023-2050, Ch.3 Sec.7.3a, p.124, 2025].

ER 1-94 Funds Status

As of June 2023: PhP5.091B disbursed (79.2%) of PhP6.425B total reconciled ER 1-94 funds; PhP1.334B remaining [PEP 2023-2050 Vol. II, Table 52, 2023]:

Fund TypeTotal (PhP B)Disbursed (PhP B)Remaining (PhP B)% Disbursed
Electrification Fund (EF)3.4362.4360.999570.91%
Development and Livelihood Fund (DLF)1.4741.3190.15589.50%
RWMHEEF1.5161.3360.18088.12%
Total6.4255.0911.33479.23%

COVID Sunset Clause: DOE Advisory dated 8 May 2023 invoked Section 10 (Sunset Clause) of DC2020-04-0008, reverting the Electrification Fund (EF) component of ER 1-94 back to its original purpose — total electrification of unserved and underserved areas — as the COVID-19 public health emergency has effectively ended. See Energy Regulations 1-94 (ER 1-94) .

Electrification Roadmap Summary

HorizonPriority Actions
Short-term (2023-2024)Publish NTER; conduct initial MGSP-CSP; issue grid-tied microgrid policy; achieve annual targets (2020 Census basis); improve access statistics
Medium-term (2025-2028)Achieve 100% electrification by 2028; full RA 11646 rollout; MGSP-CSP continuation
Long-term (2029-2050)Ensure access for all households as population grows; continuous policy improvement
2050 ObjectiveElectricity access for all